TABLE OF CONTENTS
1. PURPOSE.........................................................................................................................................2
2. SCOPE...............................................................................................................................................2
3. REFERENCE...................................................................................................................................2
4. LOCATION&WORKING AREA................................................................................................... 2
5. EQUIPMENT AND HAND TOOLS............................................................................................... 2
6. STEP OF WORK............................................................................................................................. 3
7. TEST REPORT................................................................................................................................ 4
APPENDIX 1.................................................................................................................................... 5
DCAP Method Statement for Seismic Integrity Pile Test
Electric Chiller 8,000 RT Project
Ref. Code: DPC12-TI-C-TM-0008 REV: 01 Eff Date: 13 March 2023 Page 2 of 11
1 . PURPOSE
The low strain integrity tests program is proposed to perform on pile to determine the
integrity of individual pile by measuring and analyzing the velocity response of the
pile induced by a handheld hammer applied axially to the pile head.
2. SCOPE
The scope of this document is pile test method follow Volume II 13.3.3 as below :
- Pile integrity test on all bore pile as per ASTM D-5882 (see Appendix1)
3. REFERENCE
ASTM D-5882 : Standard Test Method for Low Strain Impact Integrity Testing of
Deep Foundation
DPC12-D-C-PLA-3000 : Piling Layout Plan of Overall PTC Chiller Plant
DPC12-D-C-PLA-3001 : Piling Layout Plan of Overall DPP Power Plant
4. LOCATION&WORKING AREA
The location and working area as below :
o Impact Hammer
o Velocity Measurement.
o Recording Apparatus
DCAP Method Statement for Seismic Integrity Pile Test
Electric Chiller 8,000 RT Project
Ref. Code: DPC12-TI-C-TM-0008 REV: 01 Eff Date: 13 March 2023 Page 3 of 11
Figure 1.
6. STEP OF WORK
Prepare the pile head surface to be smooth with sufficient space for both attachments
of the motion sensing device and hammer impact area.The pile head will be free from
will be free from water, dirt or other debris.
Step 2-1 Prepare the pile head surface to be smooth with sufficient space for both
attachments of the motion sensing device and hammer impact area.The
pile head will be free from water, dirt or other debris.
Step 2-2 Attach the motion sensor firmly with the bonding material at selected
location away from the edge of the pile head.
Step 2-3 Position of the handheld hammer at a distance no larger than 300 mm
from the accelerometer.
Step 2-5 Apply several impacts and record for confirmation of data quality
Figure 2
7. TEST REPORT
The following items will be included in the pile load test report
Photos of PIT test
Apparatus of PIT test
Procedures of PIT test
Integrity Results of PIT test
The English language will be used on all submitted report
Test reports will include calibration certificate of testing equipment.
DCAP Method Statement for Seismic Integrity Pile Test
Electric Chiller 8,000 RT Project
Ref. Code: DPC12-TI-C-TM-0008 REV: 01 Eff Date: 13 March 2023 Page 5 of 11
APPENDIX 1
DCAP Method Statement for Seismic Integrity Pile Test
Electric Chiller 8,000 RT Project
Ref. Code: DPC12-TI-C-TM-0008 REV: 01 Eff Date: 13 March 2023 Page 6 of 11
DCAP Method Statement for Seismic Integrity Pile Test
Electric Chiller 8,000 RT Project
Ref. Code: DPC12-TI-C-TM-0008 REV: 01 Eff Date: 13 March 2023 Page 7 of 11
DCAP Method Statement for Seismic Integrity Pile Test
Electric Chiller 8,000 RT Project
Ref. Code: DPC12-TI-C-TM-0008 REV: 01 Eff Date: 13 March 2023 Page 8 of 11
DCAP Method Statement for Seismic Integrity Pile Test
Electric Chiller 8,000 RT Project
Ref. Code: DPC12-TI-C-TM-0008 REV: 01 Eff Date: 13 March 2023 Page 9 of 11
DCAP Method Statement for Seismic Integrity Pile Test
Electric Chiller 8,000 RT Project
Ref. Code: DPC12-TI-C-TM-0008 REV: 01 Eff Date: 13 March 2023 Page 10 of 11
DCAP Method Statement for Seismic Integrity Pile Test
Electric Chiller 8,000 RT Project
Ref. Code: DPC12-TI-C-TM-0008 REV: 01 Eff Date: 13 March 2023 Page 11 of 11