Annexure -IV

Back to contents page

FORMAT OF JOINT MEASUREMENT CERTIFICATE

POWER GRID CORPORATION OF INDIA LTD.

JOINT MEASUREMENT CERTIFICATE(T/L. FOUNDATION)

Name of Group :
Name of Line :
LOA No. & Date :
Executing Agency :

JMC No. .................. Date: .....................


Loc No. .................. Type of tower .............
Drawing No. .................. Fndn. classification.......
Depth of water table ......
(1) Excavation Details
(a) Type of soil

+------------------------------------------+
¦ DESIGNATION¦ TYPE OF SOIL & DEPTH ¦
¦ OF PIT +-----------------------------¦
¦ ¦ DRY ¦ WET ¦ HARD ¦ FR ¦ HR ¦
+------------+-----¦-----¦-------¦----¦----¦
¦ PIT A ¦ ¦ ¦ ¦ ¦ ¦
¦ ¦ ¦ ¦ ¦ ¦ ¦
¦ PIT B ¦ ¦ ¦ ¦ ¦ ¦
¦ ¦ ¦ ¦ ¦ ¦ ¦
¦ PIT C ¦ ¦ ¦ ¦ ¦ ¦
¦ ¦ ¦ ¦ ¦ ¦ ¦
¦ PIT D ¦ ¦ ¦ ¦ ¦ ¦
+------------------------------------------+

b) AREA OF PIT : L= .... mt. B= ..... mt. AREA = ..... sq. m.


c) Vol. of Excavation = .......cu. m.

2) Checking of casting
a) Alignment of loc.
& template = .....
b) Diagonal = .....
c) Level = .....
d) Quality of
i) Metal = ....
ii) Sand = ....
iii) Cement = ....
iv) Reinforcement = ....
v) Water = ....

3) Concreting Details
a) Volume of concrete (1:2:4) = .......cu. m.
b) Volume of concrete (1:3:6) = .......cu. m.
c) Quant. of cement bags = .......Bags
d) Quant. of Reinforcement = .......MT
(Dia. wise)

4) Test cube prepared = ....

CERTIFICATE:

WORK IS EXECUTED AS PER SPECIFICATION.

FOR CONTRACTOR FOR POWERGRID

Signature ...... Signature ......

Name: ......... Name ...........

Design. ........ Design.(Jr.Engr./E1/E2/E3)

Date ........ Date ...........