Well
Name
East Jata#1
East Jata#1 ST
East Jata#1 ST2
42 ft
AFE
NUMBER
X
X
X
Surface Coordinate
Target Coordinate
BRF
X, ME
379838.442
379838.442
379838.442
Y, MN
9683091.877
9683091.887
9683091.887
X, ME
379940.900
379778.030
380193.000
Y, MN
9683040.000
9682656.270
9683586.000
(ft TVD)
4355
4460
4392
BUR
KOP
(ft MD/TVD)
2700.00
2400.00
2400.00
Azimuth
(deg.)
116.85
187.90
35.66
Inclination
(degree)
15.03
44.34
59.55
EOC
(ft MD)
3201
3508
3889
North/South
(ft)
-170.20
-1429.19
1621.11
East/West
(ft)
336.15
-198.20
1163.25
East Jata#1
East Jata#1 ST
East Jata#1 ST2
3.00
4.00
4.00
D = Square Root of
CoordinateX)^2 + (T
2 * 3.14 * r / 360 =
Example :
A = 15.031
MDEOB = 3201.03
TVDEOB = 3195.55
sin A =
0.259
cos A =
E=
0.777
65.377
KOP = 2700.00
TVD of TD =
4575.00
MDX = 2400.00
MDTD = 4629.81
or
TVDx = 2300.00
Thus,
Thus,
r=
TVD of EOB =
B=
MDX =
G=
1910.83
3195.55
1379.45
G / B * (MDTD - MDEOB) + MDEOB
-773.37
r = 1910.83
TVD of EOB = 3195.55
B = 1379.45
G = -895.55
MDX = 2273.45
TVDx = 2422.18
Example :
A=
MDEOB =
TVDEOB =
KOP =
TVD of TD =
44.338
3508.46
3401.60
2400.00
4650.00
MDX = 5507.05
sin A =
cos A =
E=
0.699
0.715
408.116
TVDx = 4830.00
or
MDTD = 5255.20
Thus,
Thus,
r=
TVD of EOB =
B=
MDX =
G=
1433.12
3401.60
1248.40
G / B * (MDTD - MDEOB) + MDEOB
1428.40
TVDx = 4830.00
r = 1433.12
TVD of EOB = 3401.60
B = 1248.40
G = 1428.40
MDX = 5507.05
BRF
Basement
Total Depth
(SS ft)
-4313
-4418
-4350
(ft TVD)
4475
4520
4462
(SS ft)
-4433
-4478
-4420
(ft TVD)
4575
4650
4612
(SS ft)
-4533
-4608
-4570
Ver. Sect.
(ft)
377
1443
1995
X2
(ft)
65
408
706
BRF
(ft MD)
4402
4990
5384
Basement
(ft MD)
4526
5073
5522
Total Depth
(ft MD)
4630
5255
5818
3281.00
113.15
1915.75
KB
Well
Name
Jata-2A
Jata-2B
50 ft
Surface Coordinate
X, ME
Y, MN
X, ME
Y, MN
378407.200 9681817.300 378140.000 9681431.000
378407.200 9681817.300 379136.600 9681235.700
BUR
Jata-2A
Jata-2B
Target Coordinate
3.50
3.50
KOP
Azimuth
(ft MD/TVD)
(deg.)
700.00
700.00
214.67
128.57
North/South East/West
(ft)
(ft)
-1267.39
-1908.14
-876.64
2393.04
Inclination
Baturaja
(ft TVD)
4610
4580
EOC
Basement
X2
(degree)
(ft MD)
(ft)
23.34
1367
1541
134
43.48
1942
3061
449
TD (IF 85 ft MD below Top Basement )
MD
TVD
SS
5126
6055
4800 -4750
4810 -4760
(SS ft)
-4630
-4660
BRF
(ft MD)
4919
5738
Total Depth
(ft TVD)
4800
4810
(SS ft)
Basement
Total
Depth
(ft MD)
5126
6055
(ft MD)
4995
5917
-4750
-4760
PT EXSPAN NUSANTARA
DRILLING PROGRAM (REVISION #1)
AREA :
Loc. No. :
SL
TL1
: X = 379,838.442 ME
Y = 9,683,091.877 MN
: X = 379,940.90 ME
Y = 9,683,040.00 MN
Est. GL Elev.
Est. KB Elev.
Est. TD
:
:
:
EAST JATA#1
Rig
feet
45
feet
4575
feet TVD
4630
feet MD
100' in basement
Est. Cost
Tangible
Intangible
Drilling days
(Directional) ( Wildcat ).
EMSCO
:
:
:
:
599
56
543
17
I. GEOLOGICAL OUTLINE
OBJECTIVE (S) :
BATURAJA FORMATION
Tops for
FORMATION
Est Gradient
Subject Well
Lithology
Jata#1
KB TVD
SS
KB TVD
SS
Baturaja
4355
-4310
4478
-4432
Limestone
Basement
4475
-4430
4524
-4478
Metasediment
TD
4575
-4530
4636
-4590
TOTCO SURVEY AT :
Mud Logger
:
Core`s
Completion test
:
:
pressure @ Top
(psi/ft)
0.43
Electric Logs
Depth Interval
Metasediment
Refer to Jata#1
No abnormal pressure
is suspected
Logging
DPIL-MLL-BHC Acoustic-GR
w/ scale 1:240 & 1:600
ZDL-CNL-GR
SWC, for reservoir analysis
RFT and Star
Velocity Survey
At total depth
Every bit change and casing point.
Gas detector should be run from surface casing to final TD. Take sample every 10' from 9-5/8" casing shoe to TD.
Save one set of dry sample in envelope and one set of wet sample in cloth bag.
No conventional core neither DST's. SWC will be taken as adviced by geologist
Test beds with good hydrocarbon shows through pipe
KOP
EOB
Baturaja
BSMT
TD
2700
2700
MWD
3195
3201
MWD
4355
4402
MWD/MSS
4475
4526
MSS
4575
4630
MSS
REMARK
BUR
Azimuth
Final Angle
=
3
o
= 116.91
o
= 15.03
deg/100 ft @ EOB
@ EOB to TD
20
94
H-40
STC
13 3/8
48
H-40
9 5/8
36
K-55
150
387
BTC
600
BTC
2300
4630
5 1/2" 15.5
J-55
BTC
Note : *) S.F = 1.125, **) S.F = 1.1
REMARKS:
CENTRALIZER
ea
PIT TEST
ppg
NONE
520
1240
215
740
1430
13
503
2020
2944
10
14.2
200
3591*)
4564**)
20
NONE
PT EXSPAN NUSANTARA
DRILLING PROGRAM (REVISION #1)
IV. CEMENTING PROGRAM
CSG SIZE
(INCH)
20"
13 3/8"
9 5/8"
5 1/2"
REMARKS:
HOLE SIZE
TD
(INCH)
(FEET)
26
160
17 1/2"
610
EST. TOC
(FEET)
Surface
SXS
320
Surface
2% CaCl2 + 0.005 gps Dair-2. Grout cement on surface if required, and dump cellar w/ 20 sxs A
cmt + 4% CaCl2 to surface.
Lead: 2% pH Gel + 0.005 gps Dair-2 (30% Excess)
280
G
200
G Tail: 0.005 gps Dair-2
12 1/4"
2310
500
360
G Lead: 2% pH Gel + 0.005 gps Dair-2 (10% Excess)
240
G Tail: 0.005 gps Dair-2
8 1/2"
4630
3300
240
G 0.25 gps H322L+ 0.005 gps Dair-2. (20% Excess)
Plug & Abandon
400
G 0.25 gps H322L+ 0.005 gps Dair-2. (20% Excess)
1.Test lab cement slurry will be conducted by Halliburton and check again with actual water sample from location.
2.The cement consumption in the program above is estimation only, the actual requirement will be decided based on the hole condition and
caliper log data
3. Set TOC behind casing 9-5/8" + 300' above top coal zone.
V. WELLHEAD EQUIPMENT
1.
2.
3.
4.
Casing Head (Section "A") : 13 5/8" x 13 3/8" Flange x 9-5/8" hanger - 3000 psi WP
Casing Spool (Section "B") : 13 5/8" x 11" Flange x 5-1/2" hanger - 3000 psi WP
Tubing Head Spool : 11" x 7 1/16" Flange x 2-7/8" EUE hanger - 3000 psi WP.
X-Mastree - 7 1/16" x 2-9/16" Flange - 3000 psi WP (2-1/16" Master valve + Studded Tee + 2-1/16" Crown valve + 2-1/16" Wing valve)
will be installed upon completion
DEPTH
(FEET)
120
600
2300
BOP STACK
BOP TEST
(PSI)
50 & 200
200 & 1500
200 & 2000
ARRANGEMENT
HYDRIL MSP 2000 PSI
HYDRIL GK + BR + PR RAMS
HYDRIL GK + BR + PR RAMS
REMARKS: 1. Check and ensure all the BOP equipment is in good condition & Pressure test as per SOP. Test all line HCR - Manifold.
2. Flush BOP and diverter line w/ water to clean up immediately.
3. Accumulator unit press 1500 psi and check Nitrogen Bottle.
- 160
- 610
- 2310
- TD
Weight
Vis
WL
PV
YP
pH
(ppg)
(qrt/sec)
(cc/30 m)
(cP)
(lb/100 ft )
Native Mud
9.2 9.4
9.8 10.0
10.1 10.3
45 - 50
45 - 50
50 - 55
<8
8 - 10
8 - 10
8 - 10
8 - 12
10 - 12
8-10
8-10
10 - 12
9.5
9.5
9.5
Solids
(%)
Sand
(max)
8 - 10
8 - 10
8 - 12
0.25 %
0.25 %
0.25 % 262
Overbalance
Remarks
psi
At (ft KB) Beware lost
circ. At BRF
- 309
4575
NOTE: 1. Run Desander and Desilter continously, make sure these equipment are in good working condition.
2. Maintain MW at program level to avoid underballance/well flowing. Conduct drilling control to avoid mud ring & bit balling problems.Reduce ROP
if necessary.
3. Do trip in / out with full precaution to avoid pressure surge and swabbing. Use trip tank to observe fluid level.
4. Circ. Out gas if any until back to BG prior to continue drilling.
5. Increased MW gradually if needed, if the total gas could not be reduced to BG after circulating out gas.
6. Increased MW 0.1- 0.2 ppg prior to POOH to run Logging or run Casing (if no loss circ.). If lost circ' Mix LCM (Nut plug, indorapaseal).
Sweep w/ Hi-Vis mud prior to POOH
7. If hole collapse/sloughing shale occurred, mud weight will be increased up to 10.3 ppg gradually.
(Be ware of possibility differential sticking and lost circulation).
8. Circ. and condition mud to reduce PV & YP prior to cementing.
PT EXSPAN NUSANTARA
DRILLING PROGRAM (REVISION #1)
VIII. BIT AND HYDRAULIC PROGRAM
INTERVAL
(Feet)
HOLE
SIZE
TYPE
IADC
WOB
K lbs
NOZZLE
(1/32)
RPM
PRESS
(psi)
RATE
(GPM)
A.V
fpm
PUMP
make
LINER
SIZE
INCHI
DB-550
GD-FXN
6"
6"
jet
61
55
160
26"
111
2-4
3 x 20
60-80
170 - 180
300
11
160
610
8 1/2"
117
5 - 10
3 x 13
100-120
300 - 500
300
141
(pilot)
160
610
17 1/2"
111
10 - 15
610
2310
12 1/4"
117M
12 - 15
2310
4407
4407
TD
8 1/2"
8 1/2"
117M
517
15 - 20
20 - 23
3 x 18
3 x 16
3 x 20
3 x 16
100-120
600 - 800
650
56
100
1100-1300
600
113
100
80-90
1400
1400
400
400
189
189
F2/Eq
STROKE
(spm)
DB-550
6"
GD-FXN
6"
DB-550
6"
50
GD-FXN
6"
55
DB-550
6"
55
GD-FXN
6"
50
55
DB-550
6"
GD-FXN
6"
DB-550
6"
GD-FXN
6"
55
feet MD
26"
0 - 150
BHA DESCRIPTION
26" Bit + 6.5" DC x 2 jts
8 1/2" Bit+ 6 1/2" DC x 8 jts + 5"HWDPx4 jts
REMARKS
Drilling formation
8 1/2"
150 - 610
17 1/2"
150 - 610
12 1/4"
610 - 2310
Drilling formation
8 1/2"
2310 - TD
8 1/2" Bit+ 6 1/2"Motor+6 1/2" Monel+ 6 1/2" DC+5" HWDPx4 jts+6 1/2" DJ+5"HWDPx18jt
Drilling formation
Drilling formation
Enlarge Hole
MD (ft)
0
DAYS
10
1000
1500
2000
Drill 8" Hole, ROP +/- 45.5 ft/hr
2500
Change BHA @ 3152' MD
3000
BRF @
3500
ft MD KB
Basement @
Final TD @
ft MD KB
ft MD KB
4000
4500
DEPTH
0
0
:
:
:
:
Rig
:
Rig Type :
Rig Supt. :
Drill. Eng.:
Emsco
Land
Dasri H
Gustioro
AFE No.
Vert - Dir - Hor
Distance
Geologist
:
:
:
:
02-0743-X
Directional
5.0km (Matra #3)
Erham
Sumarno
TG
(unit)
4375
4486
28
10
5035
5155
13
10
5446
5567
5677
17
10
10
ELECTRICAL LOG
DIFL-BHC-GR ; CNL-ZDL-GR
Velocity Survey
DIFL-BHC-GR ; CNL-ZDL-GR
CEMENT SYSTEM
SPACER
TT COMP. S.
(hrs)
(psi)
fresh water 4
nc
fresh water
nc
fresh water
nc
fresh water 3 : 14
fresh water 3 : 14
fresh water 3 : 14
nc
nc
nc
Page 12
MUD RECORD
DEPTH WEIGHT FUNN VISC PV
YP
GELS
2
2
(feet)
ppg
second
CP lb/100 ft lb/100 ft
0
8.6 - 8.8
665
9.4 - 9.6
40-45
9-10 18-20
11/23
2340
9.6-9.9
48-50
12-14 18-20
14/32
TD
10.0-10.2
50-55
12-14 18-20
12/25
pH WTR LOSS FC
SAND SOLID CHLOR. CALC.
ml/30 min 32nd in % by vol.% by vol. % by vol. % by vol.
Native Mud
9.5
9
1
0.15
8
100
9.5
7
1
0.15
9
100
9.5
6
1
0.25
9
120
MUD
TYPE
Spud
PHPA
PHPA
PHPA
MAKE
HTC
TSK
REED
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
CS
sx
DD
ltr
SB
sx
306
73
300
40
310
67
NP
sx
FT
sx
CEMENT ADDITIVE
INRA PL CaCl2 HR6L H322 DAIR
sx
ltr
sx
gln gln gln
-
15
REMARKS
Spud in & Drill
Pilot hole
DO. Cmt, Drill & Circ.
DO. Cmt, Drill & Circ.
DO. Cmt, PIT & Drill
15.5 354
46
15.5
31
37.5
51
27
9.5
120'
800'
1800'
4200'
PREPARED BY : Gustioro
REMARKS
based on daily rig report and
well sitting drill. eng. record
1814'
4195'
51'
814'
APPROVED BY :
Page 13
9/22/2013
Days vs Depth
East Jata#1 (DRY HOLE BASIS)
Time (Days)
0
26" hole
10
15
20
25
30
2000
9.8 - 10.0 ppg
Run Log 1
9-5/8" csg at 2300 ft
SIDETRACK TO N 187 E
SIDETRACK TO N 35.6 E
KOP @ 2400
Depth FT (MD)
KOP @ 2400
3000
8 " hole
8 " hole
4000
8 " hole
5000
TD @ 4740' MD/4680'TVD
6000
7000
Program
Actual
35
40
DAYS
DEPTH
26" Section
5-Sep-02
0
0.4
0
170
5.5
1.5
6-Sep-02
1.4
17-1/2" Section
7-Sep-02
2.4
8-Sep-02
3.4
12-1/4" Section
9-Sep-02
4.4
10-Sep-02
5.4
11-Sep-02
6.4
12-Sep-02
7.4
13-Sep-02
8.4
14-Sep-02
9.4
15-Sep-02
10.4
16-Sep-02
11.4
17-Sep-02
12.4
18-Sep-02
13.4
19-Sep-02
14.4
20-Sep-02
15.4
21-Sep-02
16.4
22-Sep-02
17.4
23-Sep-02
18.4
24-Sep-02
19.4
25-Sep-02
20.4
26-Sep-02
21.4
27-Sep-02
22.4
28-Sep-02
23.4
29-Sep-02
24.4
170
1.5
6.5 0.5
1753
2330
2330
2330
2693
2899
3850
4288
4423
4486
4605
4694
4740
2358
2358
3387
4106
4544
5043
5150
5155
5.5 8.5
1
15
10
2.5
4.5
5.5
11
4 3.5
11
11.5
3.5
1.5
7
7
6 1.5
8.5
2.5 10.5
20
16
9
6.5
10
0.5
4.5
13.5
3.5
4.5
8.5
4.5
1.5
5
10
7
12
7.5
1
24
23
14
23.5
0.5
11
11
0.5
9.5
11
OTHER EVALUATION
CEMENTING
TESTING PRODUCTION
CIRCU / CONDITIONING
EVALUATION
2.5
TRIP EVALUATION
LOGGING
OTHER DRILLING
WOC
DRILLING
PRODUCTIVE TIME
DATE
655
655
CEMENTING
RUNNING CASING
DRILLING
DRILLING TIME
30-Sep-02
1-Oct-02
2-Oct-02
3-Oct-02
4-Oct-02
5-Oct-02
6-Oct-02
7-Oct-02
8-Oct-02
9-Oct-02
10-Oct-02
11-Oct-02
12-Oct-02
13-Oct-02
14-Oct-02
15-Oct-02
25.4
26.4
27.4
28.4
29.4
30.4
31.4
32.4
33.4
34.4
35.4
36.4
37.4
38.4
39.4
40.4
TOTAL
40
5155
3449
4293
4543
5011
5166
5467
5626
5677
5677
5677
5677
5677
5677
5677
5677
22.5
0.5
0.5
0.5
22
`
24
13
18
0.5
5.5
2.5 13.5
17.5
3.5
13
6.5
2.5
11
1.5
9.5
4
14
6 0.5 3.5
11
1
354
20
14
9 46 225 16 31 57 38 10 51
Hrs
%
841.5
87%
PRODUCTIVE TIME
DRILLING
DRILLING
354
ENLARGE HOLE / UDER REAM 8.5
CON MUD / HOLE CIRCULATION46
TRIPS / LAY DOWN PIPE
225
RUNNING CASING
16
CEMENTING
31
WOC
57
N/U N/D BOP TESTING
38
OTHER DRILLING
9.5
EVALUATION
LOGGING
51
TRIP EVALUATION
0.5
CIRCU / CONDITIONING
6.5
TESTING PRODUCTION
0
CEMENTING
0
OTHER EVALUATION
0
NON PRODUCTIVE TIME
PROBLEMS
FISHING JOB
127.5
0
36%
1%
5%
23%
2%
3%
6%
4%
1%
5%
0.1%
0.7%
0.0%
0.0%
0.0%
13%
0%
0%
3%
LOST CIRCULATION
KICK / KILLING WELL
HOLE INSTABLE
OTHER
REPAIRE
DRILLING EQUIPMENT
OTHER REPAIR
WAITING
MATERIALS / EQUIP
TRANSPORTATION
OTHERS / INSTRUCTION
WEATHER
TRANSPORTATION
OTHER WEATHER
MOVING
MOVING
R/U
OTHERS
0
0
27
34
0%
0%
3%
3.5%
Other
3.5%
61
0
6%
0%
0
0
6.5
0%
0%
1%
0
0
0%
0%
0
0
0
0%
0%
0%
Total
12%
PROBLEMS
REPAIRE
WAITING WEATHER
NON-PRODUCTIVE TIME
OTHERS
R/U
MOVING
OTHER WEATHER
TRANSPORTATION
OTHERS / INSTRUCTION
TRANSPORTATION
MATERIALS / EQUIP
OTHER REPAIR
DRILLING EQUIPMENT
OTHER
HOLE INSTABLE
LOST CIRCULATION
FISHING JOB
RILLING TIME
MOVING
TOTAL
9
46,244
24
53,894
53,894
72,773
24
72,773
82,590
82,590
112,254
112,254
124,052
133,288
422,280
439,090
449,838
463,004
470,725
480,089
510,135
520,730
535,050
545,004
558,115
663,705
673,235
684,480
703,710
711,948
734,453
767,777
124,052
133,288
422,280
439,090
449,838
463,004
470,725
480,089
510,135
520,730
535,050
545,004
558,115
663,705
673,235
684,480
703,710
711,948
734,453
767,777
777,478
24
24
24
24
18
8
24
3.5
24
6.5
24
24
24
24
24
3.5
24
1.5
Previous
Cum Cost
Today
24
24
24
24
24
24
24
24
24
24
24
24
24
4
24
24
24
24
24
24
13
24
17
24
24
13
14
24
2
24
3
24
24
0 27 34 61
969
40.38
777,478
836,775
855,942
864,787
872,867
894,421
903,928
914,238
927,931
955,055
962,844
969,471
978,507
988,654
996,606
1,136,055
836,775
855,942
864,787
872,867
894,421
903,928
914,238
927,931
955,055
962,844
969,471
978,507
988,654
996,606
1,136,055
1,148,328
Cum Cost
Cost/day
7,650
18,879
9,817
29,664
11,798
9,236
288,992
16,810
10,748
13,166
7,721
9,364
30,046
10,595
14,320
9,954
13,111
105,590
9,530
11,245
19,230
8,238
22,505
33,324
9,701
617,461
59,297
19,167
8,845
8,080
21,554
9,507
10,310
13,693
27,124
7,789
6,627
9,036
10,147
7,952
139,449
12,273
173,070
1,102,084
574,221
14,222
101.15
DEPTH
1
SPUD IN
DRILL HOLE 26"
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
0
150
150
150
150
150
150
150
600
150
150
600
600
600
600
600
600
2300
2300
2300
2300
2300
2300
2300
2300
2300
4400
4400
4400
4400
4650
4650
4650
4650
4650
4650
4650
4650
4650
4650
2400
4990
4990
4990
4990
150
450
450
1700
2100
250
0
2590
ROP
FPH
0
30
0
0
0
0
0
0
30
0
0
30
0
0
0
0
0
40
0
0
0
0
0
0
0
0
30
0
0
0
10
HOUR
30
30
0
0
0
86.3
5.0
5.0
0
5.0
1.5
6.0
3.0
8.0
8.0
1.0
15.0
2.0
2.0
15.0
4.0
12.0
3.0
12.0
4.0
42.5
8.0
12.0
8.0
8.0
15.0
2.0
12.0
6.0
70.0
8.0
6.0
25.0
12.0
48.0
10.0
24.0
TOTAL
HOUR
0
5.0
6.5
12.5
15.5
23.5
31.5
32.5
47.5
49.5
51.5
66.5
70.5
82.5
85.5
97.5
101.5
144.0
152.0
164.0
172.0
180.0
195.0
197.0
209.0
215.0
285.0
285.0
293.0
299.0
324.0
324.0
336.0
384.0
394.0
418.0
418.0
418.0
418.0
418.0
418.0
504.3
504.3
509.3
514.3
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
59
60
61
62
63
64
65
66
67
68
5255
5255
5255
5255
5255
5255
5255
5255
5255
5255
2400
4400
4400
4400
4400
5400
5400
5400
5400
5818
5818
5818
5818
5818
5818
5818
5818
5818
5818
265
10
0
2000
30
30
0
0
0
20
0
0
0
10
1000
418
26.5
8.0
36.0
8.0
12.0
66.7
6.0
6.0
50.0
6.0
6.0
41.8
8.0
48.0
8.0
12.0
12.0
2.0
8.0
10.0
540.8
540.8
548.8
584.8
592.8
604.8
604.8
604.8
604.8
604.8
604.8
671.5
671.5
677.5
683.5
733.5
733.5
739.5
745.5
725.3
725.3
733.3
781.3
789.3
801.3
813.3
815.3
823.3
833.3
PROGRAM
TOTAL
DAYS
0
0
0.21
0
0.06
0
0.25
1
0.13
1
0.33
1
0.33
1
0.04
1
0.63
2
0.08
2
0.08
2
0.63
3
0.17
3
0.50
3
0.13
4
0.50
4
0.17
4
1.77
6
0.33
6
0.50
7
0.33
7
0.33
8
0.63
8
0.08
8
0.50
9
0.25
9
2.92
12
12
0.33
12
0.25
12
1.04
14
14
0.50
14
2.00
16
0.42
16
1.00
17
17
17
17
17
17
3.60
21
21
0.21
21
0.21
21
DAYS
DAYS
HRS SCALE
Hole
26"
17-1/2" hole
1.35
0.63
1
15
0.1
1.0
12-1/4" hole
0.63
15
1.0
1.46
1.77
35
43
2.3
2.8
2.96
2.92
71
70
4.7
4.7
8.5" hole
1.10
0.33
1.50
0.33
0.50
2.78
0.25
0.25
2.08
0.25
0.25
1.74
0.33
2.00
0.33
0.50
0.50
0.08
0.33
0.42
23
23
23
24
25
25
25
25
25
25
25
28
28
28
28
31
31
31
31
33
33
33
35
35
36
36
37
37
37
#REF!
Spud in
POOH, L/D, dropped survey, set csg 20", repairing stinger and other equipments, waiting top plug, cmntg, WOC, 21-1/
Circl'd to clean hole, drop multishot survey, POOH to take the result of multishot survey
Actual
Start (ft)
Target Depth
MD (ft)
TVD (ft)
0
0
0
170
Hour
Day
0
5.5
27.5
5.5
3.5
8.5
41.0
23.5
76.0
10.0
14
3.5
9.5
20
8
16
2
5
14
10.5
32.5
22.5
11.5
6
65
170
170
170
170
655
170
170
655
2693
2693
2899
2899
3850
3850
4288
4288
4382
4382
4486
4486
4694
4694
4740
2358
2358
655
655
2330
2330
2693
2693
2899
2899
3850
3850
4288
4288
4382
4382
4486
4486
4694
4694
4740
4740
2358
4106
4106
4106
5043
5043
5155
2434
2434
4437
4437
4543
4543
4106
5043
5043
5155
5155
2434
4437
4437
4543
4543
5157
10.5
37.5
13.5
11.5
47.5
5157
5157
5467
5467
5157
5467
5467
5677
18
18.5
17.5
19.5
5677
5677
185.5
655
2330
2330
47
57
4
4
13
23
0
0
1
2
2
2
4
5
8
8
9
9
10
10
11
11
11
12
12
13
14
15
15
16
18
18
20
21
22
23
23
25
25
28
28
28
29
30
30
31
32
33
40
18
18.5
17.5
19.5
0
0
5467
5467
0
5467
5467
5677
5677
5677
17.5
5677
5467
5467
5467
5467
5677
18.5
17.5
19.5
5677
5677
17.5
1
2
2
3
4
5
5
6
7
PT EXSPAN NUSANTARA
EAST JATA#1
RIG TIME DISTRIBUTION
TIME
(HOURS)
I
MOVE
1 MOVING
2 MOORING
0.00
0.00
n/a
0.00%
0.00
0.00
0.00%
353.5
8.5
225
46.5
57
0.00
46
0.00
0.00
0.00
37.5
9.5
14.73
0.35
9.38
1.94
2.38
0.00
1.92
0.00
0.00
0.00
1.56
0.40
36.75%
0.88%
23.39%
4.83%
5.93%
0.00%
4.78%
0.00%
0.00%
0.00%
3.90%
0.99%
783.5
32.65
81.44%
0.00
51
0.00
0.00
0.00
2.13
0.00
0.00
0.00%
5.30%
0.00%
0.00%
51.00
2.13
5.30%
60.50
0.00
0.00
0.00
0.00
27.00
0.00
33.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.50
2.52
0.00
0.00
0.00
0.00
1.13
0.00
1.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.27
6.29%
0.00%
0.00%
0.00%
0.00%
2.81%
0.00%
3.48%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.68%
SUBTOTAL
127.50
5.31
13.25%
962.00
40.08
100%
0.00
0.00
0.00
0.00
0.00
0.00
DRILLING OPERATIONS
3 DRILLING
4 HOLE ENLARGING
5 TRIPS
6 CASING AND CEMENTING
7 WOC
8 ABN PRESSURE DETECTION
9 ROUTINE CIRC AND COND
10 SURVEY
11 PLUG AND ABANDON
12 EQUIP. REMOVAL/SALVAGE
13 SUBSEA/WELLHEAD EQUIP & BOP ACTIVITIES
14 OTHER PRODUCTIVE TIME
SUBTOTAL
PERCENTAGE
OF TOTAL
0.00
0.00
SUBTOTAL
II
TIME
(DAYS)
NON-PRODUCTIVE
19 RIG REPAIRS
20 FISHING
21 NOP/S.S. EQUIP REPAIR
22 LOST CIRCULATING
23 WELL CONTROL
24 HOLE INSTABILITY
25 OTHER HOLE/MUD PROBLEM
26 FORMATION EVALUATION
27 MOORING/ASK
28 ENVIRONMENT
29 ANCILLARY CONTR REPAIR
30 CASING AND WELLHEAD
31 DRILL STRING
32 ABANDONMENT SALVAGE
33 UNFORSEEN EVENTS
34 OTHER WAITING
35 OTHER NPT
PRODUCTION TESTING
36 PRODUCTION TESTING
37 PRODUCTION TESTING NPT
SUBTOTAL
WELL TOTAL
8.66
5.75
36.3
7.48
0.59
61
71.09
86.75
5-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
170
8.9
0.46
50
Material
Gel
Bar
CS
30
Cost
PV
YP
Gel
pH
FL
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
259.80
0.00
72.60
0.00
0.00
0.00
0.00
0.00
0.00
6-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
170
8.9
0.46
50
Material
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
655
9.2
0.48
45
14
9/19
10
1.2
320
655
9.6
0.50
49
17
11/20
1.2
320
Material
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
0.00
Cost
0.00
0.00
#####
29.92
0.00
0.00
8-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
655
9.3
0.48
40
7/10
10
11
##### 0.00
1.4
320
Material
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
661
9.6
0.50
45
14
10/19
10
1.2
320
1629
9.8
0.51
49
19
12/24
1.2
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
30
Cost
10-Sep-02
Depth (ft)
Depth (ft)
Material
Cost
11-Sep-02
Depth (ft)
Depth (ft)
Material
259.80
0.00
#####
59.84
0.00
0.00
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
2330
9.8
0.51
46
17
11/26
9.5
1.5
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
30
40
0.00
0.00
0.00
259.80
230.00 72.60
0.00
0.00
0.00
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
2330
9.8
0.51
40
10
8/9
9.5
10
1.3
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Cost
51.96
0.00
0.00
0.00
0.00
0.00
12-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
2330
9.6
0.50
44
13
10/21
10
1.3
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
0.00
Material
Cost
13-Sep-02
Depth (ft)
Material
Cost
14-Sep-02
Depth (ft)
Depth (ft)
0.00
0.00
0.00
59.84
0.00
0.00
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
2340
9.6
0.50
45
16
10/22
10
1.2
320
2631
9.8
0.51
57
11
21
14/30
9.5
1.2
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
60
60
0.00
0.00
0.00
519.60
345.00 #####
##### 0.00
0.00
0.00
0.00
PV
YP
Gel
pH
FL
Prop
MW
grad
Visc
2700
9.6
0.50
48
15
10/21
9.5
1.3
320
2899
9.8
0.51
52
10
19
14/24
9.5
1.2
320
Material
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Cost
0.00
0.00
72.60
0.00
0.00
0.00
15-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
3319
9.8
0.51
46
16
12/20
9.5
1.2
320
3819
10
0.52
53
11
24
14/26
9.5
1.3
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
Cost
0.00
0.00
72.60
0.00
0.00
0.00
16-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
3986
10
0.52
51
10
19
14/24
9.5
1.3
320
4287
9.8
0.51
46
17
11/21
9.5
1.2
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
Cost
0.00
0.00
#####
0.00
0.00
0.00
17-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
4382
9.8
0.51
45
19
10/21
9.5
1.3
320
4406
9.9
0.51
48
10
17
12/25
9.5
1.3
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
Cost
0.00
0.00
72.60
0.00
0.00
0.00
18-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
4486
10.1
0.53
45
10
19
12/26
9.5
1.3
320
4486
10.1
0.53
49
20
11/26
9.5
1.3
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
Cost
0.00
0.00
0.00
0.00
0.00
0.00
19-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
4486
9.8
0.51
48
16
11/20
9.5
1.2
320
4590
10
0.52
45
17
10/22
9.5
1.4
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
0.00
Material
30
Cost
20-Sep-02
Depth (ft)
Depth (ft)
259.80
0.00
72.60
0.00
0.00
0.00
##### 0.00
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
4667
10
0.52
50
11
20
13/21
9.5
1.3
320
4694
9.9
0.51
47
19
12/22
9.5
1.3
320
Material
Gel
Bar
CS
SB
DD
BT
100
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
0.00
Cost
0.00
0.00
36.30
0.00
59.00
0.00
21-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
4740
10
0.52
46
10
18
13/21
9.5
1.3
320
4740
10
0.52
50
12
18
12/26
9.5
1.3
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
##### 86.75
Cost
0.00
0.00
72.60
0.00
0.00
0.00
71.09
0.00
0.00
22-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
4740
10
0.52
40
10
9/11
9.5
10
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
86.75
0.00
23-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
1996
9.7
0.50
45
15
10/21
10.5
10
1.1
320
2294
9.5
0.49
40
13
10/6
10
11
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
10
Cost
0.00
0.00
0.00
74.80
0.00
0.00
24-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
2791
9.4
0.49
44
14
3324
9.6
0.50
48
10
17
Gel
Bar
CS
SB
DD
BT
Material
90
10
pH
FL
10/18
10
1.1
320
12/22
9.5
1.1
320
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
0.00
Cost
0.00
517.50
0.00
74.80
0.00
0.00
25-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
3782
9.8
0.51
46
17
11/26
9.5
1.1
320
4087
10.1
0.53
54
11
24
13/29
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
60
0.00
0.00
0.00
Material
Cost
0.00
26-Sep-02
Depth (ft)
Depth (ft)
Prop
345.00 #####
0.00
0.00
0.00
##### 0.00
MW
grad
Visc
PV
YP
Gel
pH
FL
4106
9.7
0.50
46
10
21
13/28
9.5
1.1
320
4483
10.1
0.53
54
10
24
11/29
9.5
1.1
320
Material
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Cost
0.00
0.00
72.60
0.00
0.00
0.00
27-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
4793
9.9
0.51
54
12
20
14/24
9.5
1.1
320
5033
10
0.52
46
17
11/23
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
30
Cost
28-Sep-02
Depth (ft)
Depth (ft)
Material
259.80
0.00
72.60
0.00
0.00
0.00
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5064
10.2
0.53
51
12
22
14/24
9.5
1.1
320
5138
10
0.52
45
17
11/22
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Cost
0.00
0.00
72.60
0.00
0.00
0.00
29-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5155
10.1
0.53
46
18
11/26
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
Cost
0.00
0.00
0.00
0.00
0.00
0.00
30-Sep-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5155
10.1
0.53
40
10
9/14
10
11
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
Cost
0.00
0.00
0.00
0.00
0.00
0.00
1-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
2783
9.7
0.50
44
15
10/18
10
1.1
320
3319
10
0.52
49
10
19
12/27
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
30
Cost
2-Oct-02
Depth (ft)
Depth (ft)
259.80
0.00
72.60
0.00
0.00
0.00
Prop
MW
grad
Visc
PV
YP
Gel
3856
9.7
0.50
48
16
4239
9.9
0.51
52
11
19
pH
FL
10/19
10
1.1
320
12/22
9.5
1.1
320
Material
Gel
Bar
30
Cost
3-Oct-02
Depth (ft)
Depth (ft)
Material
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
259.80
0.00
#####
0.00
0.00
0.00
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
4438
9.8
0.51
48
16
10/21
9.5
1.1
320
4543
9.8
0.51
50
17
11/26
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Cost
0.00
0.00
#####
0.00
0.00
0.00
4-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
4710
10
0.52
52
11
20
13/29
9.5
1.1
320
4963
9.9
0.51
48
17
11/24
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
100
Cost
0.00
0.00
0.00
0.00
59.00
0.00
5-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5157
9.9
0.51
49
10
18
12/26
9.5
1.1
320
5157
9.8
0.51
48
17
11/24
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
100
Cost
0.00
0.00
0.00
0.00
59.00
0.00
6-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5311
10.1
0.53
48
10
18
12/21
9.5
1.1
320
5467
9.9
0.51
51
20
11/24
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Material
Cost
0.00
0.00
#####
0.00
0.00
0.00
7-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5467
10
0.52
45
18
10/24
9.5
1.1
320
5615
10.1
0.53
50
11
19
12/26
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
0.00
Material
Cost
0.00
0.00
#####
0.00
0.00
0.00
8-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5677
10.1
0.53
44
15
10/16
9.5
1.1
320
5677
10.1
0.53
50
10
19
12/23
9.5
1.1
320
##### 0.00
Material
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
Cost
0.00
0.00
#####
0.00
0.00
0.00
9-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5677
9.9
0.51
48
20
11/25
9.5
6.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
1
0.00
0.00
0.00
0.00
Material
Cost
0.00
0.00
0.00
0.00
0.00
0.00
10-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5677
9.9
0.51
45
10
18
13/21
9.5
9.5
1.1
320
Material
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5677
9.9
0.51
44
17
10/19
9.5
1.1
320
Material
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5677
9.9
0.51
44
17
10/19
9.5
1.1
320
5677
10.2
0.53
55
11
23
13/29
9.5
1.1
320
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
60
0.00
0.00
0.00
0.00
Material
Cost
0.00
13-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
5677
Gel
Material
345.00 #####
14-Oct-02
Depth (ft)
Depth (ft)
3
0.00
0.00
0.00
grad
Visc
PV
YP
Gel
pH
FL
10.2
0.53
55
11
23
13/29
9.5
1.1
320
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
0.00
0.00
0.00
0.00
30
Cost
##### 86.75
##### 0.00
259.80
0.00
#####
0.00
0.00
0.00
##### 0.00
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
5677
10
0.52
41
11
23
13/29
9.5
1.1
320
Material
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15-Oct-02
Depth (ft)
Depth (ft)
Prop
MW
grad
Visc
PV
YP
Gel
pH
FL
Material
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
Cost
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Gel
Bar
CS
SB
DD
BT
RC
PS
SPC
INR
NP
FBTX
306
310
73
40
300
138
67
1.6
1.7
0.1
0.05
0.0
0.7
0.4
%ppb
Calc
Sand
MC
Total
Solids
WC
Vol
Cost/
(bbls)
0.00
332.40
352
bbls
0.944
Calc
Sand
Solids
WC
MC
Total
Vol
Cost/
0.00
0.00
418
Calc
Sand
Solids
WC
160
0.15
93
120
0.25
91
MC
Total
(bbls)
Vol
(bbls)
bbls
0
Cost/
0.00
423.18
349
bbls
1.213
Calc
Sand
Solids
WC
160
0.1
94
MC
Total
Vol
(bbls)
Cost/
bbls
0
0.00
0.00
359
Calc
Sand
Solids
WC
160
0.15
10
90
120
0.25
11
89
MC
Total
Vol
(bbls)
Cost/
0.00
1309.47
349
bbls
3.752
Calc
Sand
Solids
WC
100
0.25
10
90
MC
Total
Vol
(bbls)
Cost/
0.00
1122.67
492
bbls
2.282
Calc
Sand
Solids
WC
180
0.1
92
MC
Total
Vol
(bbls)
Cost/
bbls
0.00
225.46
500
0.451
Calc
Sand
Solids
WC
120
0.1
92
MC
Total
Vol
(bbls)
Cost/
0.00
202.02
485
bbls
0.417
Calc
Sand
Solids
WC
180
0.1
91
120
0.2
10
90
MC
Total
Vol
(bbls)
Cost/
0.00
1788.32
452
bbls
3.956
Calc
Sand
Solids
WC
160
0.25
10
90
140
0.25
11
89
MC
Total
Vol
(bbls)
Cost/
0.00
530.46
392
bbls
1.353
Calc
Sand
Solids
WC
120
0.25
11
89
120
0.25
13
87
MC
Total
Vol
Cost/
(bbls)
0.00
530.46
402
bbls
1.32
Calc
Sand
Solids
WC
120
0.25
12
88
120
0.25
10
90
MC
Total
Vol
(bbls)
Cost/
0.00
887.42
521
bbls
1.703
Calc
Sand
Solids
WC
120
0.25
10
90
120
0.25
12
88
MC
Total
Vol
(bbls)
Cost/
bbls
0.00
530.46
447
1.187
Calc
Sand
Solids
WC
120
0.25
12
88
120
0.25
12
88
MC
Total
Vol
(bbls)
Cost/
0.00
528.95
472
bbls
1.121
Calc
Sand
Solids
WC
120
0.25
11
89
120
0.25
13
87
MC
Total
Vol
(bbls)
Cost/
0.00
901.12
483
bbls
1.866
Calc
Sand
Solids
WC
120
0.2
13
87
120
0.25
11
89
MC
Total
Vol
(bbls)
Cost/
0.00
537.50
500
bbls
1.075
Calc
Sand
Solids
WC
120
0.25
13
87
120
0.25
13
87
MC
Total
Vol
(bbls)
Cost/
0.00
143.69
506
bbls
0.284
Calc
Sand
Solids
WC
120
0.25
12
88
MC
Total
Vol
(bbls)
Cost/
0.00
86.75
506
bbls
0.171
Calc
Sand
Solids
WC
180
0.2
91
200
0.25
10
90
MC
Total
Vol
(bbls)
Cost/
bbls
0.00
248.30
506
0.491
Calc
Sand
Solids
WC
100
0.2
91
120
0.2
11
89
MC
Total
Vol
(bbls)
Cost/
0.00
876.66
506
bbls
1.733
Calc
Sand
Solids
WC
100
0.25
10
90
120
0.25
13
87
MC
Total
Vol
(bbls)
Cost/
0.00
1090.24
506
bbls
2.155
Calc
Sand
Solids
WC
100
0.25
11
89
100
0.25
14
86
MC
Total
Vol
Cost/
(bbls)
0.00
814.82
506
bbls
1.61
Calc
Sand
Solids
WC
120
0.25
10
90
140
0.25
13
87
MC
Total
Vol
(bbls)
Cost/
0.00
1137.26
506
bbls
2.248
Calc
Sand
Solids
WC
100
0.25
14
86
140
0.25
11
89
MC
Total
Vol
(bbls)
Cost/
0.00
735.28
506
bbls
1.453
Calc
Sand
Solids
WC
120
0.25
12
88
MC
Total
Vol
(bbls)
Cost/
bbls
0.00
244.59
506
0.483
Calc
Sand
Solids
WC
120
0.2
13
87
MC
Total
Vol
(bbls)
Cost/
0.00
173.50
506
bbls
0.343
Calc
Sand
Solids
WC
160
0.2
10
90
140
0.25
12
88
MC
Total
Vol
(bbls)
Cost/
0.00
861.35
506
bbls
1.702
Calc
Sand
Solids
WC
160
0.2
10
90
120
0.25
12
88
MC
Total
Vol
(bbls)
Cost/
0.00
1214.84
506
bbls
2.401
Calc
Sand
Solids
WC
120
0.25
10
90
100
0.25
11
89
MC
Total
Vol
(bbls)
Cost/
0.00
778.07
506
bbls
1.538
Calc
Sand
Solids
WC
120
0.25
14
86
120
0.25
12
88
MC
Total
Vol
(bbls)
Cost/
0.00
603.61
506
bbls
1.193
Calc
Sand
Solids
WC
120
0.25
14
86
120
0.25
12
88
MC
Total
Vol
(bbls)
Cost/
bbls
0.00
603.61
506
1.193
Calc
Sand
Solids
WC
100
0.25
14
86
120
0.25
11
89
MC
Total
Vol
(bbls)
Cost/
0.00
745.24
506
bbls
1.473
Calc
Sand
Solids
WC
100
0.25
12
88
100
0.25
14
86
MC
Total
Vol
(bbls)
Cost/
0.00
500.65
506
bbls
0.989
Calc
Sand
Solids
WC
120
0.25
12
88
100
0.25
12
88
MC
Total
Vol
Cost/
(bbls)
0.00
566.76
506
bbls
1.12
Calc
Sand
Solids
WC
120
0.25
12
88
MC
Total
Vol
(bbls)
Cost/
0.00
371.11
506
bbls
0.733
Calc
Sand
Solids
WC
120
0.25
12
88
MC
Total
Vol
(bbls)
Cost/
bbls
0
0.00
0.00
506
Calc
Sand
Solids
WC
100
0.25
12
88
MC
Total
Vol
Cost/
(bbls)
bbls
0.00
0.00
506
Calc
Sand
Solids
WC
100
0.25
12
88
100
0.25
14
86
MC
Total
Vol
Cost/
(bbls)
0.00
703.47
506
bbls
1.39
Calc
Sand
Solids
WC
100
0.25
14
86
MC
Total
Vol
(bbls)
Cost/
0.00
831.54
506
bbls
1.643
Calc
Sand
Solids
WC
100
0.25
14
86
MC
Total
Vol
(bbls)
Cost/
bbls
0
0.00
0.00
506
Calc
Sand
Solids
WC
MC
Total
Vol
Cost/
(bbls)
0.00
0.00
506
bbls
0
MC
Total
Vol
Cost/
DEPTH
1
SPUD IN
DRILL HOLE 26"
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
29
30
31
32
33
34
35
36
37
38
0
150
150
150
150
150
150
150
600
150
150
600
600
600
600
600
600
2300
2300
2300
2300
2300
2300
2300
2300
2300
4486
4486
4486
4486
4686
4686
4686
4686
4686
4686
4686
4686
4686
4686
150
450
450
1700
2186
200
ROP
FPH
0
30
0
0
0
0
0
0
30
0
0
30
0
0
0
0
0
40
0
0
0
0
0
0
0
0
30
0
0
0
10
HOUR
0
5.0
1.5
6.0
3.0
8.0
8.0
1.0
15.0
2.0
2.0
15.0
4.0
12.0
3.0
12.0
4.0
42.5
8.0
12.0
8.0
8.0
15.0
2.0
12.0
6.0
72.9
8.0
6.0
20.0
24.0
12.0
36.0
12.0
12.0
24.0
3.0
12.0
8.0
TOTAL
HOUR
0
5.0
6.5
12.5
15.5
23.5
31.5
32.5
47.5
49.5
51.5
66.5
70.5
82.5
85.5
97.5
101.5
144.0
152.0
164.0
172.0
180.0
195.0
197.0
209.0
215.0
287.9
287.9
295.9
301.9
321.9
345.9
357.9
393.9
405.9
417.9
441.9
444.9
456.9
464.9
PROGRAM
TOTAL
DAYS
0
0
0.21
0
0.06
0
0.25
1
0.13
1
0.33
1
0.33
1
0.04
1
0.63
2
0.08
2
0.08
2
0.63
3
0.17
3
0.50
3
0.13
4
0.50
4
0.17
4
1.77
6
0.33
6
0.50
7
0.33
7
0.33
8
0.63
8
0.08
8
0.50
9
0.25
9
3.04
12
12
0.33
12
0.25
13
0.83
13
1.00
14
0.50
15
1.50
16
0.50
17
0.50
17
1.00
18
0.13
19
0.50
19
0.33
19
DAYS
CONTROL >>
DAYS
HRS SCALE
Hole
26"
17-1/2" hole
1.35
0.63
1
15
0.1
1.0
12-1/4" hole
0.63
15
1.0
1.46
1.77
35
43
2.3
2.8
2.96
3.04
71
73
4.7
4.9
15.8
252.4
16.8
8.5" hole
#REF!
Spud in
POOH, L/D, dropped survey, set csg 20", repairing stinger and other equipments, waiting top plug, cmntg, WOC, 21-1/
Actual
Start (ft)
Target Depth
MD (ft)
TVD (ft)
0
0
0
170
170
170
170
170
655
170
170
655
655
655
2330
2330
2693
2693
2899
2899
3850
3850
4288
4288
4382
4382
4486
4486
655
2330
2330
2693
2693
2899
2899
3850
3850
4288
4288
4382
4382
4486
Hour
0
5.5
27.5
5.5
3.5
8.5
41.0
23.5
76.0
10.0
14
3.5
9.5
20
8
16
2
5
14
10.5
17.5
Day
0
0
1
2
2
2
4
5
8
8
9
9
10
10
11
11
11
12
12
13
13
13
13
13
13
13
13