You are on page 1of 54

KB

Well
Name
East Jata#1
East Jata#1 ST
East Jata#1 ST2

42 ft
AFE
NUMBER
X
X
X

Surface Coordinate

Target Coordinate

BRF

X, ME
379838.442
379838.442
379838.442

Y, MN
9683091.877
9683091.887
9683091.887

X, ME
379940.900
379778.030
380193.000

Y, MN
9683040.000
9682656.270
9683586.000

(ft TVD)
4355
4460
4392

BUR

KOP
(ft MD/TVD)
2700.00
2400.00
2400.00

Azimuth
(deg.)
116.85
187.90
35.66

Inclination
(degree)
15.03
44.34
59.55

EOC
(ft MD)
3201
3508
3889

North/South
(ft)
-170.20
-1429.19
1621.11

East/West
(ft)
336.15
-198.20
1163.25

East Jata#1
East Jata#1 ST
East Jata#1 ST2

3.00
4.00
4.00

TD (IF 85 ft MD below Top Basement )


MD
4630
5255
5818

D = Square Root of
CoordinateX)^2 + (T

2 * 3.14 * r / 360 =

Example :
A = 15.031
MDEOB = 3201.03
TVDEOB = 3195.55

sin A =

0.259

cos A =
E=

0.777
65.377

KOP = 2700.00
TVD of TD =

4575.00
MDX = 2400.00
MDTD = 4629.81

or

TVDx = 2300.00

Thus,

Thus,
r=
TVD of EOB =
B=
MDX =
G=

1910.83
3195.55
1379.45
G / B * (MDTD - MDEOB) + MDEOB
-773.37

r = 1910.83
TVD of EOB = 3195.55
B = 1379.45
G = -895.55
MDX = 2273.45

TVDx = 2422.18

Example :
A=
MDEOB =
TVDEOB =
KOP =
TVD of TD =

44.338
3508.46
3401.60
2400.00
4650.00

MDX = 5507.05

sin A =
cos A =
E=

0.699
0.715
408.116

TVDx = 4830.00

or

MDTD = 5255.20
Thus,

Thus,
r=
TVD of EOB =
B=
MDX =
G=

1433.12
3401.60
1248.40
G / B * (MDTD - MDEOB) + MDEOB
1428.40

TVDx = 4830.00

r = 1433.12
TVD of EOB = 3401.60
B = 1248.40
G = 1428.40
MDX = 5507.05

BRF

Basement

Total Depth

(SS ft)
-4313
-4418
-4350

(ft TVD)
4475
4520
4462

(SS ft)
-4433
-4478
-4420

(ft TVD)
4575
4650
4612

(SS ft)
-4533
-4608
-4570

Ver. Sect.
(ft)
377
1443
1995

X2
(ft)
65
408
706

BRF
(ft MD)
4402
4990
5384

Basement
(ft MD)
4526
5073
5522

Total Depth
(ft MD)
4630
5255
5818

D (IF 85 ft MD below Top Basement )


TVD
SS
4575
-4533
4650
-4608
4612
-4570

These below Data are Selected :


D = Square Root of ( (Target CoordinateX - Surface
CoordinateX)^2 + (Target CoordinateY - Surface CoordinateY)^2
KOP, TVD and r
Before KOP :
TVD = MD
After KOP and before EOB :
E = r * (1 - cos A)
2 * 3.14 * r / 360 = MDi/ A
MDi = 3.14 * (r / 180) * A
TVDi = r * sin Ai + KOP
BG = Selected
BG = Ai / MDi
MDEOB = 3.14 * (r / 180) * A + KOP
TVDEOB = r * sin A + KOP
After EOB to TD :
MDX = G / B * (MDTD - MDEOB) + MDEOB
TVDX = TVDEOB + G

3281.00

113.15
1915.75

KB
Well
Name
Jata-2A
Jata-2B

50 ft
Surface Coordinate

X, ME
Y, MN
X, ME
Y, MN
378407.200 9681817.300 378140.000 9681431.000
378407.200 9681817.300 379136.600 9681235.700
BUR

Jata-2A
Jata-2B

Target Coordinate

3.50
3.50

KOP

Azimuth

(ft MD/TVD)

(deg.)

700.00
700.00

214.67
128.57
North/South East/West
(ft)
(ft)

-1267.39
-1908.14

-876.64
2393.04

Inclination

Baturaja
(ft TVD)
4610
4580
EOC

Basement

(SS ft) (ft TVD)


-4560 4680
-4530 4710
Ver.
Sect.
(ft)

X2

(degree)
(ft MD)
(ft)
23.34
1367
1541
134
43.48
1942
3061
449
TD (IF 85 ft MD below Top Basement )
MD
TVD
SS

5126
6055

4800 -4750
4810 -4760

(SS ft)
-4630
-4660
BRF
(ft MD)
4919
5738

Total Depth
(ft TVD)
4800
4810

(SS ft)

Basement

Total
Depth
(ft MD)
5126
6055

(ft MD)
4995
5917

-4750
-4760

PT EXSPAN NUSANTARA
DRILLING PROGRAM (REVISION #1)
AREA :
Loc. No. :
SL
TL1

PSC - SOUTH SUMATERA EXTENSION


EAST JATA#1
Appro. No.

: X = 379,838.442 ME
Y = 9,683,091.877 MN
: X = 379,940.90 ME
Y = 9,683,040.00 MN

Est. GL Elev.
Est. KB Elev.
Est. TD

:
:
:

Field & Well No. :


02-0743X

EAST JATA#1
Rig

feet
45
feet
4575
feet TVD
4630
feet MD
100' in basement

Est. Cost
Tangible
Intangible
Drilling days

(Directional) ( Wildcat ).
EMSCO

:
:
:
:

599
56
543
17

k$ (dry hole basis)


k$
k$
days

Sub surface : SL 1646/91, SP 2332.

I. GEOLOGICAL OUTLINE
OBJECTIVE (S) :

BATURAJA FORMATION
Tops for

FORMATION

Est Gradient

Subject Well

Lithology

Jata#1

KB TVD

SS

KB TVD

SS

Baturaja

4355

-4310

4478

-4432

Limestone

Basement

4475

-4430

4524

-4478

Metasediment

TD

4575

-4530

4636

-4590

TOTCO SURVEY AT :
Mud Logger
:
Core`s
Completion test

:
:

pressure @ Top
(psi/ft)
0.43

Electric Logs
Depth Interval

Run II : From TD (8-1/2" hole)


to 9 5/8" csg shoe.

Metasediment
Refer to Jata#1
No abnormal pressure
is suspected

Logging

Run I : From TD (12-1/4" hole) DPIL-BHC Acoustic-GR


to 13 3/8" csg shoe (prior to set w/ scale 1:240 & 1:600
9-5/8" csg)
GR continue to surface

DPIL-MLL-BHC Acoustic-GR
w/ scale 1:240 & 1:600
ZDL-CNL-GR
SWC, for reservoir analysis
RFT and Star
Velocity Survey

At total depth
Every bit change and casing point.
Gas detector should be run from surface casing to final TD. Take sample every 10' from 9-5/8" casing shoe to TD.
Save one set of dry sample in envelope and one set of wet sample in cloth bag.
No conventional core neither DST's. SWC will be taken as adviced by geologist
Test beds with good hydrocarbon shows through pipe

II. DIRECTIONAL PROGRAM


TVD
MD
SURVEY

KOP

EOB

Baturaja

BSMT

TD

2700
2700
MWD

3195
3201
MWD

4355
4402
MWD/MSS

4475
4526
MSS

4575
4630
MSS

REMARK
BUR
Azimuth
Final Angle

=
3
o
= 116.91
o
= 15.03

deg/100 ft @ EOB
@ EOB to TD

III. CASING PROGRAM


SIZE
Inch

WT GRADE THREAD DEPTH SET


PROPERTIES WITH S.F, psi
(lbs/ft)
ft KB
Tens SF1.5 Colaps SF:1.0 Burst SF: 1.233

20

94

H-40

STC

13 3/8

48

H-40

9 5/8

36

K-55

150

387

BTC

600

BTC

2300
4630

5 1/2" 15.5
J-55
BTC
Note : *) S.F = 1.125, **) S.F = 1.1
REMARKS:

CENTRALIZER
ea

PIT TEST
ppg
NONE

520

1240

215

740

1430

13

503

2020

2944

10

14.2

200

3591*)

4564**)

20

NONE

1. 9 5/8" casing shoe set at consolidated formation or Shale.


2. 5 1/2" casing shoe will be decided base on the result of geological evaluation & drilling constraint.

PT EXSPAN NUSANTARA
DRILLING PROGRAM (REVISION #1)
IV. CEMENTING PROGRAM
CSG SIZE
(INCH)
20"
13 3/8"
9 5/8"
5 1/2"
REMARKS:

HOLE SIZE
TD
(INCH)
(FEET)
26
160
17 1/2"

610

EST. TOC
(FEET)
Surface

SXS
320

Surface

TYPE CEMENT ADDITIVE SYSTEM


A

2% CaCl2 + 0.005 gps Dair-2. Grout cement on surface if required, and dump cellar w/ 20 sxs A
cmt + 4% CaCl2 to surface.
Lead: 2% pH Gel + 0.005 gps Dair-2 (30% Excess)

280
G
200
G Tail: 0.005 gps Dair-2
12 1/4"
2310
500
360
G Lead: 2% pH Gel + 0.005 gps Dair-2 (10% Excess)
240
G Tail: 0.005 gps Dair-2
8 1/2"
4630
3300
240
G 0.25 gps H322L+ 0.005 gps Dair-2. (20% Excess)
Plug & Abandon
400
G 0.25 gps H322L+ 0.005 gps Dair-2. (20% Excess)
1.Test lab cement slurry will be conducted by Halliburton and check again with actual water sample from location.
2.The cement consumption in the program above is estimation only, the actual requirement will be decided based on the hole condition and
caliper log data
3. Set TOC behind casing 9-5/8" + 300' above top coal zone.

V. WELLHEAD EQUIPMENT
1.
2.
3.
4.

Casing Head (Section "A") : 13 5/8" x 13 3/8" Flange x 9-5/8" hanger - 3000 psi WP
Casing Spool (Section "B") : 13 5/8" x 11" Flange x 5-1/2" hanger - 3000 psi WP
Tubing Head Spool : 11" x 7 1/16" Flange x 2-7/8" EUE hanger - 3000 psi WP.
X-Mastree - 7 1/16" x 2-9/16" Flange - 3000 psi WP (2-1/16" Master valve + Studded Tee + 2-1/16" Crown valve + 2-1/16" Wing valve)
will be installed upon completion

VI. BLOWOUT PREVENTION EQUIPMENT


SECTION
CONDUCTOR 20"
SURFACE 13 3/8"
INTERMEDIATE 9 5/8"

DEPTH
(FEET)
120
600
2300

BOP STACK

BOP TEST
(PSI)
50 & 200
200 & 1500
200 & 2000

21 1/4" DIVERTER 2000 PSI WP


12" BOP W/4.5" BR & PR 3000 PSI WP
12" BOP W/4.5" BR & PR 3000 PSI WP

ARRANGEMENT
HYDRIL MSP 2000 PSI
HYDRIL GK + BR + PR RAMS
HYDRIL GK + BR + PR RAMS

REMARKS: 1. Check and ensure all the BOP equipment is in good condition & Pressure test as per SOP. Test all line HCR - Manifold.
2. Flush BOP and diverter line w/ water to clean up immediately.
3. Accumulator unit press 1500 psi and check Nitrogen Bottle.

VII. MUD PROGRAM


Interval (Feet)
0
160
610
2310

- 160
- 610
- 2310
- TD

Weight

Vis

WL

PV

YP

pH

(ppg)

(qrt/sec)

(cc/30 m)

(cP)

(lb/100 ft )

Native Mud
9.2 9.4
9.8 10.0
10.1 10.3

45 - 50
45 - 50
50 - 55

<8
8 - 10
8 - 10

8 - 10
8 - 12
10 - 12

8-10
8-10
10 - 12

9.5
9.5
9.5

Solids
(%)

Sand
(max)

8 - 10
8 - 10
8 - 12

0.25 %
0.25 %
0.25 % 262

Overbalance
Remarks
psi
At (ft KB) Beware lost
circ. At BRF

- 309

4575

NOTE: 1. Run Desander and Desilter continously, make sure these equipment are in good working condition.
2. Maintain MW at program level to avoid underballance/well flowing. Conduct drilling control to avoid mud ring & bit balling problems.Reduce ROP
if necessary.
3. Do trip in / out with full precaution to avoid pressure surge and swabbing. Use trip tank to observe fluid level.
4. Circ. Out gas if any until back to BG prior to continue drilling.
5. Increased MW gradually if needed, if the total gas could not be reduced to BG after circulating out gas.
6. Increased MW 0.1- 0.2 ppg prior to POOH to run Logging or run Casing (if no loss circ.). If lost circ' Mix LCM (Nut plug, indorapaseal).
Sweep w/ Hi-Vis mud prior to POOH
7. If hole collapse/sloughing shale occurred, mud weight will be increased up to 10.3 ppg gradually.
(Be ware of possibility differential sticking and lost circulation).
8. Circ. and condition mud to reduce PV & YP prior to cementing.

PT EXSPAN NUSANTARA
DRILLING PROGRAM (REVISION #1)
VIII. BIT AND HYDRAULIC PROGRAM
INTERVAL
(Feet)

HOLE
SIZE

TYPE
IADC

WOB
K lbs

NOZZLE
(1/32)

RPM

PRESS
(psi)

RATE
(GPM)

A.V
fpm

PUMP
make

LINER
SIZE
INCHI

DB-550
GD-FXN

6"
6"

jet
61
55

160

26"

111

2-4

3 x 20

60-80

170 - 180

300

11

160

610

8 1/2"

117

5 - 10

3 x 13

100-120

300 - 500

300

141

(pilot)
160

610

17 1/2"

111

10 - 15

610

2310

12 1/4"

117M

12 - 15

2310

4407

4407

TD

8 1/2"

8 1/2"

117M

517

15 - 20

20 - 23

3 x 18
3 x 16

3 x 20

3 x 16

100-120

600 - 800

650

56

100

1100-1300

600

113

100

80-90

1400

1400

400

400

189

189

F2/Eq

STROKE
(spm)

DB-550

6"

GD-FXN

6"

DB-550

6"

50

GD-FXN

6"

55

DB-550

6"

55

GD-FXN

6"

50
55

DB-550

6"

GD-FXN

6"

DB-550

6"

GD-FXN

6"

55

IX. BOTTOM HOLE ASSEMBLY PROGRAM


HOLE SIZE DEPTH
inch

feet MD

26"

0 - 150

BHA DESCRIPTION
26" Bit + 6.5" DC x 2 jts
8 1/2" Bit+ 6 1/2" DC x 8 jts + 5"HWDPx4 jts

REMARKS
Drilling formation

8 1/2"

150 - 610

17 1/2"

150 - 610

12 1/4"

610 - 2310

12 1/4" Bit+ 6 1/2" DC x 12 jts + 6-1/2" DJ + 5"HWDPx4 jts

Drilling formation

8 1/2"

2310 - TD

8 1/2" Bit+ 6 1/2"Motor+6 1/2" Monel+ 6 1/2" DC+5" HWDPx4 jts+6 1/2" DJ+5"HWDPx18jt

Drilling formation

17 1/2" Bit + Bs + 6 1/2" DC x 8 jts + 5" HWDP x 4 jts

Drilling formation
Enlarge Hole

PERTAMINA - PT EXSPAN SUMATERA


DRILLING PROGRAM
DRILLING TIME ESTIMATE
KAJI SEMOGA # 84 ( SLOT U5)
Drill 17" hole &
Set 13 3/8 " casing at 60 ft MD.

MD (ft)
0

DAYS

10

Casing Depth Mud program ( ppg )


(Ft - KB) 8.8 9.2 9.6 10.0

Drill 12-1/4" hole to KOP at 180 ft MD

Drill 12 " hole, ROP +/- 51 ft/hr

1000

Set 9 5/8" Csg @

ft MD KB. N/U BOP Stack

1500

2000
Drill 8" Hole, ROP +/- 45.5 ft/hr

2500
Change BHA @ 3152' MD

3000
BRF @

3500

ft MD KB

Basement @
Final TD @

ft MD KB
ft MD KB

Drill 8" Hole, ROP +/- 21.1 ft/hr


Logging & Prod. casing

4000

4500

DEPTH
0
0

BLOW OUT PREVENTER TESTS


PIPE RAMS,CM,HYDRIL,KELLY W/ PLUG TESTER BLIND RAMS, CASING
REMARKS
Diverterless System.
BOP stack - 200 & 1500 psi
1500 psi
Test fluid - clear water

1. Run desander & desilter continuously. Dump mud if necessary only.


2. Maintain MW at program level to avoid underbalance/lost circulation.
prepare LCM ( Jelflake , MICA fine, Nut plug fine) on site.
Conduct drilling control to reduce mud ring problems.
3. Add Indo Rapaseal If lost occured when penetrating Baturaja Formation.
4. Do tripping with full precaution to avoid swabbing effect and pressure surge.
5. Circulate out gas, if any, until total gas back to background prior to cont. drilling
increase MW if necessary to make TG back to BG.
6. Circulate and condition mud to reduce PV & YP as low as practical prior to Cementing.

PERTAMINA - EXSPAN NUSANTARA


DRILLING WELL RECORD
Area
Well No.
Well Type
Field

:
:
:
:

South Sumatera Rimau Block


East Jata # 1
Exploration / Wildcat Well
Jata

Rig
:
Rig Type :
Rig Supt. :
Drill. Eng.:

Emsco
Land
Dasri H
Gustioro

AFE No.
Vert - Dir - Hor
Distance
Geologist

:
:
:
:

02-0743-X
Directional
5.0km (Matra #3)
Erham
Sumarno

Service Coy. : Mesina Rapa , Exlog Sarana Indonesia


Halliburton Indonesia
GEOLOGICAL RECORD
FORMATION
(top position)
Original Plan
BATURAJA
BASEMENT
TD
1st Sidetrack
BATURAJA
BASEMENT
TD
2 nd Sidetrack
BATURAJA
BASEMENT
TD

DEPTH (feet - KB)


Cutting Logging

TG
(unit)

4375
4486

28
10

5035
5155

13
10

5446
5567
5677

17
10
10

ELECTRICAL LOG

DIFL-BHC-GR ; CNL-ZDL-GR
Velocity Survey

DIFL-BHC-GR ; CNL-ZDL-GR

DIFL-BHC-GR on PCL; CNL-ZDL-GR

CASING, LINER, & PIT TEST RECORD


TYPE

OD WEIGHTGRADETHREADCENTRASCRAT LENGTHSET. DEPTH (ft)


PIT TEST
(inch) (ppf)
LIZER CHER (feet) F/LC F/GS DEPTH (ft)PRESS (psi)MW (ppg) EMW (ppg)
Surface
20
94
H-40
STC
none none
167
none
167
none
none
none
none
Conductor 13-3/8 48
H-40
BTC
5
none
629
600
645
665
120
9
12.5
Protective 9-5/8
36
K-55
BTC
10
none 2272 2272 2317
2340
500
9.6
14.2

CEMENTING JOB RECORD


SACKS
TCA* TOC** SW SY
BHST/
(% xcs)
(feet) (feet) (ppg) (cuft/sx)BHCT(F)
20 "
A cmt+2%CaCl2 + 0.005 gps Dair2
320
Surface 135 15.8 1.52
nc
(2,5 bbl cement return to surface )
30%
13-3/8" G cmt+2%-phGel+0.005 gps D-air2 Lead : 320 Surface 592 14.8 1.34
nc
G cmt+0.005 gps D-air2
Tail : 240
15.8 1.52
(No cement return to surface )
30%
9-5/8"
G cmt+2%-phGel+0.005 gps D-air2 Lead : 360 550 2265 14.2 1.34
nc
G cmt+0.005 gps D-air2+0.1 gps HR6LTail : 240
15.8 1.52
10%
Plug 1st ST G cmt + 0.005 gps Dair2
160
16.8 1.1
Plug 2nd ST G cmt + 0.005 gps Dair2 + 0.1 gps HR6L 160
16.8 1.1
P&A
G cmt + 0.005 gps Dair2
280
3 spot
15.8 1.52
A cmt + 0.005 gps Dair2
60
Surface
15.8
* TCA : Top of Cement in Anulus
** TOC : Top of Cement inside casing (before drill out cement)
JOB TYPE

CEMENT SYSTEM

SPACER

TT COMP. S.
(hrs)
(psi)
fresh water 4
nc
fresh water

nc

fresh water

nc

fresh water 3 : 14
fresh water 3 : 14
fresh water 3 : 14

nc
nc
nc

Page 12

MUD RECORD
DEPTH WEIGHT FUNN VISC PV
YP
GELS
2
2
(feet)
ppg
second
CP lb/100 ft lb/100 ft
0
8.6 - 8.8
665
9.4 - 9.6
40-45
9-10 18-20
11/23
2340
9.6-9.9
48-50
12-14 18-20
14/32
TD
10.0-10.2
50-55
12-14 18-20
12/25

pH WTR LOSS FC
SAND SOLID CHLOR. CALC.
ml/30 min 32nd in % by vol.% by vol. % by vol. % by vol.
Native Mud
9.5
9
1
0.15
8
100
9.5
7
1
0.15
9
100
9.5
6
1
0.25
9
120

MUD
TYPE
Spud
PHPA
PHPA
PHPA

BIT AND HYDRAULIC RECORD


BIT No. SIZE
RR - N
In
1 RR
26
2 RR
8
3 RR
17
4 New 12
5 RR
8
6 New
8
7 New
8
8 New
8
9 New
8
10 New 8
11 New 8
12 New 8
13 New 8
14 New 8
15 RR
8
16 New 8

MAKE
HTC
TSK
REED
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK

TYPE SERIAL NO NOZZLES DEPTH FTG


(IADC)
(feet) (ft)
3AJ
25989
out
170 170
SSTMGP 46865-T
3 x 13
655 485
L3A
1214
3 x 16
655 485
SSTMGP 47276-T
3 x 18
2330 1675
SSTMGP 46865-T
3 x 13
2693 363
SSTMGP 47283-T
3 x 20
4382 1689
M20GFP 47287-T
3 x 16
4486 104
M20GFP 47291-T
3 x 16
4694 208
M20GFP 47292-T
3 x 16
4740 46
SSTMGP 48031-T
3 x 20
4106 1789
SSTMGP 47281-T
3 x 20
5043 937
M20GFP 46875-T
3 x 16
5155 112
SSTMGP 46860-T
3 x 20
4543 2109
SSTMGP 48027-T
3 x 20
5157 614
SSTMGP 48027-T
3 x 20
5467 310
M20GFP 47201-T
3 x 20
5677 210

HRS RATE WOB RPM GPM PRESS


BIT CONDITION
(ft/hr) (klbs)
(psi) I O D L B G O R
3
57
5
100 300
150 1 1 NO A 1 I NO TD
4
121
5
100 340
900 2 2 FC A 2 1/16 NO TD
3.5
139
10
100 600
900 2 3 NO A E 1/16 NO TD
10.5 160
15
120 600
1300 1 2 NO A E 1/16 NO TD
6.5
56
10
120 400
1200 2 3 FC A 2 1/16 NO BHA
30.3
56
15
120 420
1600 7 5 NO A E 1/4 NO BHA
10
10
20
100 420
1500 1 1 NO A E 1/16 NO TD
19.8
11
20
100 420
1500 5 5 NO A E 1/16 NO PR
6.3
7
20
100 420
1500 2 2 NO A E 1/16 NO TD
31
58
20
100 420
1500 4 2 NO A E 1/16 NO PR
25.5
37
20
100 420
1500 4 2 NO A E 1/16 NO BHA
7.8
14
20
100 420
1200 2 1 NO A E 1/16 NO TD
45
47
20
100 420
1500 2 2 NO A E 1/16 NO PR
16.5
37
20
100 420
1700 1 1 NO A E 1/16 NO PP
5
62
20
100 420
1700 2 2 NO A E 1/16 NO BHA
16
13
20
100 420
1700 1 1 NO A E 1/16 NO TD

MATERIAL CONSUMPTION RECORD


GEL BAR
sx
sx

CS
sx

DD
ltr

SB
sx

306

73

300

40

310

DRILLING FLUID ADDITIVE / LCM MATERIAL


RC BT PS SOL SPC Reb-L MC JF
pail
sx
cn
sx
sx
sx
sx
sx
138

67

NP
sx

FT
sx

CEMENT ADDITIVE
INRA PL CaCl2 HR6L H322 DAIR
sx
ltr
sx
gln gln gln
-

15

BOTTOM HOLE ASSEMBLY RECORD


HOLE SIZE INT. DRILLED
BHA DESCRIPTION
(in)
(feet)
26
0 - 170
26" Bit + BS + 6.5" DC x 2 jts
8
170 - 655
8" Bit + 4 jts x 6.5" SPR DC + 2 jts x 4.5" HWDP
17
170 - 655
17" Bit + 4 jts x 6.5" SPR DC + 2 jts x 4.5" HWDP
12
655 - 2317
12" Bit +10 jts x 6 " DC + 4 jts x 5" HWDP
8
2317 - TD
8" Bit + Mud Motor + 6 " MNDC + 9 jts x 5" HWDP + Jar + 18 jts 5" HWDP

REMARKS
Spud in & Drill
Pilot hole
DO. Cmt, Drill & Circ.
DO. Cmt, Drill & Circ.
DO. Cmt, PIT & Drill

BREAK DOWN DRILLING TIME RECORD


MIRU TRIP DRILL CIRC CSG CMT BOP LOG HOLE PROB.
hrs hrs hrs hrs hrs hrs hrs hrs
hrs
168

15.5 354

46

15.5

31

37.5

51

27

RPR WAITING REAMING OTHERS


hrs
hrs
hrs
hrs
61

9.5

120'
800'
1800'
4200'
PREPARED BY : Gustioro

PREPARED DATE : Octobert' 2002

REMARKS
based on daily rig report and
well sitting drill. eng. record
1814'
4195'
51'
814'

APPROVED BY :

Page 13

9/22/2013
Days vs Depth
East Jata#1 (DRY HOLE BASIS)

Time (Days)
0

26" hole

10

15

20

25

30

20" csg at 150 ft, N/U Diverter

9.2 - 9.4 ppg


1000

13-3/8" csg at 600 ft, N/u BOP stack


8" pilot hole
17 " hole
9.4- 9.5 ppg
12 " hole

2000
9.8 - 10.0 ppg

Run Log 1
9-5/8" csg at 2300 ft

SIDETRACK TO N 187 E

SIDETRACK TO N 35.6 E
KOP @ 2400

Depth FT (MD)

KOP @ 2400
3000

8 " hole

8 " hole

4000
8 " hole
5000

TD @ 4740' MD/4680'TVD
6000

7000

Program

Actual

35

40

DAYS

DEPTH

26" Section
5-Sep-02

0
0.4

0
170

5.5

1.5

6-Sep-02
1.4
17-1/2" Section
7-Sep-02
2.4
8-Sep-02
3.4
12-1/4" Section
9-Sep-02
4.4
10-Sep-02
5.4
11-Sep-02
6.4
12-Sep-02
7.4
13-Sep-02
8.4
14-Sep-02
9.4
15-Sep-02
10.4
16-Sep-02
11.4
17-Sep-02
12.4
18-Sep-02
13.4
19-Sep-02
14.4
20-Sep-02
15.4
21-Sep-02
16.4
22-Sep-02
17.4
23-Sep-02
18.4
24-Sep-02
19.4
25-Sep-02
20.4
26-Sep-02
21.4
27-Sep-02
22.4
28-Sep-02
23.4
29-Sep-02
24.4

170

1.5

6.5 0.5

1753
2330
2330
2330
2693
2899
3850
4288
4423
4486
4605
4694
4740
2358
2358
3387
4106
4544
5043
5150
5155

5.5 8.5

1
15

10

2.5

4.5

5.5

11

4 3.5

11

11.5

3.5

1.5

7
7

6 1.5

8.5

2.5 10.5

20
16
9
6.5

10

0.5

4.5

13.5

3.5

4.5
8.5

4.5
1.5

5
10

7
12

7.5
1

24
23

14

23.5

0.5

11

11

0.5

9.5

11

OTHER EVALUATION

CEMENTING

TESTING PRODUCTION

CIRCU / CONDITIONING

EVALUATION

2.5

TRIP EVALUATION

LOGGING

OTHER DRILLING

N/U N/D BOP TESTING

WOC

DRILLING
PRODUCTIVE TIME

DATE

655
655

CEMENTING

RUNNING CASING

TRIPS / LAY DOWN PIPE

DRILLING

ENLARGE HOLE / UDER REAM

WELL NO : East JATA#1


MOVE DATE : 28-Aug-02
SPUD IN :
4-Sep-02
MOVE DAYS :
7

CON MUD / HOLE CIRCULATION

DRILLING TIME

30-Sep-02
1-Oct-02
2-Oct-02
3-Oct-02
4-Oct-02
5-Oct-02
6-Oct-02
7-Oct-02
8-Oct-02
9-Oct-02
10-Oct-02
11-Oct-02
12-Oct-02
13-Oct-02
14-Oct-02
15-Oct-02

25.4
26.4
27.4
28.4
29.4
30.4
31.4
32.4
33.4
34.4
35.4
36.4
37.4
38.4
39.4
40.4

TOTAL

40

5155
3449
4293
4543
5011
5166
5467
5626
5677
5677
5677
5677
5677
5677
5677
5677

22.5

0.5

0.5

0.5

22
`

24
13

18

0.5

5.5

2.5 13.5

17.5

3.5

13

6.5

2.5

11

1.5

9.5
4

14

6 0.5 3.5

11
1

354

20

14

9 46 225 16 31 57 38 10 51

Hrs
%
841.5
87%

PRODUCTIVE TIME
DRILLING
DRILLING
354
ENLARGE HOLE / UDER REAM 8.5
CON MUD / HOLE CIRCULATION46
TRIPS / LAY DOWN PIPE
225
RUNNING CASING
16
CEMENTING
31
WOC
57
N/U N/D BOP TESTING
38
OTHER DRILLING
9.5
EVALUATION
LOGGING
51
TRIP EVALUATION
0.5
CIRCU / CONDITIONING
6.5
TESTING PRODUCTION
0
CEMENTING
0
OTHER EVALUATION
0
NON PRODUCTIVE TIME
PROBLEMS
FISHING JOB

127.5
0

36%
1%
5%
23%
2%
3%
6%
4%
1%
5%
0.1%
0.7%
0.0%
0.0%
0.0%
13%
0%

Production Time 87%


NPT
Hole Problem
Hole Instability

0%
3%

LOST CIRCULATION
KICK / KILLING WELL
HOLE INSTABLE
OTHER
REPAIRE
DRILLING EQUIPMENT
OTHER REPAIR
WAITING
MATERIALS / EQUIP
TRANSPORTATION
OTHERS / INSTRUCTION
WEATHER
TRANSPORTATION
OTHER WEATHER
MOVING
MOVING
R/U
OTHERS

0
0
27
34

0%
0%
3%
3.5%

Other

3.5%

Repaire Rig Eqp6.2%


Waiting on
0.0%
61

61
0

6%
0%

0
0
6.5

0%
0%
1%

0
0

0%
0%

0
0
0

0%
0%
0%

Total

12%

PROBLEMS

REPAIRE
WAITING WEATHER
NON-PRODUCTIVE TIME

OTHERS

R/U

MOVING

OTHER WEATHER

TRANSPORTATION

OTHERS / INSTRUCTION

TRANSPORTATION

MATERIALS / EQUIP

OTHER REPAIR

DRILLING EQUIPMENT

OTHER

HOLE INSTABLE

KICK / KILLING WELL

LOST CIRCULATION

FISHING JOB

RILLING TIME

MOVING

TOTAL
9

46,244

24

53,894

53,894
72,773

24

72,773
82,590

82,590
112,254

112,254
124,052
133,288
422,280
439,090
449,838
463,004
470,725
480,089
510,135
520,730
535,050
545,004
558,115
663,705
673,235
684,480
703,710
711,948
734,453
767,777

124,052
133,288
422,280
439,090
449,838
463,004
470,725
480,089
510,135
520,730
535,050
545,004
558,115
663,705
673,235
684,480
703,710
711,948
734,453
767,777
777,478

24
24
24
24
18
8

24
3.5

24

6.5

24

24

24

24
24

3.5

24
1.5

Previous

Cum Cost
Today

24
24
24
24
24
24
24
24
24
24

24
24
24
4

24
24

24

24
24

24

13

24

17

24
24

13
14

24
2

24
3

24
24

0 27 34 61

969
40.38

777,478
836,775
855,942
864,787
872,867
894,421
903,928
914,238
927,931
955,055
962,844
969,471
978,507
988,654
996,606
1,136,055

836,775
855,942
864,787
872,867
894,421
903,928
914,238
927,931
955,055
962,844
969,471
978,507
988,654
996,606
1,136,055
1,148,328

Cum Cost
Cost/day
7,650
18,879
9,817
29,664
11,798
9,236
288,992
16,810
10,748
13,166
7,721
9,364
30,046
10,595
14,320
9,954
13,111
105,590
9,530
11,245
19,230
8,238
22,505
33,324
9,701

617,461

59,297
19,167
8,845
8,080
21,554
9,507
10,310
13,693
27,124
7,789
6,627
9,036
10,147
7,952
139,449
12,273

173,070

1,102,084

574,221
14,222

101.15

DEPTH
1

SPUD IN
DRILL HOLE 26"

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

TRIP OUT 26"


CASING 20"
CEMENTING 20" CSG
WOC
N/U 20" DIVERTER 2000 WP
TRIP IN 8-1/2" BIT TO TOC
DRILL Pilot 8-1/2" HOLE
CBU, TRIP OUT 8-1/2" BIT
TRIP IN 17-1/2" BIT TO TOC
DRILL 17-1/2" HOLE
CBU, TRIP OUT 17-1/2" BIT
CASING 13-3/8"
CEMENTING 13-3/8" CSG
N/U BOP STACK
TRIP IN 12-1/4" BIT
DRILL - I HOLE 12-1/4"
CBU, WIPER TRIP & TRIP OUT 12-1/4" BIT
INTERMEDIATE LOGGING
TRIP IN TO WIPER TRIP, CBU
TRIP OUT 12-1/4" BIT
CASING 9-5/8" CSG
CBU, CEMENTING 9-5/8"
N/U WH & BOP STACK
TRIP IN 8-1/2"
DRILL - I HOLE 8-1/2" >>>
HOLE PROBLEM
CBU, TRIP OUT TO CHANGE BIT
TRIP IN 8-1/2" BIT
DRILL - II HOLE 8-1/2" >>>
HOLE PROBLEM
CBU, TRIP OUT & WIPER TRIP
PRODUCTION LOGGING
TRIP IN 8-1/2" BIT TO WIPER TRIP
PLUG BACK JOB, WOC
CASING 5 1/2"
CBU, PROD. CEMENTING 5 1/2"
N/D BOP. N/U WH
RIG DOWN
DRILL - I HOLE 8-1/2" >>>
DRILL - I HOLE 8-1/2" >>>
HOLE PROBLEM
CBU, TRIP OUT TO CHANGE BIT
TRIP IN 8-1/2" BIT

0
150
150
150
150
150
150
150
600
150
150
600
600
600
600
600
600
2300
2300
2300
2300
2300
2300
2300
2300
2300
4400
4400
4400
4400
4650
4650
4650
4650
4650
4650
4650
4650
4650
4650
2400
4990
4990
4990
4990

150

450

450

1700

2100

250

0
2590

ROP
FPH
0
30
0
0
0
0
0
0
30
0
0
30
0
0
0
0
0
40
0
0
0
0
0
0
0
0
30
0
0
0
10

HOUR

30
30
0
0
0

86.3
5.0
5.0

0
5.0
1.5
6.0
3.0
8.0
8.0
1.0
15.0
2.0
2.0
15.0
4.0
12.0
3.0
12.0
4.0
42.5
8.0
12.0
8.0
8.0
15.0
2.0
12.0
6.0
70.0
8.0
6.0
25.0
12.0
48.0
10.0
24.0

TOTAL
HOUR
0
5.0
6.5
12.5
15.5
23.5
31.5
32.5
47.5
49.5
51.5
66.5
70.5
82.5
85.5
97.5
101.5
144.0
152.0
164.0
172.0
180.0
195.0
197.0
209.0
215.0
285.0
285.0
293.0
299.0
324.0
324.0
336.0
384.0
394.0
418.0
418.0
418.0
418.0
418.0
418.0
504.3
504.3
509.3
514.3

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
59
60
61
62
63
64
65
66
67
68

DRILL - II HOLE 8-1/2" >>>


HOLE PROBLEM
CBU, TRIP OUT & WIPER TRIP
PRODUCTION LOGGING
TRIP IN 8-1/2" BIT TO WIPER TRIP
L/D STRINGS
CASING 5 1/2"
CBU, PROD. CEMENTING 5 1/2"
N/D BOP. N/U WH
RIG DOWN
DRILL - I HOLE 8-1/2" >>>
DRILL - I HOLE 8-1/2" >>>
HOLE PROBLEM
CBU, TRIP OUT TO CHANGE BIT
TRIP IN 8-1/2" BIT
DRILL - I HOLE 8-1/2" >>>
HOLE PROBLEM
CBU, TRIP OUT TO CHANGE BIT
TRIP IN 8-1/2" BIT
DRILL - II HOLE 8-1/2" >>>
HOLE PROBLEM
CBU, TRIP OUT & WIPER TRIP
PRODUCTION LOGGING
TRIP IN 8-1/2" BIT TO WIPER TRIP
L/D STRINGS
CASING 5 1/2"
CBU, PROD. CEMENTING 5 1/2"
N/D BOP. N/U WH
RIG DOWN

5255
5255
5255
5255
5255
5255
5255
5255
5255
5255
2400
4400
4400
4400
4400
5400
5400
5400
5400
5818
5818
5818
5818
5818
5818
5818
5818
5818
5818

265

10

0
2000

30
30
0
0
0
20
0
0
0
10

1000

418

26.5
8.0
36.0
8.0
12.0
66.7
6.0
6.0
50.0
6.0
6.0
41.8
8.0
48.0
8.0
12.0
12.0
2.0
8.0
10.0

540.8
540.8
548.8
584.8
592.8
604.8
604.8
604.8
604.8
604.8
604.8
671.5
671.5
677.5
683.5
733.5
733.5
739.5
745.5
725.3
725.3
733.3
781.3
789.3
801.3
813.3
815.3
823.3
833.3

PROGRAM
TOTAL
DAYS
0
0
0.21
0
0.06
0
0.25
1
0.13
1
0.33
1
0.33
1
0.04
1
0.63
2
0.08
2
0.08
2
0.63
3
0.17
3
0.50
3
0.13
4
0.50
4
0.17
4
1.77
6
0.33
6
0.50
7
0.33
7
0.33
8
0.63
8
0.08
8
0.50
9
0.25
9
2.92
12
12
0.33
12
0.25
12
1.04
14
14
0.50
14
2.00
16
0.42
16
1.00
17
17
17
17
17
17
3.60
21
21
0.21
21
0.21
21

DAYS

DAYS

HRS SCALE

Hole
26"

17-1/2" hole

1.35
0.63

1
15

0.1
1.0
12-1/4" hole

0.63

15

1.0

1.46
1.77

35
43

2.3
2.8

2.96
2.92

71
70

4.7
4.7

8.5" hole

1.10
0.33
1.50
0.33
0.50
2.78
0.25
0.25
2.08
0.25
0.25
1.74
0.33
2.00
0.33
0.50
0.50
0.08
0.33
0.42

23
23
23
24
25
25
25
25
25
25
25
28
28
28
28
31
31
31
31
33
33
33
35
35
36
36
37
37
37

#REF!

Spud in

Drilling 26" hole to 170'

POOH, L/D, dropped survey, set csg 20", repairing stinger and other equipments, waiting top plug, cmntg, WOC, 21-1/

Drilled 8-1/2" to 655


Circl'd to clean hole & POOH
Enlarger 17 1/2" from 170 to 655
Circl'd to clean hole & POOH,

Drilled 12-1/4" with RB IADC 117M, TSK or eq. (DOC)


PIT&circl'd to clean hole

Drilled 12-1/4" with RB IADC 117M, TSK or eq.


Circl'd&mud conditioning/increased MW, POOH to replace bit w/ higher degree (137M)

Drilled 12-1/4" with RB IADC 137M


Circl'd to clean hole, POOH to replace bit w/ new one, installed wear bushing

Drilled 8-1/2" with RB IADC 137M


POOH, and change bit

Drilled 8-1/2" with PDC bit (DOC)


Circl'd to clean hole, PIT (EMW=16.7 ppg)

Drilled 8-1/2" PDC (new formation)


POOH, multishot surveys by MEDCO Jasatama&installed module+test top drive

Drilled 8-1/2" with PDC


Circl'd to clean hole, POOH to install monel, RIH

Drilled 8-1/2" with PDC


Checked & serviced top drive

Drilled 8-1/2" with PDC


POOH to 6119' & checked for oil leaking on top drive

Drilled 8-1/2" with PDC


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC


Drilled 8-1/2" with PDC (ST kedua)
Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey
Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC (ST kedua)


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC (ST kedua)


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC (ST kedua)


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC (ST kedua)


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

POOH to 6119' & checked for oil leaking on top drive

Drilled 8-1/2" with PDC


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC (ST kedua)


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC (ST kedua)


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC (ST kedua)


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Drilled 8-1/2" with PDC (ST kedua)


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey
POOH to 6119' & checked for oil leaking on top drive

Drilled 8-1/2" with PDC


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Actual
Start (ft)

Target Depth
MD (ft)
TVD (ft)

0
0

0
170

Hour

Day

0
5.5
27.5
5.5
3.5
8.5
41.0
23.5
76.0
10.0
14
3.5
9.5
20
8
16
2
5
14
10.5
32.5
22.5
11.5
6
65

170

170

170
170

655
170

170
655

2693
2693
2899
2899
3850
3850
4288
4288
4382
4382
4486
4486
4694
4694
4740
2358
2358

655
655
2330
2330
2693
2693
2899
2899
3850
3850
4288
4288
4382
4382
4486
4486
4694
4694
4740
4740
2358
4106

4106
4106
5043
5043
5155
2434
2434
4437
4437
4543
4543

4106
5043
5043
5155
5155
2434
4437
4437
4543
4543
5157

10.5
37.5
13.5
11.5
47.5

5157
5157
5467
5467

5157
5467
5467
5677

18
18.5
17.5
19.5

5677

5677

185.5

655
2330

2330

47

57
4
4
13
23

0
0
1
2
2
2
4
5
8
8
9
9
10
10
11
11
11
12
12
13
14
15
15
16
18
18
20
21
22
23
23
25
25
28
28
28
29
30
30
31
32
33
40

18
18.5
17.5
19.5

0
0
5467
5467

0
5467
5467
5677

5677

5677

17.5

5677
5467
5467

5467
5467
5677

18.5
17.5
19.5

5677

5677

17.5

1
2
2
3
4
5
5
6
7

PT EXSPAN NUSANTARA
EAST JATA#1
RIG TIME DISTRIBUTION
TIME
(HOURS)
I

MOVE
1 MOVING
2 MOORING

0.00
0.00

n/a
0.00%

0.00

0.00

0.00%

353.5
8.5
225
46.5
57
0.00
46
0.00
0.00
0.00
37.5
9.5

14.73
0.35
9.38
1.94
2.38
0.00
1.92
0.00
0.00
0.00
1.56
0.40

36.75%
0.88%
23.39%
4.83%
5.93%
0.00%
4.78%
0.00%
0.00%
0.00%
3.90%
0.99%

783.5

32.65

81.44%

0.00
51
0.00
0.00

0.00
2.13
0.00
0.00

0.00%
5.30%
0.00%
0.00%

51.00

2.13

5.30%

60.50
0.00
0.00
0.00
0.00
27.00
0.00
33.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.50

2.52
0.00
0.00
0.00
0.00
1.13
0.00
1.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.27

6.29%
0.00%
0.00%
0.00%
0.00%
2.81%
0.00%
3.48%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.68%

SUBTOTAL

127.50

5.31

13.25%

DRY HOLE TOTAL

962.00

40.08

100%

0.00
0.00

0.00
0.00

0.00

0.00

DRILLING OPERATIONS
3 DRILLING
4 HOLE ENLARGING
5 TRIPS
6 CASING AND CEMENTING
7 WOC
8 ABN PRESSURE DETECTION
9 ROUTINE CIRC AND COND
10 SURVEY
11 PLUG AND ABANDON
12 EQUIP. REMOVAL/SALVAGE
13 SUBSEA/WELLHEAD EQUIP & BOP ACTIVITIES
14 OTHER PRODUCTIVE TIME
SUBTOTAL

III FORMATION EVALUATION


15 CORING
16 LOGGING
17 CIRCULATING SAMPLES
18 OTHER PRODUCTIVE F.E
SUBTOTAL
IV

PERCENTAGE
OF TOTAL

0.00
0.00

SUBTOTAL
II

TIME
(DAYS)

NON-PRODUCTIVE
19 RIG REPAIRS
20 FISHING
21 NOP/S.S. EQUIP REPAIR
22 LOST CIRCULATING
23 WELL CONTROL
24 HOLE INSTABILITY
25 OTHER HOLE/MUD PROBLEM
26 FORMATION EVALUATION
27 MOORING/ASK
28 ENVIRONMENT
29 ANCILLARY CONTR REPAIR
30 CASING AND WELLHEAD
31 DRILL STRING
32 ABANDONMENT SALVAGE
33 UNFORSEEN EVENTS
34 OTHER WAITING
35 OTHER NPT

PRODUCTION TESTING
36 PRODUCTION TESTING
37 PRODUCTION TESTING NPT
SUBTOTAL
WELL TOTAL

Note : MOVING time is exluded from totals and percentages

MUD REPORT EAST JATA#1


BENTONITE
BARITE
CAUSTIC SODA
S. BICARBONAT
DD
PIPE LAX
BORETROL
REDICOAT
POLYSPERSE
SPACRYL
INRAPASEAL
NUTPLUG
FIBERTEX
MICATEX

8.66
5.75
36.3
7.48
0.59
61
71.09
86.75

5-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

170

8.9

0.46

50

Material

Gel

Bar

CS

30

Cost

PV

YP

Gel

pH

FL

Cake Alk,mud Salt

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00

0.00

0.00

259.80

0.00

72.60

0.00

0.00

0.00

0.00

0.00

0.00

6-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

170

8.9

0.46

50

Material

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

Cost

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

655

9.2

0.48

45

14

9/19

10

1.2

320

655

9.6

0.50

49

17

11/20

1.2

320

Material

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00

0.00

0.00

0.00

Cake Alk,mud Salt

Cake Alk,mud Salt

Cost

0.00

0.00

#####

29.92

0.00

0.00

8-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

655

9.3

0.48

40

7/10

10

11

##### 0.00

Cake Alk,mud Salt


1

1.4

320

Material

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

Cost

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

661

9.6

0.50

45

14

10/19

10

1.2

320

1629

9.8

0.51

49

19

12/24

1.2

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Material

30

Cost
10-Sep-02
Depth (ft)
Depth (ft)
Material
Cost
11-Sep-02
Depth (ft)
Depth (ft)
Material

Cake Alk,mud Salt

259.80

0.00

#####

59.84

0.00

0.00

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

2330

9.8

0.51

46

17

11/26

9.5

1.5

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

30

40

##### ##### 0.00

0.00

0.00

0.00

259.80

230.00 72.60

0.00

0.00

0.00

Cake Alk,mud Salt

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

2330

9.8

0.51

40

10

8/9

9.5

10

1.3

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00 ##### 0.00

0.00

0.00

0.00

Cake Alk,mud Salt

Cake Alk,mud Salt

Cost

51.96

0.00

0.00

0.00

0.00

0.00

12-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

2330

9.6

0.50

44

13

10/21

10

1.3

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00

0.00

0.00

0.00

Material

Cost
13-Sep-02
Depth (ft)
Material
Cost
14-Sep-02
Depth (ft)
Depth (ft)

0.00

0.00

0.00

59.84

0.00

0.00

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

2340

9.6

0.50

45

16

10/22

10

1.2

320

2631

9.8

0.51

57

11

21

14/30

9.5

1.2

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

60

60

##### ##### 0.00

0.00

0.00

0.00

519.60

345.00 #####

##### 0.00

0.00

0.00

0.00

PV

YP

Gel

pH

FL

Cake Alk,mud Salt

Prop

MW

grad

Visc

2700

9.6

0.50

48

15

10/21

9.5

1.3

320

2899

9.8

0.51

52

10

19

14/24

9.5

1.2

320

Cake Alk,mud Salt

Material

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Cost

0.00

0.00

72.60

0.00

0.00

0.00

15-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

3319

9.8

0.51

46

16

12/20

9.5

1.2

320

3819

10

0.52

53

11

24

14/26

9.5

1.3

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Material

Cake Alk,mud Salt

Cost

0.00

0.00

72.60

0.00

0.00

0.00

16-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

3986

10

0.52

51

10

19

14/24

9.5

1.3

320

4287

9.8

0.51

46

17

11/21

9.5

1.2

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Material

Cake Alk,mud Salt

Cost

0.00

0.00

#####

0.00

0.00

0.00

17-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

4382

9.8

0.51

45

19

10/21

9.5

1.3

320

4406

9.9

0.51

48

10

17

12/25

9.5

1.3

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Material

Cake Alk,mud Salt

Cost

0.00

0.00

72.60

0.00

0.00

0.00

18-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

4486

10.1

0.53

45

10

19

12/26

9.5

1.3

320

4486

10.1

0.53

49

20

11/26

9.5

1.3

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Material

Cake Alk,mud Salt

Cost

0.00

0.00

0.00

0.00

0.00

0.00

19-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

4486

9.8

0.51

48

16

11/20

9.5

1.2

320

4590

10

0.52

45

17

10/22

9.5

1.4

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00

0.00

0.00

0.00

Material

30

Cost
20-Sep-02
Depth (ft)
Depth (ft)

Cake Alk,mud Salt

259.80

0.00

72.60

0.00

0.00

0.00

##### 0.00

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

4667

10

0.52

50

11

20

13/21

9.5

1.3

320

4694

9.9

0.51

47

19

12/22

9.5

1.3

320

Cake Alk,mud Salt

Material

Gel

Bar

CS

SB

DD

BT

100

RC

PS

SPC

INR

NP

FBTX

0.00

0.00

0.00

0.00

Cost

0.00

0.00

36.30

0.00

59.00

0.00

21-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

4740

10

0.52

46

10

18

13/21

9.5

1.3

320

4740

10

0.52

50

12

18

12/26

9.5

1.3

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00

0.00

0.00

Material

##### 86.75

Cake Alk,mud Salt

Cost

0.00

0.00

72.60

0.00

0.00

0.00

71.09

0.00

0.00

22-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

4740

10

0.52

40

10

9/11

9.5

10

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00

0.00

0.00

Material

Cake Alk,mud Salt

Cost

0.00

0.00

0.00

0.00

0.00

0.00

0.00

86.75

0.00

23-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

1996

9.7

0.50

45

15

10/21

10.5

10

1.1

320

2294

9.5

0.49

40

13

10/6

10

11

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00 ##### 0.00

0.00

0.00

0.00

Cake Alk,mud Salt

Material

10

Cost

0.00

0.00

0.00

74.80

0.00

0.00

24-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

2791

9.4

0.49

44

14

3324

9.6

0.50

48

10

17

Gel

Bar

CS

SB

DD

BT

Material

90

Cake Alk,mud Salt

10

pH

FL

10/18

10

1.1

320

12/22

9.5

1.1

320

RC

PS

SPC

INR

NP

FBTX

0.00

0.00

0.00

0.00

Cost

0.00

517.50

0.00

74.80

0.00

0.00

25-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

3782

9.8

0.51

46

17

11/26

9.5

1.1

320

4087

10.1

0.53

54

11

24

13/29

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

60

##### ##### 0.00

0.00

0.00

0.00

Material
Cost

0.00

26-Sep-02
Depth (ft)
Depth (ft)

Prop

345.00 #####

0.00

0.00

0.00

##### 0.00

Cake Alk,mud Salt

MW

grad

Visc

PV

YP

Gel

pH

FL

Cake Alk,mud Salt

4106

9.7

0.50

46

10

21

13/28

9.5

1.1

320

4483

10.1

0.53

54

10

24

11/29

9.5

1.1

320

Material

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Cost

0.00

0.00

72.60

0.00

0.00

0.00

27-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

4793

9.9

0.51

54

12

20

14/24

9.5

1.1

320

5033

10

0.52

46

17

11/23

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Material

30

Cost
28-Sep-02
Depth (ft)
Depth (ft)
Material

Cake Alk,mud Salt

259.80

0.00

72.60

0.00

0.00

0.00

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5064

10.2

0.53

51

12

22

14/24

9.5

1.1

320

5138

10

0.52

45

17

11/22

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Cake Alk,mud Salt

Cost

0.00

0.00

72.60

0.00

0.00

0.00

29-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5155

10.1

0.53

46

18

11/26

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

71.09 ##### 0.00

0.00

0.00

0.00

Material

Cake Alk,mud Salt

Cost

0.00

0.00

0.00

0.00

0.00

0.00

30-Sep-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5155

10.1

0.53

40

10

9/14

10

11

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00 ##### 0.00

0.00

0.00

0.00

Cake Alk,mud Salt

Material

Cake Alk,mud Salt

Cost

0.00

0.00

0.00

0.00

0.00

0.00

1-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

2783

9.7

0.50

44

15

10/18

10

1.1

320

3319

10

0.52

49

10

19

12/27

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Material

30

Cost
2-Oct-02
Depth (ft)
Depth (ft)

259.80

0.00

72.60

0.00

0.00

0.00

Prop

MW

grad

Visc

PV

YP

Gel

3856

9.7

0.50

48

16

4239

9.9

0.51

52

11

19

pH

FL

Cake Alk,mud Salt

10/19

10

1.1

320

12/22

9.5

1.1

320

Material

Gel

Bar

30

Cost
3-Oct-02
Depth (ft)
Depth (ft)
Material

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

259.80

0.00

#####

0.00

0.00

0.00

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

4438

9.8

0.51

48

16

10/21

9.5

1.1

320

4543

9.8

0.51

50

17

11/26

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Cake Alk,mud Salt

Cost

0.00

0.00

#####

0.00

0.00

0.00

4-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

4710

10

0.52

52

11

20

13/29

9.5

1.1

320

4963

9.9

0.51

48

17

11/24

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Material

100

Cake Alk,mud Salt

Cost

0.00

0.00

0.00

0.00

59.00

0.00

5-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5157

9.9

0.51

49

10

18

12/26

9.5

1.1

320

5157

9.8

0.51

48

17

11/24

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Material

100

Cake Alk,mud Salt

Cost

0.00

0.00

0.00

0.00

59.00

0.00

6-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5311

10.1

0.53

48

10

18

12/21

9.5

1.1

320

5467

9.9

0.51

51

20

11/24

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Material

Cake Alk,mud Salt

Cost

0.00

0.00

#####

0.00

0.00

0.00

7-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5467

10

0.52

45

18

10/24

9.5

1.1

320

5615

10.1

0.53

50

11

19

12/26

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00

0.00

0.00

0.00

Material

Cake Alk,mud Salt

Cost

0.00

0.00

#####

0.00

0.00

0.00

8-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5677

10.1

0.53

44

15

10/16

9.5

1.1

320

5677

10.1

0.53

50

10

19

12/23

9.5

1.1

320

##### 0.00

Cake Alk,mud Salt

Material

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

##### ##### 0.00

0.00

0.00

0.00

Cost

0.00

0.00

#####

0.00

0.00

0.00

9-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5677

9.9

0.51

48

20

11/25

9.5

6.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

1
0.00

0.00

0.00

0.00

Material

Cake Alk,mud Salt

Cost

0.00

0.00

0.00

0.00

0.00

0.00

10-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5677

9.9

0.51

45

10

18

13/21

9.5

9.5

1.1

320

Material

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

Cost

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5677

9.9

0.51

44

17

10/19

9.5

1.1

320

Material

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

Cost

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5677

9.9

0.51

44

17

10/19

9.5

1.1

320

5677

10.2

0.53

55

11

23

13/29

9.5

1.1

320

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

60

0.00

0.00

0.00

0.00

Material
Cost

0.00

13-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

5677
Gel

Material

345.00 #####

14-Oct-02
Depth (ft)
Depth (ft)

Cake Alk,mud Salt

Cake Alk,mud Salt

Cake Alk,mud Salt

3
0.00

0.00

0.00

grad

Visc

PV

YP

Gel

pH

FL

10.2

0.53

55

11

23

13/29

9.5

1.1

320

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

0.00

0.00

0.00

0.00

30

Cost

##### 86.75

##### 0.00

Cake Alk,mud Salt

259.80

0.00

#####

0.00

0.00

0.00

##### 0.00

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

5677

10

0.52

41

11

23

13/29

9.5

Cake Alk,mud Salt


1

1.1

320

Material

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

Cost

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15-Oct-02
Depth (ft)
Depth (ft)

Prop

MW

grad

Visc

PV

YP

Gel

pH

FL

Material

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

Cost

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

Gel

Bar

CS

SB

DD

BT

RC

PS

SPC

INR

NP

FBTX

306

310

73

40

300

138

67

1.6

1.7

0.1

0.05

0.0

0.7

0.4

%ppb

Cake Alk,mud Salt

Calc

Sand

MC

Total

Solids

WC

Vol

Cost/

(bbls)
0.00

332.40

352

bbls
0.944

Calc

Sand

Solids

WC

MC

Total

Vol

Cost/

0.00

0.00

418

Calc

Sand

Solids

WC

160

0.15

93

120

0.25

91

MC

Total

(bbls)

Vol
(bbls)

bbls
0

Cost/

0.00

423.18

349

bbls
1.213

Calc

Sand

Solids

WC

160

0.1

94

MC

Total

Vol
(bbls)

Cost/
bbls
0

0.00

0.00

359

Calc

Sand

Solids

WC

160

0.15

10

90

120

0.25

11

89

MC

Total

Vol
(bbls)

Cost/

0.00

1309.47

349

bbls
3.752

Calc

Sand

Solids

WC

100

0.25

10

90

MC

Total

Vol
(bbls)

Cost/

0.00

1122.67

492

bbls
2.282

Calc

Sand

Solids

WC

180

0.1

92

MC

Total

Vol
(bbls)

Cost/
bbls

0.00

225.46

500

0.451

Calc

Sand

Solids

WC

120

0.1

92

MC

Total

Vol
(bbls)

Cost/

0.00

202.02

485

bbls
0.417

Calc

Sand

Solids

WC

180

0.1

91

120

0.2

10

90

MC

Total

Vol
(bbls)

Cost/

0.00

1788.32

452

bbls
3.956

Calc

Sand

Solids

WC

160

0.25

10

90

140

0.25

11

89

MC

Total

Vol
(bbls)

Cost/

0.00

530.46

392

bbls
1.353

Calc

Sand

Solids

WC

120

0.25

11

89

120

0.25

13

87

MC

Total

Vol

Cost/

(bbls)
0.00

530.46

402

bbls
1.32

Calc

Sand

Solids

WC

120

0.25

12

88

120

0.25

10

90

MC

Total

Vol
(bbls)

Cost/

0.00

887.42

521

bbls
1.703

Calc

Sand

Solids

WC

120

0.25

10

90

120

0.25

12

88

MC

Total

Vol
(bbls)

Cost/
bbls

0.00

530.46

447

1.187

Calc

Sand

Solids

WC

120

0.25

12

88

120

0.25

12

88

MC

Total

Vol
(bbls)

Cost/

0.00

528.95

472

bbls
1.121

Calc

Sand

Solids

WC

120

0.25

11

89

120

0.25

13

87

MC

Total

Vol
(bbls)

Cost/

0.00

901.12

483

bbls
1.866

Calc

Sand

Solids

WC

120

0.2

13

87

120

0.25

11

89

MC

Total

Vol
(bbls)

Cost/

0.00

537.50

500

bbls
1.075

Calc

Sand

Solids

WC

120

0.25

13

87

120

0.25

13

87

MC

Total

Vol
(bbls)

Cost/

0.00

143.69

506

bbls
0.284

Calc

Sand

Solids

WC

120

0.25

12

88

MC

Total

Vol
(bbls)

Cost/

0.00

86.75

506

bbls
0.171

Calc

Sand

Solids

WC

180

0.2

91

200

0.25

10

90

MC

Total

Vol
(bbls)

Cost/
bbls

0.00

248.30

506

0.491

Calc

Sand

Solids

WC

100

0.2

91

120

0.2

11

89

MC

Total

Vol
(bbls)

Cost/

0.00

876.66

506

bbls
1.733

Calc

Sand

Solids

WC

100

0.25

10

90

120

0.25

13

87

MC

Total

Vol
(bbls)

Cost/

0.00

1090.24

506

bbls
2.155

Calc

Sand

Solids

WC

100

0.25

11

89

100

0.25

14

86

MC

Total

Vol

Cost/

(bbls)
0.00

814.82

506

bbls
1.61

Calc

Sand

Solids

WC

120

0.25

10

90

140

0.25

13

87

MC

Total

Vol
(bbls)

Cost/

0.00

1137.26

506

bbls
2.248

Calc

Sand

Solids

WC

100

0.25

14

86

140

0.25

11

89

MC

Total

Vol
(bbls)

Cost/

0.00

735.28

506

bbls
1.453

Calc

Sand

Solids

WC

120

0.25

12

88

MC

Total

Vol
(bbls)

Cost/
bbls

0.00

244.59

506

0.483

Calc

Sand

Solids

WC

120

0.2

13

87

MC

Total

Vol
(bbls)

Cost/

0.00

173.50

506

bbls
0.343

Calc

Sand

Solids

WC

160

0.2

10

90

140

0.25

12

88

MC

Total

Vol
(bbls)

Cost/

0.00

861.35

506

bbls
1.702

Calc

Sand

Solids

WC

160

0.2

10

90

120

0.25

12

88

MC

Total

Vol
(bbls)

Cost/

0.00

1214.84

506

bbls
2.401

Calc

Sand

Solids

WC

120

0.25

10

90

100

0.25

11

89

MC

Total

Vol
(bbls)

Cost/

0.00

778.07

506

bbls
1.538

Calc

Sand

Solids

WC

120

0.25

14

86

120

0.25

12

88

MC

Total

Vol
(bbls)

Cost/

0.00

603.61

506

bbls
1.193

Calc

Sand

Solids

WC

120

0.25

14

86

120

0.25

12

88

MC

Total

Vol
(bbls)

Cost/
bbls

0.00

603.61

506

1.193

Calc

Sand

Solids

WC

100

0.25

14

86

120

0.25

11

89

MC

Total

Vol
(bbls)

Cost/

0.00

745.24

506

bbls
1.473

Calc

Sand

Solids

WC

100

0.25

12

88

100

0.25

14

86

MC

Total

Vol
(bbls)

Cost/

0.00

500.65

506

bbls
0.989

Calc

Sand

Solids

WC

120

0.25

12

88

100

0.25

12

88

MC

Total

Vol

Cost/

(bbls)
0.00

566.76

506

bbls
1.12

Calc

Sand

Solids

WC

120

0.25

12

88

MC

Total

Vol
(bbls)

Cost/

0.00

371.11

506

bbls
0.733

Calc

Sand

Solids

WC

120

0.25

12

88

MC

Total

Vol
(bbls)

Cost/
bbls
0

0.00

0.00

506

Calc

Sand

Solids

WC

100

0.25

12

88

MC

Total

Vol

Cost/

(bbls)

bbls

0.00

0.00

506

Calc

Sand

Solids

WC

100

0.25

12

88

100

0.25

14

86

MC

Total

Vol

Cost/

(bbls)
0.00

703.47

506

bbls
1.39

Calc

Sand

Solids

WC

100

0.25

14

86

MC

Total

Vol
(bbls)

Cost/

0.00

831.54

506

bbls
1.643

Calc

Sand

Solids

WC

100

0.25

14

86

MC

Total

Vol
(bbls)

Cost/
bbls
0

0.00

0.00

506

Calc

Sand

Solids

WC

MC

Total

Vol

Cost/

(bbls)
0.00

0.00

506

bbls
0

MC

Total

Vol

Cost/

####### ###### 1.25

DEPTH
1

SPUD IN
DRILL HOLE 26"

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
29
30
31
32
33
34
35
36
37
38

TRIP OUT 26"


CASING 20"
CEMENTING 20" CSG
WOC
N/U 20" DIVERTER 2000 WP
TRIP IN 8-1/2" BIT TO TOC
DRILL Pilot 8-1/2" HOLE
CBU, TRIP OUT 8-1/2" BIT
TRIP IN 17-1/2" BIT TO TOC
DRILL 17-1/2" HOLE
CBU, TRIP OUT 17-1/2" BIT
CASING 13-3/8"
CEMENTING 13-3/8" CSG
N/U BOP STACK
TRIP IN 12-1/4" BIT
DRILL - I HOLE 12-1/4"
CBU, WIPER TRIP & TRIP OUT 12-1/4" BIT
INTERMEDIATE LOGGING
TRIP IN TO WIPER TRIP, CBU
TRIP OUT 12-1/4" BIT
CASING 9-5/8" CSG
CBU, CEMENTING 9-5/8"
N/U WH & BOP STACK
TRIP IN 8-1/2"
DRILL - I HOLE 8-1/2" >>>
HOLE PROBLEM
CBU, TRIP OUT TO CHANGE BIT
TRIP IN 8-1/2" BIT
DRILL - II HOLE 8-1/2" >>>
PLUG BACK JOB, WOC
CBU, TRIP OUT & WIPER TRIP
PRODUCTION LOGGING
TRIP IN 8-1/2" BIT TO WIPER TRIP
L/D STRING
CASING 5 1/2"
CBU, PROD. CEMENTING 5 1/2"
N/D BOP. N/U WH
RIG DOWN

0
150
150
150
150
150
150
150
600
150
150
600
600
600
600
600
600
2300
2300
2300
2300
2300
2300
2300
2300
2300
4486
4486
4486
4486
4686
4686
4686
4686
4686
4686
4686
4686
4686
4686

150

450

450

1700

2186

200

ROP
FPH
0
30
0
0
0
0
0
0
30
0
0
30
0
0
0
0
0
40
0
0
0
0
0
0
0
0
30
0
0
0
10

HOUR
0
5.0
1.5
6.0
3.0
8.0
8.0
1.0
15.0
2.0
2.0
15.0
4.0
12.0
3.0
12.0
4.0
42.5
8.0
12.0
8.0
8.0
15.0
2.0
12.0
6.0
72.9
8.0
6.0
20.0
24.0
12.0
36.0
12.0
12.0
24.0
3.0
12.0
8.0

TOTAL
HOUR
0
5.0
6.5
12.5
15.5
23.5
31.5
32.5
47.5
49.5
51.5
66.5
70.5
82.5
85.5
97.5
101.5
144.0
152.0
164.0
172.0
180.0
195.0
197.0
209.0
215.0
287.9
287.9
295.9
301.9
321.9
345.9
357.9
393.9
405.9
417.9
441.9
444.9
456.9
464.9

PROGRAM
TOTAL
DAYS
0
0
0.21
0
0.06
0
0.25
1
0.13
1
0.33
1
0.33
1
0.04
1
0.63
2
0.08
2
0.08
2
0.63
3
0.17
3
0.50
3
0.13
4
0.50
4
0.17
4
1.77
6
0.33
6
0.50
7
0.33
7
0.33
8
0.63
8
0.08
8
0.50
9
0.25
9
3.04
12
12
0.33
12
0.25
13
0.83
13
1.00
14
0.50
15
1.50
16
0.50
17
0.50
17
1.00
18
0.13
19
0.50
19
0.33
19

DAYS

CONTROL >>

DAYS

HRS SCALE

Hole
26"

17-1/2" hole

1.35
0.63

1
15

0.1
1.0
12-1/4" hole

0.63

15

1.0

1.46
1.77

35
43

2.3
2.8

2.96
3.04

71
73

4.7
4.9

15.8

252.4

16.8

8.5" hole

#REF!

Spud in

Drilling 26" hole to 170'

POOH, L/D, dropped survey, set csg 20", repairing stinger and other equipments, waiting top plug, cmntg, WOC, 21-1/

Drilled 8-1/2" to 655


Circl'd to clean hole & POOH
Enlarger 17 1/2" from 170 to 655
Circl'd to clean hole & POOH,

Drilled 12-1/4" with RB IADC 117M, TSK or eq. (DOC)


PIT&circl'd to clean hole

Drilled 12-1/4" with RB IADC 117M, TSK or eq.


Circl'd&mud conditioning/increased MW, POOH to replace bit w/ higher degree (137M)

Drilled 12-1/4" with RB IADC 137M


Circl'd to clean hole, POOH to replace bit w/ new one, installed wear bushing

Drilled 8-1/2" with RB IADC 137M


POOH, and change bit

Drilled 8-1/2" with PDC bit (DOC)


Circl'd to clean hole, PIT (EMW=16.7 ppg)

Drilled 8-1/2" PDC (new formation)


POOH, multishot surveys by MEDCO Jasatama&installed module+test top drive

Drilled 8-1/2" with PDC


Circl'd to clean hole, POOH to install monel, RIH

Drilled 8-1/2" with PDC


Checked & serviced top drive

Drilled 8-1/2" with PDC


POOH to 6119' & checked for oil leaking on top drive

Drilled 8-1/2" with PDC


Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey

Actual
Start (ft)

Target Depth
MD (ft)
TVD (ft)

0
0

0
170

170

170

170
170

655
170

170
655

655
655
2330
2330
2693
2693
2899
2899
3850
3850
4288
4288
4382
4382
4486
4486

655
2330

2330
2693
2693
2899
2899
3850
3850
4288
4288
4382
4382
4486

Hour

0
5.5
27.5
5.5
3.5
8.5
41.0
23.5
76.0
10.0
14
3.5
9.5
20
8
16
2
5
14
10.5
17.5

Day

0
0
1
2
2
2
4
5
8
8
9
9
10
10
11
11
11
12
12
13
13
13
13
13
13
13
13

You might also like