COST BREAK DOWN

PROJECT NAME. : REMOVE&INSTALLATION BLOWER 2 SETS CLIENT : VNT PLC., LOCATION : VNT RAYONG THAILAND A - Construction Cost Item
1 2 3 4 5 6 Revision 0 Date: 25/03/2012

Description REMOVE BLOWER ( 2 SETS) INSTALLATION & SETUP NEW BLOWER(2 SETS) MODIFY STAINLESS PIPE CONNECTION TRANSPORT & LIFTING EQUIP. SCAFFOLDING WORK SAFETY COST

Q'ty

1 1 1 1 1 1

Unit LOT LOT LOT LOT LOT TRIP

Unit P 125,000 150,000 8,500 40,500 12,000 5,500

Amount 125,000 150,000 8,500 40,500 12,000 5,500

SUB TOTAL COST Sub Total Cost OPT Vat Total Cost ( Baht ) 20% 7%

341,500 341,500 68,300 28,686 438,486

SCOPE OF WORK -REMOVE OLD BLOWER AND REINSTALL NEW ONCE -ALL LABOUR /TOOL/EQUIPMENT/CONSUMABLE COST BY. CCK