A) MSGENCO
Daily
Monthly
1) Thermal
2) Hydro
3) Gas
Total MSGENCO
B) 1) JSW JAIGAD
2) WPCL
3) ADANI
4) Other CPP / IPP
5) Wind Generation
6) PENCH (MS)
C) TPCL & REL
58.097
15.542
10.815
84.454
26.009
7.390
27.700
3.987
32.381
0.504
1) TPCL Thermal
2) TPCL Hydro
TOTAL TPCL
3) REL Thermal
18.422
7.561
25.983
10.857
E) Central Sector
1858.491
280.109
256.746
2395.346
571.976
188.205
610.680
191.816
698.768
8.515
Daily
1) Gujrat
2) Madhya Pradesh
3) Chattisgarh
4) Maharashtra
5) Goa
6) TAPS 1&2 Injection
7) RGPPL Injection
8) Pench (Excess)
D) STATE
1) Thermal
(A1+C1+C3)
2) Hydro
3) Gas
4) Wind
5) CPP
(A2+B5+C2)
(A3)
(B4)
(B1+B2+B3)
TOTAL STATE
87.376
23.607
10.815
32.381
65.086
219.265
2689.207
432.984
256.746
698.768
979.697
5057.402
Monthly
4.819
14.617
5.530
44.947
-4.169
5.654
0.000
-0.504
279.441
425.944
172.030
1343.997
-116.063
92.535
93.175
-8.515
70.894
2282.544
-17.533
-427.019
-4.190
-14.963
16.071
2.242
16.071
647.796
-109.477
353.146
51.739
353.146
235.786
6520.831
35.896
921.781
18.474
480.267
290.156
7922.879
A. Morning Peak at 9
Hrs
2517
963
451
3931
2886
1443
2858
-598
10543
50
10593
1163
524
2285
12828
12878
49.99
B. Evening Peak at 20
Hrs
2382
1015
448
3845
3808
1212
2789
-709
10972
53
11025
1348
522
2579
13551
13604
50.03
C. Night Minimum at 2
Hrs
2593
335
440
3368
2265
1262
2710
-428
9204
50
9254
810
392
1630
10834
10884
50.24
FREQUENCY PARTICULARS
MAXIMUM FREQ.
MINIMUM FREQ.
AVERAGE FREQ.
50.09
0 % of Time(min)
* Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.
Shift Engineer
Shift Incharge
1 of 7
Generation
Daily
(Mus)
Monthly Max
(Mus) (MW)
Min
(MW)
OLC
(MW)
Koradi
Generating
unit
Total
Unit 5
Unit 6
Unit 7
2.98
3.20
3.69
60.92
61.53
50.29
Total
9.87
172.74
Unit 2
Unit 3
Unit 4
Unit 5
0.00
3.15
4.22
0.00
75.80
69.62
136.68
12.40
Total
7.37
294.50
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
0.00
0.00
0.00
0.00
2.61
0.00
0.00
0.00
0.00
31.89
Total
2.61
31.89
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
1.09
1.62
0.69
0.00
0.00
0.00
0.00
76.64
67.14
58.84
0.00
67.99
91.97
101.99
Total
3.40
464.56
Unit 3
Unit 4
3.85
2.42
97.85
105.26
Total
6.27
203.11
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
2.92
3.02
3.66
3.50
7.26
55.92
73.81
80.36
98.65
155.87
Total
20.36
464.60
Unit 3
Unit 4
Unit 5
4.12
0.00
4.10
107.65
25.26
94.18
Total
8.23
227.09
131
150
180
110
85
100
KDPH
VTRNA
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR
0.86
1.18
1.41
0.20
0.24
0.43
1.10
0.00
1.34
0.53
8.97
3.93
8.26
2.21
12.60
3.12
7.98
0.00
17.50
22.58
Total
7.28
87.15
MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale
1.48
1.77
0.37
0.86
10.13
0.88
0.17
0.45
4.06
7.00
1.18
0.51
2.02
1.48
32.26
50.29
10.13
18.99
201.42
18.94
6.23
7.78
83.08
165.50
26.16
15.58
32.24
30.17
160
85
Total
32.38
698.77
245
JSW_JAIGAD
WARDHA
Adani
Other_CPPs
26.01
7.39
27.70
3.99
571.98
188.20
610.68
191.82
Total
65.09
1562.68
0.00
8.43
0.00
2.96
1.64
5.39
7.56
0.00
229.89
67.70
76.59
42.29
132.37
144.36
25.98
693.20
1&2
10.86
281.87
Total
10.86
281.87
0
125
215
340
Parli
0
0
0
0
203
0
0
0
0
0
0
0
0
0
250
250
Chandrapur
108
82
71
0
0
0
0
0
49
0
0
0
0
0
80
60
40
0
0
0
0
180
Paras
195
213
134
59
Khaparkheda
155
165
159
156
375
65
85
143
132
230
160
160
180
180
300
980
Nasik
195
0
175
165
0
163
190
0
180
370
All Units
10.82
256.75
10.82
256.75
461
437
460
460
PENCH (MS)
Pench (MS)
0.50
8.52
Total
0.50
8.52
27
10
3.32
2.96
1.98
77.48
58.57
56.91
6.28
136.05
435
472
240
40
0
0
OLC
(MW)
1090
36
61
60
9
41
18
47
0
56
125
35
0
56
8
0
18
45
0
55
0
36
60
60
5
80
18
30
0
18
0
307
Wind
CPP
1155
332
1230
1013
240
850
1058
330
1234
2622
Tata
Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro
0
486
0
124
69
254
459
0
316
0
122
68
188
72
0
500
0
120
60
250
447
1377
REL
526
390
500
500
Cent_Sect
Koyna
Stage 1-2
Stage 4
Stage 3
Min
(MW)
Hydro
Total
Uran
Total
Monthly Max
(Mus) (MW)
192.96
445
0
110
135
0
Daily
(Mus)
8.26
130
145
170
Bhusawal
0
150
230
0
Generation
Share
3180
Total
3180
600
250
240
850
Thermal
Thml+Gas
Hydro
Total
State Total
MS
PG
CL
58.10
68.91
15.54
84.45
219.26
1858.49
2115.24
280.11
2395.35
5057.40
2810
3270
1397
4667
12346
2 of 7
MSEDCL
DEMAND
WITH LS
TPCL + R
STATE FREQ.
-INFRA
DEMAND (Hz)
DEMAND
1 2564
405
437
3406
1297
2850
2119
2530
-493
-592
9518
77
9595
1755
11350
50.13
2 2593
335
440
3368
1262
2710
1964
2265
-429
-428
9204
50
9254
1630
10884
50.24
3 2582
265
448
3295
1445
2445
1932
2599
-397
-352
9442
50
9492
1551
11043
50.19
4 2570
345
448
3363
1479
2378
1918
2578
-380
-323
9485
50
9535
1523
11058
50.14
5 2572
299
452
3323
1354
2378
1958
2660
-417
-380
9345
50
9395
1543
10938
50.25
6 2630
922
456
4008
1263
2390
2154
2909
-570
-431
10166
51
10217
1647
11864
50.12
7 2589 1167
461
4217
1508
2694
2106
3013
-584
-489
10969
51
11020
1791
12811
50.26
8 2511
730
460
3701
1384
2837
2245
3356
-585
-568
10736
51
10787
1970
12757
50.17
9 2517
963
451
3931
1443
2858
2269
2886
-585
-598
10543
50
10593
2285
12878
49.99
10 2453
906
454
3813
1437
2860
3009
2905
-744
-852
10173
50
10223
2613
12836
49.98
11 2438
547
455
3440
1400
2889
3350
3081
-929
-1017
9813
50
9863
2804
12667
50.09
12 2346
390
457
3193
1352
2781
3173
3138
-1008
-1094
9390
50
9440
2871
12311
50.06
13 2267
360
455
3082
1303
2654
2924
3014
-1000
-1045
9018
102
9120
2823
11943
50.05
14 2266
322
451
3039
1386
2706
2761
2814
-863
-911
9050
52
9102
2684
11786
50.12
15 2147
320
449
2916
1475
2785
2752
2812
-845
-1052
8959
52
9011
2698
11709
50.08
16 2220
518
450
3188
1289
2798
2670
2698
-841
-1103
8890
52
8942
2686
11628
49.96
17 2185
607
450
3242
1355
2780
2654
2879
-831
-1072
9211
52
9263
2672
11935
50.08
18 2209
710
451
3370
1300
2776
2808
2981
-754
-1053
9400
53
9453
2628
12081
50.00
19 2356
602
454
3412
1197
2766
3164
3375
-723
-938
9839
53
9892
2587
12479
50.02
20 2382 1015
448
3845
1212
2789
3200
3808
-741
-709
10972
53
11025
2579
13604
50.03
21 2410 1265
448
4123
1308
2786
3111
3323
-647
-589
10978
52
11030
2504
13534
50.01
22 2386 1251
445
4082
1292
2734
2837
3107
-568
-565
10676
52
10728
2343
13071
50.06
23 2429
920
447
3796
1306
2720
2837
3071
-568
-655
10261
52
10313
2193
12506
50.03
24 2475
378
448
3301
1334
2722
3098
3092
-568
-717
9748
52
9800
1993
11793
50.15
84.45
32.38 65.09
235.79
1.31
237.09
54.37
291.47
50.09
3 of 7
Capacity
Tripped
Date
Trippe
Sync.Date
d Time
Sync.
Time
210
28/11/2012
02.37
250
25/01/2013
19.49
Continued.
Parli Unit 3
210
13/02/2013
23.50
Parli Unit 5
210
14/02/2013
22.45
Cent_Sect NTPC(V-10)
500
06/06/2013
00.01
Continued. A/OH.
Chandrapur Unit 4
210
15/06/2013
13.33
Nasik Unit 4
210
07/07/2013
02.00
Continued. C.O.H.
Chandrapur Unit 5
500
14/07/2013
00.01
Dabhol 3B
230
28/05/2013
21.58
Dabhol 1B
230
28/05/2013
22.02
Koyna Unit 11
80
04/06/2013
13.25
Dabhol 3A
230
06/06/2013
08.28
Dabhol 3X
290
06/06/2013
08.28
Dabhol 2A
230
06/06/2013
09.10
Dabhol 1X
290
27/06/2013
21.46
Dabhol 1A
230
27/06/2013
21.47
Bhusawal Unit 5
500
03/07/2013
23.40
Dabhol 2X
290
15/07/2013
15.09
Dabhol 2B
230
15/07/2013
15.10
660
15/07/2013
22.24
CPP VIPL
300
17/07/2013
12.03
Continued. Turbine.
Chandrapur Unit 6
500
19/07/2013
14.49
Chandrapur Unit 7
500
19/07/2013
15.49
135
19/07/2013
16.17
Tata Trombay 6
500
19/07/2013
23.54
Uran Unit 8
108
22/07/2013
06.47
CPP INDIABULLS
270
22/07/2013
10:35
Bhusawal Unit 2
210
25/07/2013
10.47
Chandrapur Unit 1
210
26/07/2013
07.03
26/07/2013
17.14
Chandrapur Unit 3
210
26/07/2013
09.10
26/07/2013
17.07
L.P.T Problem.
250
26/07/2013
13.41
26/07/2013
23.02
300
27/07/2013
05.00
Expected
Date
Reason of Outage
PLANNED OUTAGE
Parli Unit 4
Parli Unit 6
FORCED OUTAGE
Parli Unit 7
CPP JSW (J) U2
Continued. C.T.L.
4 of 7
Name of Line
Tripped
Date
Reason of Outage
InterState
Voltage Level :
400KV
Outage Type
HAND TRIPPED
21.02
Continued.
Over Voltage.
04.35
Continued.
Over Voltage
22/07/2013
13:11
09.28
Over Voltage.
Dabhol - NewKoyna - II
23/07/2013
12.35
Continued.
Over Voltage.
Dhule-Sar'Sarovar - I
24/07/2013
17.17
Continued.
Over Voltage.
25/07/2013
21.46
Continued.
Over Voltage
26/07/2013
17.13
Continued.
Over Voltage.
Voltage Level :
26/07/2013
400KV
Koradi-Satpur
14/06/2013
02.02
Kolhapur - Mapusa - II
Chandrapur - Bhadravati IV
Chandrapur-Bhadravati II
13/07/2013
03.30
19/07/2013
15.56
Continued.
Over Voltage.
26/07/2013
00.03
Continued.
Over Voltage.
Akola-Aurangabad--II
27/07/2013
Kolhapur-Solapur(PGCIL)27/07/2013
I
02.02
27/07/2013
04.22
Over Voltage.
02.02
27/07/2013
06.35
Over Voltage.
IntraState
Voltage Level :
400KV
17.03
Dabhol-Nagothane - II
12.08
09/07/2013
26/07/2013
Voltage Level :
220KV
Main CB of 220/100kV 200
22/05/2013
MVA ICTIII @ Padgha
220/132 KV 200 MVA ICT
26/07/2013
- II @ Malegaon
10.10
26/07/2013
16.32
10.48
26/07/2013
15.41
Q.M.Work
10.56
15.55
Continued.
26/07/2013
10.46
10.02
18.28
Opp.outage.RFC 18.17Hrs.
26/07/2013
13.03
Q.M.Work
Nasik-Padgha- II
26/07/2013
10.06
26/07/2013
10.55
26/07/2013
12.57
Apta - Taloja
26/07/2013
220/100KV 200MVA ICT-II
26/07/2013
at Kalwa
Pophali-New Koyna
26/07/2013
11.30
26/07/2013
15.52
Hot Spot.
14.45
26/07/2013
15.45
16.43
26/07/2013
18.15
Voltage Level :
132KV
Ahmadnagar - Pathardi
Voltage Level :
18/07/2013
08.49
12/07/2012
07.11
Continued.
400KV
Continued.
Name of Line
Tripped
Date
Reason of Outage
23/06/2013
16.36
Continued.
Over Voltage
Karad - Kolhapur - II
400/220KV 315MVA ICTIII at Karad.
Bhusawal- Aurangabad
11/07/2013
21.40
Continued.
Over Voltage.
20/07/2013
17.05
Continued.
23/07/2013
10.42
Continued.
Over Voltage.
Deepnagar-Aurangabad-I
23/07/2013
14.46
Continued.
Over Voltage.
Karad - Kolhapur - I
24/07/2013
13.05
Continued.
Over Voltage.
25/07/2013
22.59
08.14
Over Voltage.
Voltage Level :
26/07/2013
220KV
Chikhali - Jalna - II
24/07/2013
19.26
20.50
Continued.
26/07/2013
26/07/2013
00.41
Voltage Level :
400KV
400/11.5KV 90 MVA STN
25/09/2012
T/F III @ 400KV C'PUR
Koradi-Khaparkheda-I
15/07/2013
15.38
Continued.
02.31
Continued.
Over Voltage
19/07/2013
16.57
Continued.
Over Voltage.
22/07/2013
23:00
Continued.
Over Voltage.
26/07/2013
01.18
07.42
Over Voltage
Akola - Bhusawal
27/07/2013
02.02
Continued.
Over Voltage.
Karad-Jaigad I
27/07/2013
04.58
Continued.
Over Voltage.
Voltage Level :
220KV
220/100 KV,200MVA ICT 07/06/2013
I at Padgha
26/07/2013
Outage Type
17.48
Continued.
Continued.
Butibori-Abhijeet ckt.
19/07/2013
19.29
Boiser-Versova
25/07/2013
16.51
26/07/2013
11.17
Murud-Tuljapur
26/07/2013
16.32
26/07/2013
23.42
Voltage Level :
132KV
Ambazari - Hingna - I
26/07/2013
14.52
14.52
26/07/2013
07.42
26/07/2013
Voltage Level :
Kalwa - Kalyan
100KV
26/07/2013
TRIPPED
Diff.Protection
Rain Water Entered in SwitchYard &
C/R.
Distance Protection Due to B Ph.
Conductor Snapped @ Loc.-3 Boiser
End.
Dist Prot.
Dist Prot.
6 of 7
Derated Capacity
(MW)
OLC (MW)
200
210
210
620
115
130
130
375
210
210
500
500
1420
0
125
215
210
210
210
250
250
1130
0
0
0
0
230
230
210
210
210
210
500
500
500
2340
90
90
100
0
0
0
0
280
250
250
500
180
210
390
340
Generating unit
TILLARI
BHTGR/VEER
BHIRA T.R.
RNGR+BHTSA
BHANDARDRA
ELDARY
SMLHY_PTN
GHATGHAR
Wind
MalharPeth
Vankuswadi
ATIT
Kale
Satara
Shirala
K Mahankal
Supa
Vita
Dondaicha
Sakri
Nandurbar
Khandke
Khaparale
CPP
JSW_JAIGAD
WARDHA
Adani
Other_CPPs
210
210
210
210
500
1340
125
130
180
150
300
885
Tata
Trombay 4
Trombay 5
Trombay 6
Trombay 7A
Trombay 7B
Trombay 8
TATA Hydro
210
210
210
630
200
0
200
400
REL
1&2
852
852
450
450
Cent_Sect
Share
Derated Capacity
(MW)
OLC (MW)
60
21
80
20
45
23
12
250
611
60
8
41
18
25
0
23
0
272
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1200
405
1320
300
3225
784
330
1234
150
500
500
120
60
250
444
2024
0
500
0
120
60
250
447
1377
500
500
500
500
3455
3455
3828
3828
2348
53
53
600
1000
320
1920
600
250
240
1090
40
60
36
61
20620