You are on page 1of 11

BATELCO (HAMALA)

KINGDOM OF BAHRAIN

CATHODIC PROTECTION
QUATERLY SURVEY REPORT
OCTOBER, 2019

SUBJECT: TERM CONTRACT 2019


PO NUMBER: PO-4500064151

PREPARED BY: NEWTECH INTERNATIONAL W.L.L

30TH OCTOBER 2019

(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e |1 Date 30/10/2019
BATELCO-HAMALA CP SURVEY REPORT REV 0 30/10/2019

Dear Sirs

Newtech International W.L.L have conducted a survey of the CP system for


BATELCO, Hamala and results and conclusion are given on a structure by structure
basis below:

Inspection of a cathodically protected system are necessary to ensure that protection


of the structure is in accordance with applicable criteria, and that each part of the
cathodic protection system is operating satisfactorily and if changes are noted, then
action is taken to return the system to a protection conditions

SYSTEM DESCRIPTION
From Newtech understanding there are Four Cathodic Protection systems operating
at BATELCO, Hamala

1. Underground Diesel tank- ICCP -01 Transformer rectifier


2. Aboveground Domestic tank- Sacrificial Anodes
3. Aboveground Fire hydrant tank- Sacrificial Anodes
4. Aboveground Sprinkler tank- Sacrificial Anodes

(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e |2 Date 30/10/2019
IMPRESS CURRENT CATHODIC PROTECTION (ICCP)

SACRIFICIAL ANODE CATHODIC PROTECTION (SACP)

(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e |3 Date 30/10/2019
UNDERGROUND DIESEL TANK
TRANSFORMER RECTIFIER

Underground Diesel ground storage tank is provided with external cathodic protection
systems within the Batelco, Hamala facility.
System is monitored using portable Copper sulfate electrode and powered via air-cooled
rectifiers located in the electrical control room. The rectifiers are set to operate in constant
current mode.

(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e |4 Date 30/10/2019
OVERALL CONCLUSIONS:

The major areas of concern are as under.

We didn’t receive Design document, CP drawings as well as commissioning report to


establish the type, number of anodes and protection criteria applied to the CP systems while
commissioning. Standard criteria are mentioned below:

- A negative potential of at least -850mV w.r.t a saturated copper-copper sulphate electrode


(CSE). This equates to -780mV for a silver-silver chloride electrode (Ag/AgCl) and +250mV
for a high purity zinc electrode (Zn)

- A minimum 100mV of cathodic polarization. The formation or decay of polarization can be


used to satisfy this criterion.

Underground Diesel Storage Tank:

Findings:

This section is having Impressed Current cathodic protection system protecting the
Underground Diesel storage tank

Transformer Rectifier output was very low. We adjusted the TR output as required.

Off Potential measured above the tank are above -850 mV wrt portable copper sulphate
portable reference electrode which shows the tank is cathodically protected. (Refer the result
sheet)

Recommendations:

We consider that the tank is protected and no additional work is required. A typical shift in
potential of 300mV (negative) is accepted as the industry standard required to provide
cathodic protection to carbon steel. The results clearly demonstrate a negative potential shift
far in excess of this value.

Transformer Rectifier output readings to be noted every week.

Regular monitoring and maintenance should continue.

(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e |5 Date 30/10/2019
UNDERGROUND DIESEL TANK

Transformer Rectifier Details: -

AS FOUND
Tank location – INSIDE ELECTRICAL ROOM Serial No.-10-009-01 Setting :C1,F5

Manufacturer :CTS AC input – 240V 1ph 50HZ O/p Voltage(R): 25V O/p Current(R): 4A

Type – Air Cooled Control- Manual O/p Voltage(o) : 3.3V O/p Current(o) : 0.11A

AS LEFT
Tank location – INSIDE ELECTRICAL ROOM Serial No.-10-009-01 Setting :C3,F3

Manufacturer :CTS AC input – 240V 1ph 50HZ O/p Voltage(R): 25V O/p Current(R): 4A

Type – Air Cooled Control- Manual O/p Voltage(o) : 13V O/p Current(o) : 0.68A

Test Box: -

AS FOUND
Sl.no Potential Readings(mV)/SSC Result
1 -524 Not-Accepted

AS LEFT
Sl.no Potential Readings(mV)/CSE Result
On Off
1 -1124 -936 Accepted

Remarks:-

Transformer Rectifier output readings to be noted every week.

(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e |6 Date 30/10/2019
ABOVE GROUND WATER TANKS

This section is having sacrificial cathodic protection system protecting three above ground
Water tanks.
1. Aboveground Domestic tank- Sacrificial Anodes
2. Aboveground Fire hydrant tank- Sacrificial Anodes
3. Aboveground Sprinkler tank- Sacrificial Anodes

(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e |7 Date 30/10/2019
(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e |8 Date 30/10/2019
(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e |9 Date 30/10/2019
OVERALL CONCLUSIONS:

The major areas of concern are as under.

We didn’t receive Design document, CP drawings as well as commissioning report to


establish the type, number of anodes and protection criteria applied to the CP systems while
commissioning. Standard criteria are mentioned below:

- A negative potential of at least -850mV w.r.t a saturated copper-copper sulphate electrode


(CSE). This equates to -780mV for a silver-silver chloride electrode (Ag/AgCl) and +250mV
for a high purity zinc electrode (Zn)

- A minimum 100mV of cathodic polarization. The formation or decay of polarization can be


used to satisfy this criterion.

Above ground Water tanks :

Findings:

This section is having sacrificial cathodic protection system protecting three above ground
Water tanks.

On Potentials measured at Domestic tank manholes are below -850 mV wrt silver chloride
portable reference electrode which shows the tanks are not cathodically protected. (Refer the
result sheet)

On Potentials measured at Fire Hydrant tank manholes are above -850 mV wrt silver chloride
portable reference electrode which shows the tanks are not cathodically protected. (Refer the
result sheet)

On Potentials measured at Sprinkler tank manholes are above -850 mV wrt silver chloride
portable reference electrode which shows the tanks are not cathodically protected. (Refer the
result sheet)

Roof-external coating for all the three tanks has been removed.

Recommendations:

It seems the sacrificial anodes for domestic tank are consumed/not delivering current ;we
recommend an inspection of the internal sections of the domestic water tank immediately to
check the dimensions of the sacrificial anodes and if required all the CP anodes to be
replaced with new anodes to avoid further corrosion of the tank internals.

Though Potential for fire hydrant and sprinkler tank internals are above -850 mv; we
would recommend an inspection of the anodes and tank internal sections.

It is anticipated that some degree corrosion will be observed and should be repaired before
replacing the anodes.

Tank roof external for all the three tanks to be repainted.

(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e | 10 Date 30/10/2019
T1 -ABOVE GROUND DOMESTIC TANK

AS FOUND
Test Location Potential Result
Readings(mV)/SCE
1 Top -555 Not Accepted
Bottom -560 Not Accepted
2 Top -495 Not Accepted
Bottom -489 Not Accepted

T2-ABOVE GROUND FIRE TANK


AS FOUND

Test Location Potential Result


Readings(mV)/SCE
1 Top -911 Accepted
Bottom -905 Accepted

T3-ABOVE GROUND SPRINKLER TANK

AS FOUND
Test Location Potential Result
Readings(mV)/SCE
1 Top -872 Accepted
Bottom -880 Accepted
2 Top -907 Accepted
Bottom -921 Accepted

(BATELCO,Hamala)QUATERLY CP SURVEY
REPORT Revision No. 0 P a g e | 11 Date 30/10/2019