You are on page 1of 2

1.

HIGHLIGHTS OF POWER SECTOR


a Installed Generation Capacity (As on 29-02-12 )
All
Thermal
India
Coal
Gas
Diesel
MW
105437.38
18093.85
1199.75
%age
55.3
9.5
0.6
@ Based on data as on 30.06.2011.

Nuclear

38848.40
20.4

RES@
Grand Total
(MNRE)
22233.17 190592.55
11.7
100.0

Nuclear
3380
4.3

Total
78700
100.0

Thermal

Nuclear

Total

14636.0

1000.0

17716.0

12051.5
82.3

0.0
0.0

13332.5
75.3

Total
124730.98
65.4

Hydro
(Renewable)

4780.00
2.5

b Capacity Addition Target during 11th Plan


Hydro
15627
19.9

MW
%age
c

Thermal
59693
75.8

Generation Capacity Addition Target/Achievement (2011-12)


Hydro

Target
(MW)
2080.0
Achievement up to Feb.,12
(MW)
1281.0
%age
61.6

d Electricity Generation Target/achievement (2011-12)


Hydro
Target
MU
112050
Achievement up to Feb.,12
MU
122048.2
%age
108.92
e

Nuclear

Bhutan
(Imp)

Total

712234

25130

5586

855000

642275.07
90.18

29415.12
117.05

5211.06
93.29

798949.49
93.44

Status of CEA Concurrence to Hydro Schemes


Period

2007-08
2008-09
2009-10
2010-11
2011-12

Thermal

Project

Carry forward

report

from

received

Accepted
for concurrence

Concurrence

Prev. year

Under
Prelim.
Exam

13
8

19
22
20

10
20
21

Project reports

given

returned

by CEA

to Developer

3
1

4
4

10
5

2
3
2

9
7
12

3
7
6

6
20
6

All India Thermal PLF (%)


2003-04

2004-05

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

72.7
provisional*

74.8

73.6

76.8

78.6

77.2

77.48

75.07

2011-12 *
upto Feb. 12

ENERGY SAVED IS ENERGY PRODUCED

72.81

All India Annual per Capita consumption of Electricity


Year
Per Capita Consumption ( kWh)
(As per U. N. methodology)

2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
h

592.0
612.5
631.5
671.9
717.1
734.5
779* *provisional

All India Transformation, T&D and AT&C losses :


Year
T&D losses(DMLF CEA)
2003-04
32.53
2004-05
31.25
2005-06
30.42
2006-07
28.65
2007-08
27.20
2008-09
25.47
2009-10
NA

AT&C Losses(PFC)

34.78
34.33
33.02
30.62
29.45
27.74
27.15

a) All India Village Electrification (as on 31.01. 2012):


b) Pumpsets Energised (as on 31.01. 2012):

All India Coal Consumption for Power Generation (Utilities)


YEAR
Coal Cunsumption
( Million Tonnes )
2002-03
253
2003-04
263
2004-05
278
2005-06
280
2006-07
302
2007-08
330
2008-09
355

Average cost of power supply & average realization ( paise/kWh )


Year
cost of supply
realization(paise/unit)
(paise/unit)
Including
Only
Agriculture Agriculture
2003-04
239
203
72.39
2004-05
254
209
75.68
2005-06
260
221
76.36
2006-07
276
227
74.23
2007-08
293
239
77.27
2008-09
341
262
85.26
2009-10
354
268
89.05

552947
18066453

Source:- PFC Reports on the performance of State Power Utilities

Power supply Position 2011-12(FEBRUARY 12)*


Energy(MU) Deficit%
Peak
Deficit%
Region
Requirement
Demand(MW)
Northern
22,332
-7.7
36,684
-9.6
Western
24,426
-13.4
41,277
-13.9
Southern
22,363
-13.3
35,343
-15.2
Eastern
8,109
-6.8
13,563
-5.8
North Eastern
837
-11.2
1,813
-10.5
All India
78,067
-11.1
128,680
-12.1
* Provisional

ENERGY SAVED IS ENERGY PRODUCED

You might also like