WATER TANK CALCULATION (For Batching Plant 4 EX-CHINA)

25000 Ltr. Water Supply For Mixer Cap. 0.8 m3 Water needed 0.08 m
3

1 Hour needed 4.8 m /s


3

1 Day work needed 48 m /day 48000 ltr/day


3

(10 hr/day)

Water tank design & calculation Capacity Water tank empty Design: Shape Dimension (inlet) 25000 ltr/day
3 25 m 5.208333 hour

(1 day used)

Rectangular Panjang 6 Lebar 2 Tinggi 2.7 Tebal 0.006

m m m m

(plate 6mm)

Volume (tank)

V = panjang X tinggi X lebar V= 32.4 m3 32400 ltr 32400 kg

Water Volume mass


Density

= = =

25000 ltr 25000 kg


water 1000 kg/m3

Tank Plate : SS41,


Density

y =
steel

2400 kgf/cm
=

,tebal =
kg/m3

6 mm

7850

plate 1

6012 x 2712 x 6 (mm) vol = 0.097 m


3

= 4 pcs

= 3045,8 = 2 pcs
3

0.097 x 7850 x 4 pcs plate 2 2012 x 2712 x 6 (mm) vol =

kg

0.032 m

= 502.4 kg

0.032 x 7850 x 2 pcs

plate mass total = Siku : siku 90,

3548.2 kg tebal = berat = = 5.9 x 9.59 = = 1.9 x 9.59 = 7 mm 9.59 kg/m 56.5 kg x (2 pcs) = 18.221 kg x (14 pcs) = Total = 113 kg 255.09 kg 368.09 kg

Samping atas bawah

Mass totally :

water + plat + siku = 25000 3548.2 368.09 = 28916.29 kg 28.91629 TON

Pengecekan terhadap tekanan hidrostatik Full tank capacity Load tank capacity spare 32400 25000 7400 7.4 V Panjang Lebar Tinggi air 7.4 6 2 ? m3 m m m ltr ltr ltr m3

t spare= 7.4/(6 x2 ) = 0.616667 m tinggi = 2.7 - 0.616667 = 2.0833 m 2083 mm

Water tank load capacity

=> h air =

2083 P= = g= h=

mm ? 1000 9.81 2.083 N kg/m3 m/s m


2

P= XgXh P=
2 20434.23 N/m 2 20.43423 kN/m 2 20434.23 N/m

P=

2 = 0.020434 N/mm

Hydrostatic Pressure

Tegangan geser yang diizinkan : SS41, y = = = From calculation : 0.020434 N/mm


2

2400 kgf/cm 24000 N/cm


2

,tebal =

6 mm

240 N/mm

P = 0.020434 N/mm

<

240

N/mm

SAFE

PT POSO ENERGY
Head office: Jl. Amil No. 7, Warung Buncit, Jakarta Selatan 12740, Indonesia. Phone: (62 21) 799 0218 Branch Office: Jl. Pulau Seram No. 464, Poso, Sulawesi Tengah, Indonesia. Phone: (62 452) 23548

POSO HYDROPOWER PLANT (3 X 65 MW) WATER TANK BACTHING PLANT (EX-CHINA) CALCULATION

REVISION 0 APRIL, 2009

PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION Jl. Raya Bekasi-Cibinong Km. 19,5 Cileungsi, Bogor, Indonesia Phone: (62 21) 8232323, Fax: (62 21) 8232626

a.

5 MW)

UTAMA

PT POSO ENERGY
Head Office:Jl. Amil No. 7, Warung Buncit, Jakarta Selatan 12740, Indonesia. Phone: (62 21) 799 0218 Branch Office: Jl. Pulau Seram No. 464, Poso, Sulawesi Tengah, Indonesia. Phone: (62 452) 23548
PROJECT NAME LOCATION DOC. NO. AREA TITLE POSO HYDROPOWER PLANT (3 x 65 MW) SULEWANA, POSO-SULAWESI TENGAH LH22-M34-D01-303 GENERAL FACILITIES WATER TANK BATCHING PLANT EX CHINA CALCULATION

REV.

DATE

DESIGNED

REVIEWED REVISION

APPROVED

DESCRIPTION

PT BUKAKA TEKNIK UTAMA


Jl. Raya Bekasi-Cibinong Km. 19,5 Cileungsi, Bogor, Indonesia. Phone: (62 21) 8232323, Fax: (62 21) 8232626
APPROVED ALI M TOHA Sign

REVIEWED DESIGNED

MA'RIFAT KEMAL BASKORO

Sign Sign

40, Indonesia.

h, Indonesia.

REVISION NO.

R0

DESCRIPTION

KNIK UTAMA
Sign Date

eungsi, Bogor, Indonesia.

8232626

Sign Sign

Date Date

You might also like