You are on page 1of 2

1

EWSD

Q.1.

Fill in the blanks

(4)

(a) DLUC0 & DLUC1 work on load sharing basis. (b) SN0 & SN1 work on hot standby basis. (c) MB(0) & MB(1) work on load sharing basis. (d) BAP(0) & BAP(1) work on hot standby basis for O&M functions. (load sharing/hot standby)

Q.2.

Fill in the blanks (a)

(7)

The channel registers are available in CP , whereas the call registers are

available in GP.

(b)

During the speech phase, metering information is stored in GP.

(c)

The DTMF digits during normal exchange operation are stored/ processed in CRP. whereas during stand-alone operation of R-DLUs EMSP module will be used for this

purpose.

(d) (e)

The load parameter to be used for creation of an LTG for connecting a line unit via V5.2 interface will be 52. Maximum number of PDCs used for connecting the DLUD with LTGs is 4 whereas this figure will be 16 if we are to connect DLUG to the LTGs.

Q.3.

True/False

(4)

(a)

If DLUC0 fails, DLUC1 will process the information for DIUD0 also.

- False

2
(b) During normal operation both the BAPs handle O&M functions & their share of - False -False

call processing functions ? (c) (d)

CAP can replace the functionality of BAP SPARE

In an R-DLU, under normal operation the intra-DLU calls (Calls within the DLU) will -False

be handled by SASC (Stand-alone service controller).

Q.4.

Where do we extend fire and air-conditioning alarms in the main exchange? (Mention the Unit name and the card name). SYPD, RM:EA (2)

Can we extend these alarms from Remote DLU sites also? If yes, on which card?

(1)

Yes, ALEX
Q.5. What devices can be connected via IOP UNI One O&M terminal (OMT or BCT boot or Netm Boot), MDD, MOD &MTD (4)

You might also like