Maharashtra State Electricity Transmission

Company Ltd.

State Load Dispatch Center,


Airoli
Daily system Report
for
26/Jun/2013

0 of 7

State Load Dispatch Center,Airoli (MSETCL)


Daily system Report for 26/Jun/2013 WEDNESDAY
GENERATION (MUs)
II
EXCHANGES (MUs)

I
A) MSGENCO

Daily

Monthly

1) Thermal
2) Hydro
3) Gas
Total MSGENCO
B) 1) JSW JAIGAD
2) WPCL
3) ADANI
4) Other CPP / IPP
5) Wind Generation
6) PENCH (MS)
C) TPCL & REL

65.975
6.354
10.638
82.967
15.587
7.049
25.120
5.188
28.439
0.324

1) TPCL Thermal
2) TPCL Hydro
TOTAL TPCL
3) REL Thermal

21.864
5.384
27.248
11.346

E) Central Sector

2200.262
177.243
249.520
2627.025
597.482
204.383
576.280
254.738
509.924
5.920

Daily

1) Gujrat
2) Madhya Pradesh
3) Chattisgarh
4) Maharashtra
5) Goa
6) TAPS 1&2 Injection
7) RGPPL Injection
8) Pench (Excess)

# Total Cent. Sector


F) Other Exchanges
1) With TPCL (Excess)
577.106 G) Bilateral Power *
129.204 1) MSEDCL Bilateral
Include PX
706.310
2)
MUMBAI
Bilateral
295.244
Include PX
3) MUMBAI Schedule

D) STATE
1) Thermal

(A1+C1+C3)

2) Hydro
3) Gas
4) Wind
5) CPP

(A2+B5+C2)
(A3)
(B4)
(B1+B2+B3)

TOTAL STATE

99.185
12.062
10.638
28.439
52.944
203.268

3072.612
312.367
249.520
509.924
1081.723
5226.146

Monthly

7.909
16.975
9.740
61.814
-5.141
3.686
6.000
-0.324

186.538
455.439
243.390
1594.784
-141.816
93.311
85.793
-5.920

100.659

2511.519

-17.167

-438.515

35.563
-2.266
15.473
3.884
15.473

919.486
-32.999
380.594
33.855
381.444

248.166

6848.756

36.778

943.319

18.981

496.655

303.925

8288.730

H) ENERGY CATERED (MUs)


1) MSEDCL
2) TPCL
3) REL
TOTAL STATE

DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW)


PARTICULARS
MSGENCO Thermal
MSGENCO Hydro
MSGENCO Gas
MSGENCO Total Generation
Central Sector Receipt
WIND
CPP / IPP
Exchange with Mumbai
MSEDCL DEMAND MET
Load Shedding
MSEDCL DEMAND
TPCL GENERATION
R-INFRA GENERATION
TPCL+R-INFRA DEMAND
STATE DEMAND MET
STATE DEMAND
Frequency (Hz)

A. Morning Peak at 11
Hrs
2738
319
427
3484
4755
1401
2387
-1116
10911
137
11048
1240
525
2881
13792
13929
50.07

B. Evening Peak at 20
Hrs
2817
693
432
3942
4737
1149
2125
-639
11338
160
11498
1473
525
2637
13975
14135
49.97

C. Night Minimum at 3
Hrs
2802
46
438
3286
3365
1041
2016
-348
9360
67
9427
842
400
1590
10950
11017
50.04

FREQUENCY PARTICULARS
MAXIMUM FREQ.

MINIMUM FREQ.

50.41 Hz at 16.02 Hrs 49.58 Hz at 19.47 Hrs

AVERAGE FREQ.

FREQ. BELOW 49.2 Hz

50.04

0 % of Time(min)

* Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.

Shift Engineer

Shift Incharge
1 of 7

State Load Dispatch Center,Airoli (MSETCL)


Daily and Progressive Generation,Maximum,Minimum,OLC Details for 26/Jun/2013
Generating
unit

Generation
Daily
(Mus)

Monthly Max
(Mus) (MW)

Min
(MW)

OLC
(MW)

Koradi

Generating
unit
Total

Unit 5
Unit 6
Unit 7

0.00
1.85
1.82

17.31
59.03
59.24

Total

3.67

135.58

Unit 2
Unit 3
Unit 4
Unit 5

3.10
3.17
4.08
4.72

34.09
69.74
71.13
90.30

Total

15.07

265.26

Unit 3
Unit 4
Unit 5
Unit 6
Unit 7

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Total

0.00

0.00

Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7

1.39
1.38
1.74
0.00
5.48
2.28
5.46

83.10
86.13
95.12
48.49
168.62
189.46
191.66

Total

17.72

862.59

Unit 3
Unit 4

3.87
4.25

125.35
117.58

Total

8.12

242.93

Unit 1
Unit 2
Unit 3
Unit 4
Unit 5

1.86
1.70
2.60
0.00
2.78

67.54
85.27
96.68
1.62
141.67

Total

8.94

392.78

Unit 3
Unit 4
Unit 5

4.19
4.11
4.16

106.67
98.98
95.48

Total

12.46

301.13

0
102
120

0
36
30

0
60
130
190

Bhusawal

140
145
200
285

110
120
145
110

130
140
151
421

Parli

0
0
0
0
0

0
0
0
0
0

81
70
122
0
305
170
254

47
50
39
0
180
0
193

90
90
70
0
250
150
230
880

Paras

144
160

30
40
88
0
82

104.62

KDPH
VTRNA
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR

0.00
0.00
0.24
0.00
0.48
0.00
0.00
0.00
0.15
1.51

1.63
14.99
4.98
0.00
9.60
2.82
3.34
0.00
4.39
30.88

Total

2.37

72.62

1.17
1.98
0.27
0.74
8.31
0.62
0.09
0.26
3.06
7.85
1.11
0.65
1.18
1.14

20.30
38.16
5.20
13.96
150.94
12.49
2.59
6.18
72.12
118.13
16.37
11.50
24.32
17.67

28.44

509.92

MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale

400

JSW_JAIGAD
WARDHA
Adani
Other_CPPs

15.59
7.05
25.12
5.19

597.48
204.38
576.28
254.74

Total

52.94

1632.88

0.00
8.71
3.58
2.94
1.63
5.00
5.38

0.00
209.28
113.64
74.92
41.73
137.54
129.20

27.25

706.31

1&2

11.35

295.24

Total

11.35

295.24

120
120
130
0
150
520

165
161
161

3.98

195
185
195
575

All Units

10.64

249.52

10.64

249.52

540

414

420
420

PENCH (MS)

Pench (MS)

0.32

5.92

Total

0.32

5.92

26

1.95
0.60
1.43

53.82
22.17
28.64

Koyna 12&4 Total

2.55

75.98

250
248
160

40
0
0

1090
0
0
60
0
81
0
0
0
7
250

0
0
0
0
0
0
0
0
6
0

0
0
60
80

23
163

773
321
1180

503
259
840

784
320
1234
2338

Tata

Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro

0
498
149
124
69
252
387

0
315
148
121
67
176
0

0
500
500
120
60
250
447
1877

REL

526

400

500
500

Cent_Sect

Koyna

Stage 1-2
Stage 4
Stage 3

OLC
(MW)

CPP

Total

Uran

Total

Min
(MW)

Hydro

Total

Nasik

190
182
190

Monthly Max
(Mus) (MW)

200
200

Khaparkheda

125
95
138
0
162

Daily
(Mus)

Wind

Chandrapur

174
192

Generation

Share

4672

Total

4672

600
250
240
850

Thermal
Thml+Gas
Hydro
Total
State Total
MS
PG
CL

65.98
76.61
6.35
82.97
203.27

2200.26
2449.78
177.24
2627.02
5226.15

2986
3406
1253
4659
14046

2 of 7

State Load Dispatch Center,Airoli (MSETCL)


Hourly Load Data As on 26/Jun/2013

TIME MSPGCL GEN.


Mum. MSEDCL LOAD
CPP /
CS
CS Mum.S
SR.
TOTAL WIND
NET DEMAND SHEDDI
IPP SHARE RECPT CH.
NO. THM HY GAS
EXCH.
MET
NG

MSEDCL
DEMAND
WITH LS

TPCL + R
STATE FREQ.
-INFRA
DEMAND (Hz)
DEMAND

1 2835

46

435

3316

1294

2346

3396

3383

-531

-588

9770

91

9861

1837

11698

50.07

2 2856

46

438

3340

1226

2144

3017

3184

-450

-424

9473

65

9538

1670

11208

50.18

3 2802

46

438

3286

1041

2016

2609

3365

-400

-348

9360

67

9427

1590

11017

50.04

4 2801

51

436

3288

945

2062

2579

3415

-400

-306

9404

67

9471

1550

11021

50.10

5 2769

51

430

3250

1015

2053

2815

3521

-400

-311

9538

67

9605

1552

11157

50.04

6 2834

51

435

3320

1064

2139

3078

3957

-448

-418

10082

107

10189

1660

11849

50.05

7 2802

46

437

3285

948

2275

3200

4336

-464

-546

10322

169

10491

1789

12280

50.16

8 2829

131

433

3393

1156

2338

3250

4443

-485

-683

10673

263

10936

1953

12889

50.07

9 2730

262

434

3426

1141

2352

4312

4354

-597

-788

10495

281

10776

2273

13049

50.03

10 2727

305

424

3456

1320

2407

4583

4630

-852

-964

10849

176

11025

2636

13661

50.14

11 2738

319

427

3484

1401

2387

4640

4755

-1013

-1116

10911

137

11048

2881

13929

50.07

12 2711

320

427

3458

1337

2392

4688

4398

-1060

-1118

10467

202

10669

2914

13583

49.96

13 2646

185

425

3256

1278

2395

4575

4416

-934

-1087

10269

312

10581

2895

13476

49.98

14 2693

68

414

3175

1211

2290

4486

4262

-845

-1031

9918

244

10162

2778

12940

49.94

15 2713

51

417

3181

1434

2261

4459

4281

-813

-1053

10130

232

10362

2793

13155

49.99

16 2667

123

417

3207

1558

2096

4445

4615

-795

-1090

10398

164

10562

2773

13335

50.07

17 2649

414

414

3477

1283

2092

4092

4526

-681

-1116

10262

165

10427

2768

13195

50.08

18 2699

612

436

3747

1256

2109

3637

4107

-625

-976

10253

173

10426

2742

13168

50.12

19 2745

704

437

3886

1156

2108

3690

4275

-588

-740

10708

139

10847

2645

13492

50.09

20 2817

693

432

3942

1149

2125

4328

4737

-627

-639

11338

160

11498

2637

14135

49.97

21 2813

788

458

4059

1074

2142

4409

4661

-676

-554

11405

162

11567

2555

14122

49.99

22 2811

636

514

3961

988

2130

4372

4459

-622

-455

11109

145

11254

2435

13689

49.94

23 2676

214

540

3430

1086

2139

4257

4443

-613

-409

10715

107

10822

2290

13112

50.00

24 2612

192

540

3344

1078

2146

4122

4134

-555

-407

10315

90

10405

2145

12550

49.99

6.35 10.64

82.97

28.44 52.94

93.04 100.66 -15.47 -17.17

248.16

3.78

251.95

55.76

307.71

50.04

MUs 65.98

NOTE : ALL VALUES IN MW


Mumbai Sch./Net Exch is shown with reference to MSETCL System. (+) indicates Mum. to MSETCL and (-) indicates
MSETCL to Mum. Mumbai Schedule is calculated for MSETCL periphery (taking 4% loss for import & 4.85% MSETCL loss

# Without Applying Load Diversity Factor

3 of 7

State Load Dispatch Center,Airoli (MSETCL)


Details of Generating Unit Outages/Trippings for 26/Jun/2013
Position as on 6.30 Hrs of 27/Jun/2013
Name of Generating
Unit

Capacity

Tripped
Date

Trippe
Sync.Date
d Time

Sync.
Time

Expected
Date

Parli Unit 4

210

28/11/2012

02.37

Continued. water shortage.

Cent_Sect Tarapur 2

160

31/12/2012

17.05

Continued. Refuelling work

250

25/01/2013

19.49

Continued.

Parli Unit 3

210

13/02/2013

23.50

Continued. Water Shortage

Parli Unit 5

210

14/02/2013

22.45

Continued. Water Shortage

Parli Unit 7

250

17/02/2013

01.00

Continued. Water Shortage.

Khaparkheda Unit 4

210

01/06/2013

12.31

Continued. Annual Overhaul

Chandrapur Unit 4

210

15/06/2013

13.33

Continued. Annual Overhaul

250

17/06/2013

08.40

Continued.

230

03/01/2013

13.29

Continued. Gas shortage.

300

19/03/2013

15.50

Continued.

CPP Adani U-2

660

22/04/2013

13.47

Continued. ID fan problem.

Dabhol 1A

230

23/05/2013

12.58

Continued. Gas Shortage

Dabhol 3B

230

28/05/2013

21.58

Continued. Gas shortage.

Dabhol 1X

290

28/05/2013

22.02

Continued. Gas shortage.

Dabhol 1B

230

28/05/2013

22.02

Continued. Gas shortage.

Koyna Unit 11

80

04/06/2013

13.25

Continued. Rotar Fault.

Dabhol 2A

230

06/06/2013

09.10

Continued. Gas Shortage

Dabhol 2X

290

06/06/2013

09.12

Continued. Gas Shortage

Koradi Unit 5

200

10/06/2013

02.52

Continued. Furnace Pressure High

CPP WPCL U-4

135

12/06/2013

03.27

Continued. Turbine Balancing.

CPP VIPL

300

20/06/2013

03.30

Continued. CHP Problem.

Uran Unit 8

108

21/06/2013

10.15

Continued. Gas Shortage.

CPP INDIABULLS

270

23/06/2013

05.23

Continued. Oil shortage

Chandrapur Unit 6

500

26/06/2013

16.37

Continued. Boiler Tube Leakage.

CPP JSW (J) U1

300

26/06/2013

16.48

Continued. Condensar Tube Leakage.

Reason of Outage

PLANNED OUTAGE

Parli Unit 6

Koyna ST - IV 4

Water Shortage/AOH from


06.03.2013

26/06/2013

Spherecial valve servomotor


oil and water leakages.

FORCED OUTAGE
Dabhol 2B
CPP VIPL

Withdrawn Due to Water


Shortage, No PPA.

4 of 7

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 26/Jun/2013
Position as on 6.30 Hrs of 27/Jun/2013

Name of Line

Tripped
Date

Tripped Synchronise Synchronise


Time
d Date
d Time

Reason of Outage

InterState
Voltage Level :

400KV

Padgha-Bhoisor (PGCIL)
Voltage Level :

Outage Type
26/06/2013

08.22

26/06/2013

400KV

20.49

PLANNED OUTAGE

Work @ Boiser End.

Outage Type

HAND TRIPPED

Parli (PGCIL)-Bhadravati-II 02/06/2013

19.24

Continued.

Over Voltage

Kolhapur - Mapusa - I

06/06/2013

16.44

Continued.

Over Voltage

Chandrapur-Bhadravti - I

09/06/2013

16.16

Continued.

Over Voltage

Kolhapur-Solapur (PG) II

13/06/2013

17.07

Continued.

Over Voltage.

Seoni-Wardha-II 765KV.

14/06/2013

10.54

Continued.

Over Voltage

Dabhol - NewKoyna - II

22/06/2013

11.54

Continued.

To attend Breaker Timing problem

Parli (PGCIL)-Bhadravati-II 23/06/2013

16.17

Continued.

Over Voltage

Dhule-Sar'Sarovar - I

24/06/2013

22.06

26/06/2013

06.37

Over Voltage.

Akola - Aurangabad - I

26/06/2013

01.05

26/06/2013

06.27

Over Voltage.

Akola - Wardha - I

26/06/2013

01.19

26/06/2013

06.10

Over Voltage.

Solapur-Solapur(PGCIL)

26/06/2013

18.01

27/06/2013

06.01

Over Voltage.

Akola - Aurangabad - I

26/06/2013

22.20

27/06/2013

05.50

Over Voltage.

Dhule-Sar'Sarovar - II
26/06/2013
Parli-Solapur (PGCIL)
27/06/2013
Ckt.II
Voltage Level :
400KV

23.49

Continued.

Over Voltage.

01.40

Continued.

Over Voltage.

Koradi-Satpur

14/06/2013

02.02

Continued.

Over Voltage.

Parli - Solapur (PGCIL) - I

24/06/2013

18.03

Continued.

Over Voltage.

Lamboti - Solapur (PGCIL) 26/06/2013

00.16

26/06/2013

06.30

Over Voltage.

Akola - Wardha - I

27/06/2013

03.15

27/06/2013

05.29

Over Voltage.

Karad - Solapur (PGCIL)

27/06/2013

03.59

27/06/2013

07.11

Over Voltage.

Outage Type

TRIPPED

IntraState
Voltage Level :

400KV

400/220 KV 500 MVA ICT07/06/2013


I @ Deepnagar
400/220KV 315MVA ICTIII at Karad.
Auxilary Bus - I @
Chandrapur
400/220 KV 315 MVA ICTI @ Dhule
400/220KV 315MVA ICTIII at Karad.
Kalwa - Lonikand

17.03

Outage Type PLANNED OUTAGE


ICT charged through Tie Bay due to
Continued. higher Tan Delta Values of HV side R
Phase Bus-II CT
Maint. Work.( @ 21.05 Hrs,HV Side
Continued.
Kept on Humming).
Replacement of Damaged R,Y,B Ph P
14.25
G Isolator Hanger in TBC-I Bay.
To Attend Oil Leakage from
20.38
Conservator Tank.

24/06/2013

13.35

26/06/2013

08.57

26/06/2013

26/06/2013

11.05

26/06/2013

26/06/2013

11.09

26/06/2013

27/06/2013

07.01

Continued.

Voltage Level :
220KV
Main CB of 220/100kV 200
22/05/2013
MVA ICTIII @ Padgha
KDPH-Wankuswadi
24/06/2013

10.46
07.59

Outage Type PLANNED OUTAGE


Repl.of A bus,B bus isolator under
Continued.
JICA scheme.ICT on TBC.
Continued. Replacement of Bus Side Isolator.

Main Bus @ KDPH

24/06/2013

08.00

Continued.

Main Bus @ Jeur

26/06/2013

10.10

26/06/2013

14.30

Q.M.Work.

Mudshing - Talandage - II

26/06/2013

10.16

26/06/2013

13.43

Wadkhal - Ndil - 2

26/06/2013

10.25

26/06/2013

16.50

Q.M.Work & Red Hot Attending Work.


Pilot Wire Protection Rectification
Work.

18.24

Differential Relay Repl.Work.


Relay Testing, LILO @ Talegaon(PG).

Replacement of Bus Side Isolator.

5 of 7

State Load Dispatch Center,Airoli (MSETCL)


Details of Line outages/Trippings for 26/Jun/2013
Position as on 6.30 Hrs of 27/Jun/2013

Name of Line

Vita - Lamboti

Tripped
Date

Tripped Synchronise Synchronise


Time
d Date
d Time

Reason of Outage

Repl.of B Ph.Suspension Clamp @


Loc.297 & Fixing of Armour Rod on Y
Ph. Conduct. @ 298.
Outage Type PLANNED OUTAGE

26/06/2013

15.24

26/06/2013

20.35

Vasai - Padgha

20/06/2013

09.05

26/06/2013

19.23

Raising the height of tower.

Kolshet-Vasai

20/06/2013

09.33

26/06/2013

20.14

Raising the height of tower.

Voltage Level :

100KV

Voltage Level :
400KV
400/220 KV 100 MVA
12/07/2012
Spare Unit @ Koradi
400/220 KV 105 MVA
Spare ICT Unit @
02/02/2013
Bhusawal - II
Dabhol - Nagothane - I
06/06/2013

Outage Type

HAND TRIPPED

07.11

Continued.

Main Buchholz prot.operated

10.17

Continued.

Low Oil Pressure Alarm Received.

21.21

Continued.

Over Voltage

Bhusawal- Aurangabad

07/06/2013

14.34

Continued.

Over Voltage

Deepnagar-Aurangabad-II

16/06/2013

10.46

Continued.

Over Voltage

Khadka - Deepnagar - II

22/06/2013

09.46

Continued.

Over Voltage

Karad - Newkoyna - I

23/06/2013

16.36

Continued.

Over Voltage

Chandrapur - Parli - III

24/06/2013

21.56

Continued.

Over Voltage.

Karad - Kolhapur - I

25/06/2013

21.57

Continued.

Over Voltage.

Lonikand- Koyna Stage IV

26/06/2013

00.37

07.32

Over Voltage.

Voltage Level :

26/06/2013

220KV

Chikhali - Jalna - II

27/05/2013

17.23

Hinjewadi-II - Infosys

15/06/2013

16.02

Voltage Level :
400KV
400/11.5KV 90 MVA STN
25/09/2012
T/F III @ 400KV C'PUR
Karad - Kolhapur - II
21/06/2013

15.38
21.23

Outage Type HAND TRIPPED


To avoid over loading by taking line in
Continued.
grid.
New D/C line with Bays and 1 number
Continued.
T/F Bay at Infosys
Outage Type TRIPPED
Differential protection operated
Continued.
Declared Faulty by Genco.
Continued. Over Voltage.

Koradi - II - Indiabull

25/06/2013

00.49

Continued.

Over Voltage.

Akola - Bhusawal
Akola - Indiabull
(Nandgaonpeth)
Karad-Jaigad I
Akola - Indiabull
(Nandgaonpeth)
Voltage Level :
220KV
220/100 KV,200MVA ICT I at Padgha
220/132 KV 100 MVA ICT
- I at Balapur
Vita - Lamboti

26/06/2013

01.05

26/06/2013

05.55

Over Voltage.

26/06/2013

01.05

26/06/2013

05.17

Over Voltage.

27/06/2013

00.01

Continued.

Over Voltage.

27/06/2013

02.59

06.24

Over Voltage.

BBLSR-Chalisgaon
220/100KV 50 MVA T/FIII @ K'gaon
220/100KV,100 MVA T/F
4At K'gaon
Voltage Level :
132KV
132/11KV 16 MVA T/F @
Deepnagar

27/06/2013

Outage Type

TRIPPED

07/06/2013

17.48

Continued.

Diff.Protection

14/06/2013

06.28

Continued.

DC Earth Leakage.

26/06/2013

05.10

26/06/2013

05.30

Distance Protection.

26/06/2013

06.16

26/06/2013

09.58

27/06/2013

04.15

27/06/2013

27/06/2013

04.15

27/06/2013

04/06/2013

01.34

Breakar Problem.
L V Backup Protection Operated,Earth
06.15
Fault.
L V Backup Protection Operated,Earth
05.10
Fault.
Outage Type TRIPPED
Continued.

Bursting of H V Y Ph. Bushing.

6 of 7

State Load Dispatch Center,Airoli (MSETCL)


Details of On Line Capacity for 27/Jun/2013
Generating unit
Koradi
Unit 5
Unit 6
Unit 7
Bhusawal
Unit 2
Unit 3
Unit 4
Unit 5
Parli
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Chandrapur
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Paras
Unit 3
Unit 4
Khaparkheda
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Nasik
Unit 3
Unit 4
Unit 5
Uran
All Units
PENCH (MS)
Pench (MS)
Koyna
Stage 1-2
Stage 4
Stage 3
Hydro
KDPH
VTRNA

Derated Capacity
(MW)

OLC (MW)

Generating unit

200
210
210
620

0
100
70
170

210
210
500
500
1420

130
140
215
0
485

210
210
210
250
250
1130

0
0
0
0
0
0

210
210
210
210
500
500
500
2340

100
100
120
0
225
0
200
745

250
250
500

170
190
360

TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR
Wind
MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale
CPP
JSW_JAIGAD
WARDHA
Adani
Other_CPPs

210
210
210
210
500
1340

90
90
130
0
140
450

Tata
Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro

210
210
210
630

195
180
195
570

REL
1&2

852
852

420
420

Cent_Sect
Share

Derated Capacity
(MW)

OLC (MW)

60
21
80
20
45
23
12
250
611

60
0
80
0
0
0
0
0
140

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1200
405
1320
300
3225

510
340
1234

150
500
500
120
60
250
444
2024

0
500
500
120
60
250
447
1877

500
500

500
500

3455
3455

4334
4334

2084

53
53
600
1000
320
1920

600
250
240
1090

40
60

0
0
20620

7 of 7

13225