INCOMING
CLEANING
INSPECTION
REPLACE
REPAIR
FABRIKASI
CUSTOMER SUPPLIED
ASSEMBLY
PACKAGING
REPORT
SHIPPING
INCOMING INSPECTION
DISASSEMBLY CLEANING , CHEMICAL OR MECHANICAL DETAIL INSPECTION REPAIR/RECONDITION FABRIKASI REPLACEMENT PARTS ASSEMBLY AND BALANCING ROTOR ASSEMBLY PUMP PACKAGING AND SHIPPING PREPARE REPAIR REPORT
INCOMING INSPECTION
HAL-HAL YG PERLU DIPERHATIKAN PERHATIKAN PERINTAH KERJA CEK DATA PENGIRIMAN DAN FISIK BARANG PERIKSA KONDISI BARANG SECARA UMUM DAN QUANTITYNYA LAPORKAN KE BAGIAN MARKETING KALAU DITEMUKAN NON-CONFORMITY DOKUMENTASI/FOTO Note: DIPAKAI JUGA SBG REFERENSI PENGIRIMAN
DISASSEMBLY
MENGENAL EQUIPMENT/POMPA YG AKAN
DIOVERHAUL. PERHATIKAN PERINTAH KERJA/SRP SIAPKAN PERALATAN KERJA PERHATIKAN KONDISI YG ABNORMAL PERHATIKAN PERINGATAN SAFETY MARKING/TAG TAKE FOTO
CLEANING
CHEMICAL CLEANING
SOLVENT DEGREASER RUST/SCALE REMOVER PAINT REMOVER
MECHANICAL CLEANING
BLASTING , WET OR DRY ( MEDIA AL-OX , GLASS BEAD ) VIBRATORY CLEANING
DETAIL INSPECTION
JENIS-JENIS INSPECTION VISUAL
DIMENSIONAL FUNCTIONAL NDT ( utk pompa jarang diterapkan ) - FPI - MPI - UT
FABRIKASI
HAL-HAL YG PERLU DIPERHATIKAN GEOMETRI, bentuk dan ukuran MATERIAL SPECIFICATION, certificate required PROSES FABRIKASI
REPAIR/RECONDITION
MENGENAL PROSES REPAIR DASAR JOINING PROCES ( WELDING, BRAZING ) COATING PROCES (ELECTRO PLATING, METAL SPRAY ) MACHINING PROCES ( TURNING, MILLING, GRINDING , DRILLING ) HEAT TREATMENT ( HARDENING, ANEALING, TEMPERING , STRESS
RELIEVE )
FABRIKASI - REPAIR
BISA DILAKUKAN DI:
SHOP SENDIRI VENDOR
REPORTING
MINIMUM CONTEN AS RECEIVED INSPECTION DIMENSIONAL INSPECTION BALANCING REPORT MATERIAL CERTIFICATE , if requested
BALANCING ROTOR
MEMAHAMI PRINSIP DASAR BALANCING PROCES. MEMAHAMI REFERENSI, ISO-1940 dan API
Balancing : Proses mengurangi atau menambah masa utk mengurang masa yg tdk merata.
TEKNIS BALANCING ROTOR INDIVIDUAL, perlu mandrel PROGRESSIVE BALANCE ROTOR/FINAL BALANCE ( satu kali )
Mandrel shaft
PROGRESSIVE BALANCING
CONTOH ROTOR POMPA 4 STAGES
1 3
Shaft 2
Impeller
Final balancing
BERDASARKAN PENGALAMAN
UNTUK OVERHAUL POMPA DGN IMPELLER YG MASIH BAIK CUKUP DILAKUKAN FINAL BALANCING/SEKALI BALANCING ROROT SET.
TYPE OF UNBALANCE
Definisi Unbalance : Distribusi masa yg tdk merata terhadap sumbu rotasi rotor
STATIC UNBALANCE
Terjadi bila : Sumbu Inersia bergeser sejajar dengan sumbu shaft
Unbalance Unbalance
C.G
Shaft Axis
Type ini utamanya terjadi pada part bentuk disk yg tipis, misalnya : flywheel, turbine disk Can be corrected by single plane
Priciple Inertia Axis = Sumbu Inersia C.G = Center of Gravity
COUPLE UNBALANCE
Terjadi bila : Sumbu inersia berpotongan dgn sumbu shaft pada posisi C.G
C.G
Shaft Axis
Unbalance
DYNAMIC UNBALANACE
Terjadi bila : Sumbu inersia tidak sejajar maupun berpotongan dgn sumbu shaft ( kondisi paling sering terjadi )
Unbalance
C.G
Unbalance
INDIVIDUAL BALANCING
ROTOR BALANCING
25
ROTOR BALANCING
26