Item
Name
Component
Qty. in M3/M2 / M
L
B/D
H/T
Total Qty.
Planned /
proposed
Executed
b)
c)
(ii) P.C.C .a)
b)
c)
(iii) Bar cutting /
Bending / fixing .
a)
b)
c)
(iv) Shuttering a)
b)
c)
(v) Dewatering / Plastering
Painting / Blasting /
a)
Other Miscellaneous Works b)
c)
Specification / Details .
No.
i)
ii)
iii)
iv)
v)
Supervisor/ Technician ------Mason / Mistry ---------------Skilled Labour ---------------Semi-skilled Labour --------Un-skilled ---------------------
Item
a) Cement (Bags No.) ---------b) Sand (Cum) .
c) Chips (Cum)
40 MM ----------------20 MM -----------------10 MM -----------------d) Steel (Size in MT)
i)
ii) ..
iii)
iv) ..
e) Const. Chemical / Other material
Signature of