ADANI POWER MAHARASHTRA LIMITED

IOT ENGINEERING PROJECTS LIMITED

STATION: APML- Unit # 2

5X660 MW Super-critical Thermal


Power plant.

PLANT AREA : ESP TOP

SHEET
Page 1 of 3
DATE : 09/05/2012

TEST REPORT FOR ESP PASS A CHAMBER 1 HEATER

1. Designation : Hopper Heater


2. Location

: Esp Hopper Column A Chamber 1

3. Report for Heating Control Cabinet 1:


Terminals
XT1
(Hopper 1)
XT2
(Hopper 2)
XT3
(Hopper 3)
XT4
(Hopper4 )
XT5
(Hopper5)
XT6
(Hopper 6)
XT7
(Hopper 7)
XT8
(Hopper 8)
XT9
(Hopper 9)
XT10
(Hopper 10)
XT11
(Hopper 11)
XT12
(Hopper 12)
XT13
(Hopper 13)

Phase
A-B

Resistance()
118.5

Phase
A-C

Resistance ()
118.0

Phase
B-C

Resistance()
118.0

A-B

115.8

A-C

115.2

B-C

115.4

A-B

119.1

A-C

119.2

B-C

119.1

A-B

117.9

A-C

118.3

B-C

118.3

A-B

119.1

A-C

118.7

B-C

118.8

A-B

118.5

A-C

118.7

B-C

118.5

A-B

117.5

A-C

117.2

B-C

118.6

A-B

119.0

A-C

119.6

B-C

119.2

A-B

100.1

A-C

84.1

B-C

84.9

A-B

102.3

A-C

84.2

B-C

85.3

A-B

100.6

A-C

85.0

B-C

84.2

A-B

142.5

A-C

95.8

B-C

95.5

A-B

84.9

A-C

84.9

B-C

101.4

Terminals
XT14
(Hopper 14)
XT15
(Hopper 15)
XT16
(Hopper 16)

Phase
A-B

Resistance()
100.2

A-C
A-C

Resistance ()
84.3

Phase
B-C

Resistance()
84.7

A-B

100.5

A-C

82

B-C

84

A-B

84.5

A-C

100.3

B-C

84

SIGNATURE

IOTEP

APML

AIIL

LONGKING

ADANI POWER MAHARASHTRA LIMITED


IOT ENGINEERING PROJECTS LIMITED

STATION: APML- Unit # 2

5X660 MW Super-critical Thermal


Power plant.

PLANT AREA : ESP TOP

SHEET
Page 2 of 3
DATE : 09/05/2012

TEST REPORT FOR ESP PASS A CHAMBER 1 HEATER

4. Report for Heating Control Cabinet 2:


Terminals
XT1
(Hopper 17)
XT2
(Hopper 18)
XT3
(Hopper 19)
XT4
(Hopper 20)
XT5
(Hopper 21)
XT6
(Hopper 22)
XT7
(Hopper 23)
XT8
(Hopper 24)
XT9
(Hopper 25)
XT10
(Hopper 26)
XT11
(Hopper 27)
XT12
(Hopper 28)
XT13
(Hopper 29)
XT14
(Hopper 30)
XT15
(Hopper 31)
XT16
(Hopper 32)

Phase
A-B

Resistance()
62.1

A-C
A-C

Resistance ()
63.8

Phase
B-C

Resistance()
62.0

A-B

58.9

A-C

59.0

B-C

58.5

A-B

59.7

A-C

59.1

B-C

59.3

A-B

58.4

A-C

58.3

B-C

58.2

A-B

58.8

A-C

59.1

B-C

58.6

A-B

59.8

A-C

59.8

B-C

59.8

A-B

58.3

A-C

59.2

B-C

59.1

A-B

59.6

A-C

59.8

B-C

59.4

A-B

59.7

A-C

59.7

B-C

59.4

A-B

59.8

A-C

60.0

B-C

60.2

A-B

59.9

A-C

60.1

B-C

60.2

A-B

60.2

A-C

59.8

B-C

59.7

A-B

59.8

A-C

59.8

B-C

59.8

A-B

58.3

A-C

59.3

B-C

59.2

A-B

59.8

A-C

59.9

B-C

59.4

A-B

59.7

A-C

59.7

B-C

59.7

SIGNATURE

IOTEP

APML

AIIL

LONGKING

ADANI POWER MAHARASHTRA LIMITED


IOT ENGINEERING PROJECTS LIMITED

STATION: APML- Unit # 2

5X660 MW Super-critical Thermal


Power plant.

PLANT AREA : ESP TOP

SHEET
Page 3 of 3
DATE : 09/05/2012

TEST REPORT FOR ESP PASS A CHAMBER 1 HEATER

5. Report for Heating Control Cabinet 3:


Terminals
XT1
(Hopper 33)
XT2
(Hopper 34)
XT3
(Hopper 35)
XT4
(Hopper 36)
XT5
(Hopper 37)
XT6
(Hopper 38)
XT7
(Hopper 39)
XT8
(Hopper 40)

Phase
A-B

Resistance()
59.1

A-C
A-C

Resistance ()
58.7

Phase
B-C

Resistance()
58.6

A-B

59.1

A-C

59.2

B-C

59.7

A-B

58.9

A-C

60.1

B-C

59.2

A-B

58.9

A-C

58.7

B-C

58.7

A-B

59.2

A-C

59.3

B-C

59.5

A-B

59.4

A-C

59.1

B-C

58.7

A-B

58.4

A-C

58.7

B-C

59.1

A-B

59.1

A-C

59.1

B-C

59.1

6. Testing Equipment Details:


Equipment name: digital Multi meter
Model no
: 14S
Serial no
: 107418
Due date
: 31.08.2012
Make
: Rishabh

SIGNATURE

IOTEP

APML

AIIL

LONGKING