You are on page 1of 2

ERECTOR NAME :..................................

PROJECT NO...........
Ref. No. INT/RP/01
RESOURCE PLAN Rev. No. 06
Dated:- 22/02/2018
Page :- 01 of 02
1. Resources Details:-
Name / Contact
Sr. No. Details of Equipment Capacity Qty
details of Suppliers
1 Pick & Carry Crane (Frana-F15)
2 Cranes
3 Cranes
4 Boom Lift (60 ft/ 80 ft)
5 Boom Lift (120 ft)
6 Trailers
7 List of Torque Wrench
8 Fixed Roof Access
9 MS Scaffolding
10 DFT Gauge

2. Organization chart including Manpower Deployment Details at site:


* Project Management Team:-
a) Site In-charge:
b) Site engineers:
c) Planning engineers :
d) Safety steward/supervisor :
e) Supervisors :

Project * Skilled Un Skilled


Sr. No. Details of Activity
Management Team Labour Labour
1. Anchor Bolt Stage. a, b, c, d
2. Unloading of Material a, b, c, d
3. Painting Work. a, b, c, d
4 House keeping. a, b, c, d
5 Site Production (CF). a, b, c, d
6 Erection work of Structure. a, b, c, d
7 Site Production (Hi-Rib). a, b, c, d
8 Site Production ( SS). a, b, c, d
9 Roofing Work. a, b, c, d
10 Cladding Work. a, b, c, d
11 Finishing Work / Hand Over. a, b, c, d

Page 1 of 2
ERECTOR NAME :..................................

3. Expected Date of Start of work:

4. Expected duration of the Project:

5. Site Visited : Yes/No:

6. Date of Site Visit :

7. Name of the person who visited the site:

8. Pre-Execution meeting done with our Project Manager : Yes / No

9. Date of the Pre-Execution meeting:

10. Name of the Engineer/Supervisor : ….............................................

 Mobile No : . …...........................................
 E-mail ID : ….............................................

Note :- In case the progress of work is found falling short of schedule, Erector shall mobilize additional
resources in terms of manpower, machineries /equipments, tools / tackles and consumables to mitigate the
delay with in a period as instructed by Project In-Charge without any additional cost to IBPL.

The assessment of progress of work at any period, by the Project In-Charge shall be final and binding on
the erector. In case the progress of work is found unsatisfactory, IBPL reserves the right to intervene and
get the job done by engaging other agency, as it may be deemed fit, at Erector's risk and cost.

(Signature of the Erector.)

Date:-

Place:-

Page 2 of 2

You might also like