A) MSGENCO
Daily
1) Thermal
2) Hydro
3) Gas
Total MSGENCO
B) 1) JSW JAIGAD
2) WPCL
3) ADANI
4) Other CPP / IPP
5) Wind Generation
6) PENCH (MS)
C) TPCL & REL
1) TPCL Thermal
2) TPCL Hydro
TOTAL TPCL
3) REL Thermal
Monthly
84.953
8.208
9.744
102.905
20.417
7.701
22.430
5.235
16.661
0.123
23.615
4.786
28.401
11.797
E) Central Sector
487.307
37.518
59.115
583.940
108.627
47.843
140.850
42.230
152.104
1.557
Daily
1) Gujrat
2) Madhya Pradesh
3) Chattisgarh
4) Maharashtra
5) Goa
6) TAPS 1&2 Injection
7) RGPPL Injection
8) Pench (Excess)
D) STATE
1) Thermal
(A1+C1+C3)
2) Hydro
3) Gas
4) Wind
5) CPP
(A2+B5+C2)
(A3)
(B4)
(B1+B2+B3)
TOTAL STATE
120.365
13.117
9.744
16.661
55.783
215.670
697.394
69.127
59.115
152.104
221.130
1198.870
Monthly
12.672
17.619
7.280
58.201
-4.705
3.684
7.215
-0.123
69.308
106.963
41.050
342.022
-29.010
22.197
39.723
-1.557
101.843
590.696
-14.817
-103.890
43.120
-3.510
13.669
3.493
13.669
225.220
-10.628
83.461
12.891
83.461
262.498
1563.957
35.858
225.469
19.159
118.556
317.515
1907.982
A. Morning Peak at 11
Hrs
3563
720
307
4590
4530
484
2567
-731
11440
439
11879
1492
526
2749
14189
14628
50.00
B. Evening Peak at 20
Hrs
3567
946
441
4954
4493
853
2099
-782
11640
153
11793
1309
459
2550
14190
14343
50.00
C. Night Minimum at 4
Hrs
3527
92
394
4013
3986
565
2176
-456
10284
66
10350
840
399
1695
11979
12045
50.07
FREQUENCY PARTICULARS
MAXIMUM FREQ.
MINIMUM FREQ.
AVERAGE FREQ.
50.04
0 % of Time(min)
* Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.
Shift Engineer
Shift Incharge
1 of 7
Generation
Daily
(Mus)
Monthly Max
(Mus) (MW)
Min
(MW)
OLC
(MW)
Koradi
Generating
unit
Total
Unit 5
Unit 6
Unit 7
2.71
2.56
0.00
8.36
18.16
0.00
Total
5.27
26.52
Unit 2
Unit 3
Unit 4
Unit 5
3.22
3.53
6.12
0.00
20.66
20.56
29.48
12.40
Total
12.88
83.10
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
0.00
0.00
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
3.51
3.60
1.85
0.00
5.15
4.70
5.56
20.39
21.06
10.65
0.00
30.24
26.24
33.62
Total
24.37
142.20
Unit 3
Unit 4
3.90
4.69
23.89
25.96
Total
8.58
49.85
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
2.75
3.50
3.79
3.83
7.38
14.58
12.33
16.68
24.16
42.58
Total
21.26
110.32
Unit 3
Unit 4
Unit 5
4.16
4.22
4.22
25.18
25.01
25.13
Total
12.60
75.32
157
135
0
50
65
0
125
120
0
245
Bhusawal
160
160
325
0
120
125
140
0
160
150
323
0
633
Parli
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Chandrapur
155
155
163
0
240
215
252
136
134
0
0
190
160
186
150
150
0
0
225
210
230
965
Paras
180
223
147
169
100
105
133
142
260
5.87
24.13
KDPH
VTRNA
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR
0.00
0.18
0.26
0.08
0.46
0.00
0.10
0.00
0.41
0.84
0.00
0.74
1.14
0.12
2.84
0.06
0.70
0.00
1.79
5.98
Total
2.34
13.38
0.78
1.43
0.17
0.43
5.72
0.32
0.08
0.16
2.26
3.20
0.59
0.36
0.74
0.41
7.14
11.49
2.60
4.02
40.05
4.12
2.13
1.91
19.81
36.65
6.16
3.63
6.73
5.67
16.66
152.10
MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale
20.42
7.70
22.43
5.24
108.63
47.84
140.85
42.23
Total
55.78
339.55
0.00
9.94
3.56
2.95
1.63
5.54
4.79
0.00
59.02
21.52
17.54
9.72
32.77
30.05
28.40
170.62
1&2
11.80
69.52
Total
11.80
69.52
195
180
195
570
All Units
9.74
59.12
Total
9.74
59.12
447
305
350
350
PENCH (MS)
Pench (MS)
0.12
1.56
Total
0.12
1.56
27
0
0
Koyna
Stage 1-2
Stage 4
Stage 3
2.09
2.05
1.73
11.71
4.07
8.36
4.14
15.78
315
347
240
40
0
0
1010
0
61
59
4
82
0
30
0
18
125
0
0
0
3
0
0
0
0
17
0
0
17
60
3
80
0
0
0
0
0
160
CPP
880
333
1200
787
251
550
868
325
1234
2427
Tata
Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro
Total
Uran
OLC
(MW)
Wind
JSW_JAIGAD
WARDHA
Adani
Other_CPPs
160
150
170
170
300
Min
(MW)
Hydro
400
950
165
169
171
Monthly Max
(Mus) (MW)
Total
Nasik
185
184
191
Daily
(Mus)
200
200
Khaparkheda
140
175
171
181
380
Generation
0
502
149
124
69
253
423
0
312
148
122
67
186
0
0
500
500
120
60
250
447
1877
REL
526
394
500
500
Cent_Sect
Share
4541
Total
4541
520
250
240
770
Thermal
Thml+Gas
Hydro
Total
State Total
MS
PG
CL
84.95
94.70
8.21
102.90
215.67
487.31
546.42
37.52
583.94
1198.87
3763
4113
1170
5283
14628
2 of 7
MSEDCL
DEMAND
WITH LS
TPCL + R
STATE FREQ.
-INFRA
DEMAND (Hz)
DEMAND
1 3556
72
311
3939
759
2149
4180
4067
-564
-505
10409
84
10493
2064
12557
50.00
2 3475
92
394
3961
714
2160
3971
4123
-458
-462
10496
65
10561
1881
12442
50.14
3 3505
62
394
3961
614
2160
3843
3978
-419
-470
10243
66
10309
1766
12075
50.01
4 3527
92
394
4013
565
2176
3847
3986
-419
-456
10284
66
10350
1695
12045
50.07
5 3494
92
392
3978
498
2185
3850
4263
-419
-445
10479
81
10560
1679
12239
50.06
6 3525
348
393
4266
426
2207
4257
4609
-419
-390
11118
162
11280
1763
13043
49.99
7 3583
463
396
4442
383
2393
4259
4100
-420
-406
10912
339
11251
1835
13086
50.08
8 3654
107
383
4144
350
2574
4120
3996
-425
-418
10646
429
11075
1948
13023
49.99
9 3574
188
381
4143
426
2566
4181
4302
-485
-464
10973
361
11334
2216
13550
49.89
10 3571
663
386
4620
537
2609
4249
4366
-554
-585
11547
378
11925
2563
14488
49.90
11 3563
720
307
4590
484
2567
4410
4530
-719
-731
11440
439
11879
2749
14628
50.00
12 3501
872
305
4678
471
2574
4312
4164
-812
-774
11113
587
11700
2783
14483
49.98
13 3504
401
441
4346
618
2633
4310
4233
-790
-772
11058
682
11740
2754
14494
50.09
14 3536
165
443
4144
756
2555
4232
4193
-679
-712
10936
400
11336
2605
13941
50.08
15 3471
150
435
4056
939
2532
4346
4098
-633
-644
10981
288
11269
2595
13864
49.94
16 3563
140
443
4146
1126
2517
4339
3928
-598
-720
10997
159
11156
2602
13758
50.06
17 3511
96
442
4049
1304
2433
4270
4059
-533
-977
10868
127
10995
2566
13561
50.07
18 3556
65
440
4061
1199
2203
3995
3926
-523
-918
10471
127
10598
2529
13127
50.17
19 3564
129
445
4138
935
2363
4161
4206
-554
-949
10693
117
10810
2514
13324
50.19
20 3567
946
441
4954
853
2099
4402
4493
-604
-782
11640
153
11793
2550
14343
50.00
21 3541
856
444
4841
787
2007
4455
4435
-657
-605
11492
197
11689
2514
14203
50.01
22 3606
545
442
4593
668
2044
4476
4597
-673
-500
11429
123
11552
2393
13945
50.11
23 3505
529
445
4479
647
2071
4269
4630
-676
-618
11235
76
11311
2297
13608
50.02
24 3501
415
447
4363
602
2006
4231
4561
-639
-514
11038
71
11109
2154
13263
50.06
MUs 84.95
8.21
9.74 102.90
262.50
5.58
268.08
55.02
323.09
50.04
16.66 55.78
3 of 7
Capacity
Tripped
Date
Trippe
Sync.Date
d Time
Sync.
Time
Expected
Date
Parli Unit 4
210
28/11/2012
02.37
Cent_Sect Tarapur 2
160
31/12/2012
17.05
250
25/01/2013
19.49
Continued.
Parli Unit 3
210
13/02/2013
23.50
Parli Unit 5
210
14/02/2013
22.45
Parli Unit 7
250
17/02/2013
01.00
Chandrapur Unit 4
210
15/06/2013
13.33
Nasik Unit 4
210
07/07/2013
02.00
Continued. C.O.H.
Dabhol 3B
230
28/05/2013
21.58
Dabhol 1B
230
28/05/2013
22.02
Koyna Unit 11
80
04/06/2013
13.25
Dabhol 3A
230
06/06/2013
08.28
Dabhol 3X
290
06/06/2013
08.28
Dabhol 2A
230
06/06/2013
09.10
135
12/06/2013
03.27
Dabhol 1X
290
27/06/2013
21.46
Dabhol 1A
230
27/06/2013
21.47
210
30/06/2013
09.42
Continued.
Uran Unit 7
108
30/06/2013
12.42
CPP INDIABULLS
270
03/07/2013
04.04
06/07/2013
16.42
Flame Failure.
Chandrapur Unit 3
210
03/07/2013
10.50
06/07/2013
06.53
CPP VIPL
300
03/07/2013
12.29
Bhusawal Unit 5
500
03/07/2013
23.40
CPP Adani U1
660
04/07/2013
20.11
Uran Unit 5
108
05/07/2013
00.30
300
05/07/2013
22.00
Hydro GhatgharU2
125
06/07/2013
14.00
07/07/2013
03.25
660
06/07/2013
19.23
07/07/2013
09.58
Khaparkheda Unit 1
210
07/07/2013
07.41
07/07/2013
11.21
Khaparkheda Unit 3
210
07/07/2013
10.11
Reason of Outage
PLANNED OUTAGE
Parli Unit 6
FORCED OUTAGE
Koradi Unit 7
07/07/2013
01.08
Turbine Trip.
Continued. C.T.L.
4 of 7
Name of Line
Tripped
Date
Reason of Outage
InterState
Voltage Level :
400KV
Parli-Solapur (PGCIL)
07/07/2013
Ckt.II
Voltage Level :
400KV
15.48
Chandrapur-Bhadravti - I
09/06/2013
16.16
Continued.
Over Voltage
Wardha - Seoni - I
01/07/2013
08.35
Continued.
Over Voltage
17.10
06/07/2013
06.02
Over Voltage.
14.52
06/07/2013
09.16
Over Voltage.
18.26
06/07/2013
07.23
Over Voltage.
Kolhapur-Solapur (PG) II
06/07/2013
17.08
Continued.
Over Voltage.
Warora - Tiroda - II
06/07/2013
19.25
07/07/2013
10.58
20.06
07/07/2013
05.57
Over Voltage.
Voltage Level :
Outage Type
07/07/2013
19.28
Hot Spot
Outage Type
400KV
Outage Type
HAND TRIPPED
TRIPPED
Koradi-Satpur
14/06/2013
02.02
Akola - Aurangabad- II
03/07/2013
14.51
Kolhapur - Mapusa - II
05/07/2013
17.10
Akola - Wardha - II
06/07/2013
01.54
06/07/2013
05.59
Over Voltage.
Bus Bar Protection
Operated.(Opportunity Outage)For
Jack bus conductor Repl.
Bus Bar Prot Operated.(Ready for
charging 17.46Hrs)
Over Voltage
Padgha -Tarapur - I
06/07/2013
22.06
06/07/2013
22.40
PLCC Problem.
23.45
Voltage Level :
Continued.
PLANNED OUTAGE
06/07/2013
Continued.
Continued.
220KV
Nasik-Navsari-I
06.38
Over Voltage.
Outage Type
07/07/2013
07.50
07/07/2013
08.14
TRIPPED
Distance Protection
IntraState
Voltage Level :
400KV
17.03
Padgha - Nagothane - I
11.58
06/07/2013
Voltage Level :
220KV
Main CB of 220/100kV 200
22/05/2013
MVA ICTIII @ Padgha
06/07/2013
10.46
Babaleshwar - Nagar - I
06/07/2013
08.34
06/07/2013
Babaleshwar - Nagar - II
06/07/2013
08.35
06/07/2013
Wadkhal - Ndil - 2
220/33 KV 100 MVA ICTII @ Versova
Voltage Level :
400KV
400/220 KV 100 MVA
Spare Unit @ Koradi
Dabhol - Nagothane - I
06/07/2013
09.42
06/07/2013
07/07/2013
02.56
07/07/2013
Maint.work.
Outage Type
12/07/2012
07.11
06/06/2013
21.21
Karad - Newkoyna - I
23/06/2013
Continued.
06/07/2013
HAND TRIPPED
14.46
Over Voltage
16.36
Continued.
Over Voltage
30/06/2013
10.42
Continued.
Over Voltage.
02/07/2013
21.23
09.41
Over Voltage.
06/07/2013
5 of 7
Name of Line
Tripped
Date
Reason of Outage
Deepnagar-Aurangabad-I
04/07/2013
18.51
Continued.
Over Voltage.
Karad - Kolhapur - I
05/07/2013
17.10
Continued.
Over Voltage.
06/07/2013
00.15
06/07/2013
07.16
Over Voltage.
Bhusawal- Aurangabad
06/07/2013
11.48
07/07/2013
10.57
Over Voltage.
Karad - Kolhapur - II
06/07/2013
17.06
Continued.
Over Voltage.
Bhusawal- Aurangabad
07/07/2013
21.18
Continued.
Over Voltage
Voltage Level :
400KV
400/11.5KV 90 MVA STN
25/09/2012
T/F III @ 400KV C'PUR
Akola - Indiabull
04/07/2013
(Nandgaonpeth)
Akola - Bhusawal
05/07/2013
15.38
13.06
06/07/2013
09.17
Over Voltage.
02.21
06/07/2013
05.49
Over Voltage.
07/07/2013
05.49
06/07/2013
02.25
C'pur-Parli II
06/07/2013
05.40
Voltage Level :
220KV
220/100 KV,200MVA ICT 07/06/2013
I at Padgha
Karad Mudsingi-II
06/07/2013
Dist Prot.
Distance Protection(Ready for
Continued.
charging 18.18Hrs)
Outage Type TRIPPED
17.48
Continued.
A'nagar-Pal
06/07/2013
04.32
Koradi-Butibori
06/07/2013
14.25
06/07/2013
15.18
06/07/2013
14.25
06/07/2013
14.46
06/07/2013
14.25
06/07/2013
14.46
06/07/2013
14.25
06/07/2013
15.32
06/07/2013
14.25
06/07/2013
15.05
06/07/2013
14.25
06/07/2013
15.30
06/07/2013
14.25
06/07/2013
15.19
06/07/2013
14.25
06/07/2013
15.42
06/07/2013
14.25
06/07/2013
20.43
06/07/2013
14.25
06/07/2013
15.18
06/07/2013
14.25
06/07/2013
15.49
Butibori-Indorama
06/07/2013
14.25
06/07/2013
15.37
Butibori-Abhijeet ckt.
06/07/2013
14.25
06/07/2013
14.46
06/07/2013
16.00
06/07/2013
16.29
01.45
06/07/2013
08.04
Continued.
Diff.Protection
Dist Prot.
Wave trap burst.
Voltage Level :
132KV
Kurunda-Akhada Balapur
06/07/2013
Ckt.
Nanded - Tamsa
06/07/2013
Outage Type
TRIPPED
02.15
06/07/2013
02.25
Dist Prot.
04.43
06/07/2013
04.57
Dist Prot.
Tekepar-Kardha
07/07/2013
10.55
07/07/2013
11.53
Bhandara-Tekepar
07/07/2013
10.55
07/07/2013
11.52
6 of 7
Derated Capacity
(MW)
OLC (MW)
Generating unit
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR
200
210
210
620
140
120
0
260
210
210
500
500
1420
140
150
215
0
505
210
210
210
250
250
1130
0
0
0
0
0
0
210
210
210
210
500
500
500
2340
160
150
180
0
250
225
250
1215
250
250
500
170
200
370
210
210
210
210
500
1340
130
160
150
170
275
885
Tata
Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro
210
210
210
630
195
0
195
390
REL
1&2
852
852
430
430
53
53
0
0
600
1000
320
1920
600
250
240
1090
40
60
0
61
Wind
MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale
CPP
JSW_JAIGAD
WARDHA
Adani
Other_CPPs
Cent_Sect
Share
Derated Capacity
(MW)
OLC (MW)
60
21
80
20
45
23
12
250
611
60
3
80
0
0
0
0
0
204
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1200
405
1320
300
3225
868
325
570
240
2003
150
500
500
120
60
250
444
2024
0
500
500
120
60
250
447
1877
500
500
500
500
3455
3455
4420
4420
20620
7 of 7