TYPE OF WORK
I EARTHWORKS / CIVIL WORKS EXCAVATION LOOSE SAND CLAY OR HEAVY FILL ROCK OR ADOBE BACKFILLING OR BREAKING ORDINARY FILL SPREADING, TAMPING, GRADING PLACING OSCOMBRO FILL REMOVING CONCRETE SLAB (JACKHAMMER) REMOVING CONCRETE SLAB (MANUAL MASON) LOADING AND DISPOSAL SHOVELLING & LOADING IN TRUCK BY HAND DISPOSAL OF UNSUITABLE MTRLS BY HAND SITE GRADING
NO. OF LABOR
CAPABILITIES day/unit
0.3333 per cu.m. 0.5000 per cu.m. 1.0000 per cu.m. 0.1667 0.0667 0.0667 0.1250 0.1667 per cu.m. per cu.m. per cu.m. per cu.m. per cu.m.
II CARPENTRY WORKS FORMS & SCAFFOLDS FTGS., GRADE BEAMS, COLUMNS BEAMS, TIE BEAMS, FLOOR SLABS ROOF BEAMS ROOF SLABS RETAINING WALL FORM OIL APPLICATIONS STRIPPING FORMS STAIRS & LANDING ERECTION OF SCAFFOLDINGS ROOF FRAMING TRUSSES (WOOD) RAFTERS (WOOD) PURLINS (WOOD) FASCIA BOARD BOLTS INSTALLATION (MANUAL) PARTITION & CEILING WORKS CEILING JOIST ERECTION OF WALL STUDS PLYWOOD CEILING OR WALL S-CUT SIDING CABINETS FRAMING BOARDING PLYWOOD SHEETING CABINET & DOORS FLOOR FRAMING FLOOR JOISTS (2"x6" - 2"x8") FLOOR JOISTS (2"x10" - 2"x12") GIRDERS & CORBELS (3"x6" - 3"x14") PLYWOOD SUB-FLOORING INTERIOR TRIM (OTHERS) BASEBOARD WOOD MOULDINGS WOOD HANDRAILS III CONCRETING & MASONRY WORKS CONCRETING READY-MIXED CONCRETING W/ PUMPCRETE CONCRETING OF PLAIN FLOORING CONCRETING OF REINFORCED FLOORING
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter carpenter
0.3125 0.3509 0.3774 0.4167 0.3096 0.0750 0.1000 0.6192 0.0031 0.0200 0.0040 0.0200 0.0250 0.1429 0.0385 0.0370 0.0714 0.2353 0.0333 0.0250 0.1435 0.2688 0.0036 0.0027 0.0029 0.0088
per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per bd.ft. per bd.ft. per bd.ft. per bd.ft. per bd.ft. per pcs. per bd.ft. per bd.ft. per sq.m. per sq.m. per bd.ft. per bd.ft. per sq.m. per sq.m. per bd.ft. per bd.ft. per bd.ft. per sq.m.
0.0156 per linear mtr. 0.0088 per linear mtr. 0.0444 per linear mtr.
TYPE OF WORK
CONCRETING OF FTGS. CONCRETING OF COL & BEAM CHB & ADOBE LAYING LAYING OF CHB LAYING OF DECORATIVE BLOCKS (8"x8") LAYING OF SOLID BRICKS (2"x8") LAYING OF ADOBE (3"x6") LAYING OF ASSORTED SIZE ADOBE (BIG) PLASTERING PLASTERING CEMENT FINISHING FINISHING OF ROUGH FLOORING FINISHING OF CHB JOINTS IV STEEL REBARS WORKS CUTTING, FABRICATION & INSTALLATION OF REBARS V TINSMITRY (ROOFING) INSTALLATION OF G.I. ROOFING: SIZE: 6' - 8' 9' - 12' INSTALLATION OF LONGSPAN ROOFING FABRICATION & INSTALLATION OF GUTTER (STD. SIZE) FABRICATION & INSTALLATION OF DOWNSPOUT (STD. SIZE) FABRICATION & INSTALLATION OF FLASHING & RIDGE ROLL FABRICATION & INSTALLATION OF ROOF FRAMING (STRUCTURAL STEEL) VI DOOR & WINDOW WORKS INSTALLATION OF DOOR & WINDOW JAMBS INSTALLATION & FABRICATION OF DOORS: TYPE: FLUSH OR PANEL TYPE SLIDING DOOR TYPE INSTALLATION OF STEEL AWNING WINDOWS INSTALLATION OF STEEL CASEMENT WINDOWS INSTALLATION OF ALUMINUM SLIDING WINDOWS INSTALLATION OF JALOUSIE WINDOWS ON ALUM. FRAME INSTALLATION OF DOOR LOCKS, ETC. VII FINISHING WORKS TILLING & WAINSCOATING CERAMIC TILES ASSORTED SIZES VINYL TILES ASSORTED SIZES TEXTURE FINISH ANAY FINISH SANDBLASTING PEBBLE WASHOUT MARBLE FINISH GRANOLITHIC FINISH CRAZY-CUT FINISH SOLID MARBLE SANDING W/ POLISHING VIII PAINTING WORKS LATEX & ENAMEL PAINTING VARNISHING PAINTING TEXTURED FINISH PAINTING IX PLUMBING WORKS INSTALLATION OF WATER CLOSET INSTALLATION OF LAVATORY INSTALLATION OF KITCHEN SINK
NO. OF LABOR
1 mason 1 mason 1 1 1 1 1 mason mason mason mason mason
CAPABILITIES day/unit
1.0675 per cu.m. 4.0000 per cu.m. 0.0250 0.0400 1.0000 0.6667 0.6667 per pcs. per pcs. per sq.m. per sq.m. per sq.m.
1 steelman
per pcs. per pcs. per sq.m. per linear mtr. per linear mtr. per linear mtr. per pcs.
0.3333 per unit 0.9688 0.6819 0.6619 0.5294 0.3437 0.1437 0.3333 per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per sq.m.
0.1667 per sq.m. 0.1429 per sq.m. 0.0400 per sq.m. 0.0333 per sq.m. 0.0444 per sq.m. 0.5000 0.6667 0.1333 0.0667 per sq.m. per sq.m. per sq.m. per sq.m.
TYPE OF WORK
INSTALLATION OF PVC SEWER PIPES INSTALLATION OF PVC WATER PIPES INSTALLATION OF WATER FIXTURES X ELECTRICAL WORKS INSTALLATION OF ELECTRICAL WIRES INSTALLATION OF ELECTRICAL FIXTURES
NO. OF LABOR
1 plumber 1 plumber 1 plumber
CAPABILITIES day/unit
0.1500 per pcs. 0.1313 per pcs. 0.2000 per set
1 electrician 1 electrician
2.6667 per cu.m. 4.0000 per cu.m. 8.0000 per cu.m. 1.3333 0.5333 0.5333 1.0000 1.3333 per cu.m. per cu.m. per cu.m. per cu.m. per cu.m.
2.5000 2.8070 3.0189 3.3333 2.4768 0.6002 0.8000 4.9536 0.0246 0.1600 0.0320 0.1600 0.2000 1.1429 0.3077 0.2963 0.5714 1.8824 0.2667 0.2000 1.1478 2.1505 0.0291 0.0213 0.0229 0.0700
per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per bd.ft. per bd.ft. per bd.ft. per bd.ft. per bd.ft. per pcs. per bd.ft. per bd.ft. per sq.m. per sq.m. per bd.ft. per bd.ft. per sq.m. per sq.m. per bd.ft. per bd.ft. per bd.ft. per sq.m.
0.1250 per linear mtr. 0.0700 per linear mtr. 0.3550 per linear mtr.
CAPABILITIES hour/unit
8.5400 per cu.m. 32.0000 per cu.m. 0.2000 0.3200 8.0000 5.3333 5.3333 per pcs. per pcs. per sq.m. per sq.m. per sq.m.
per pcs. per pcs. per sq.m. per linear mtr. per linear mtr. per linear mtr. per pcs.
2.6667 per unit 7.7500 5.4550 5.2950 4.2350 2.7500 1.1500 2.6667 per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per sq.m. per sq.m.
1.3333 per sq.m. 1.1429 per sq.m. 0.3200 per sq.m. 0.2667 per sq.m. 0.3556 per sq.m. 4.0000 5.3333 1.0667 0.5333 per sq.m. per sq.m. per sq.m. per sq.m.
CAPABILITIES hour/unit
1.2000 per pcs. 1.0500 per pcs. 1.6000 per set