ROLL CHANGE DETAILS IN MONTH MAY.

2009

Sum - Duration(H)
REASON
BRIGHT 4.69
C/O 5.27
MATTE 3.77
SKID MARK 0.33
SOFT SOT 0.42
Total Result 14.48

OPRATION DELAYS FOR MONTH MAY 2009

Sum - Duration(H)
Detail
BOTH GAMMA RAY STD. DONE. 3.14
COIL NO-27585601 TWICE SHIFTING IN 1ST PASS 0.83
COOLANT MAINTENANCE DONE 0.67
CORTON STEEL ROLLING EXTRA PASS DUE TO VERY HIGH LOAD. 1.42
GUIDE WOOD CHANGED 1.82
S/B IN PREFINAL PASS,DUE TO TOP IMR SPAULL,CBBLED SHEET REMOVED 0.42
TAPER PLATE CHANGED BOTH SIDE 4.25
Total Result 12.55
NOS OF R/C
Total
12
12
9
1
1
35
Count - Duration(H)
REASON
BRIGHT 12
C/O 12
MATTE 9
SKID MARK 1
SOFT SOT 1
Total Result 35
01.06.2009 Dynamic List Display 1

Date : 01.06.2009

Date Shift Line Agency From Time To Time Duration(H)


02.05.2009B 6HI MILL ROLL CHANGE
20:10:00 20:45:00 0.58
02.05.2009C 6HI MILL ROLL CHANGE1:35:00 2:00:00 0.42
03.05.2009A 6HI MILL ROLL CHANGE6:25:00 6:50:00 0.42
04.05.2009C 6HI MILL ROLL CHANGE4:45:00 5:10:00 0.42
05.05.2009A 6HI MILL ROLL CHANGE
12:50:00 13:15:00 0.42
06.05.2009A 6HI MILL ROLL CHANGE
10:25:00 10:50:00 0.42
06.05.2009A 6HI MILL ROLL CHANGE
13:15:00 13:40:00 0.42
06.05.2009C 6HI MILL ROLL CHANGE2:55:00 3:15:00 0.33
07.05.2009B 6HI MILL ROLL CHANGE
14:10:00 14:40:00 0.5
09.05.2009C 6HI MILL ROLL CHANGE1:20:00 1:45:00 0.42
11.05.2009B 6HI MILL ROLL CHANGE
21:10:00 21:35:00 0.42
13.05.2009C 6HI MILL ROLL CHANGE
22:00:00 22:25:00 0.42
13.05.2009C 6HI MILL ROLL CHANGE1:40:00 2:05:00 0.42
14.05.2009A 6HI MILL ROLL CHANGE6:45:00 7:10:00 0.42
15.05.2009A 6HI MILL ROLL CHANGE6:30:00 6:55:00 0.42
15.05.2009A 6HI MILL ROLL CHANGE9:35:00 9:55:00 0.33
16.05.2009C 6HI MILL ROLL CHANGE5:50:00 6:00:00 0.17
17.05.2009C 6HI MILL ROLL CHANGE5:15:00 5:40:00 0.42
19.05.2009C 6HI MILL ROLL CHANGE4:00:00 4:20:00 0.33
20.05.2009A 6HI MILL ROLL CHANGE8:10:00 8:35:00 0.42
22.05.2009A 6HI MILL ROLL CHANGE9:10:00 9:35:00 0.42
22.05.2009B 6HI MILL ROLL CHANGE
15:30:00 16:20:00 0.83
22.05.2009B 6HI MILL ROLL CHANGE
16:20:00 16:30:00 0.17
22.05.2009B 6HI MILL ROLL CHANGE
19:20:00 19:45:00 0.42
23.05.2009C 6HI MILL ROLL CHANGE3:00:00 3:20:00 0.33
24.05.2009B 6HI MILL ROLL CHANGE
16:30:00 16:55:00 0.42
25.05.2009B 6HI MILL ROLL CHANGE
17:50:00 18:15:00 0.42
26.05.2009C 6HI MILL ROLL CHANGE
23:35:00 24:00:00 0.42
26.05.2009C 6HI MILL ROLL CHANGE2:05:00 2:30:00 0.42
27.05.2009B 6HI MILL ROLL CHANGE
15:00:00 15:30:00 0.5
28.05.2009A 6HI MILL ROLL CHANGE7:15:00 7:40:00 0.42
28.05.2009C 6HI MILL ROLL CHANGE
23:30:00 23:55:00 0.42
30.05.2009B 6HI MILL ROLL CHANGE
21:30:00 21:50:00 0.33
31.05.2009B 6HI MILL ROLL CHANGE
18:55:00 19:20:00 0.42
31.05.2009C 6HI MILL ROLL CHANGE2:45:00 3:10:00 0.42
* ROLL CHANGE 14.48

** 14.48
Detail Sft inc REASON
W/R & IMR CHANGED AMB C/O
R/C CHANGED FOR BRIGHT ROLLING RBC BRIGHT
R/C FOR MATTE ROLLING AM MATTE
W/R, CHANGED FOR BRIGHT ROLLING RBC BRIGHT
ROLL HANGED AMB C/O
R/C FOR RIDGE AMB C/O
R/C AMB C/O
R/C FOR MATT ROLLING RBC MATTE
ROLL CHANGE FOR BRIGHT ROLLING NN BRIGHT
ROLL CHANGE FOR C/O AM C/O
W/R CHANGED FOR BRIGHT ROLLING RBC BRIGHT
R.C FOR MATT ROLLING AMB MATTE
R/C FOR SOFT SPOT AMB SOFT SOT
WORK ROLL CHANGED FOR BRIGHT ROLLING. NN BRIGHT
W/R CHANGED NN C/O
W/R CHANGED NN C/O
R/C FOR BRIGHT ROLLING AMB BRIGHT
R/C AMB C/O
W/R CHANGED FOR SKID MARK NN SKID MARK
W/R, CHANGED FOR MATT ROLLING RBC MATTE
W/R. CHANGED FOR BRIGHT ROLLING RBC BRIGHT
R/C & MILL INSIDE CHACKED MKD C/O
MILL INSIDE CHACKED MKD C/O
R/C FOR CCL ROLLING AMB MATTE
W/R CHANGED FOR BRIGHT ROLLING NN BRIGHT
W/R. CHANGED FOR BRIGHT ROLLING AMB BRIGHT
R/C AMB C/O
W/R CHANGED FOR BRIGHT ROLLING RBC BRIGHT
W/R CHANGED FOR MATTE ROLLING RBC MATTE
WORK ROLL CHANGE FOR MATT ROLLING NN MATTE
R/C AMB C/O
ROLL CHANGE DONE FOR MATT ROLLING RBC MATTE
W/R CHANGED FOR BRIGHT ROLLING. NN BRIGHT
WORK ROLL CHANGED FOR MATT ROLLING. NN MATTE
R/C FOR BRIGHT ROLLING AM BRIGHT
DPCache_oprn_delay_may_09
Date Shift Line Agency From Time To Time Duration(H)
02/05/09 B 6HI MILL OPERATION 03:15:00 PM 03:25:00 PM 0.17
02/05/09 B 6HI MILL OPERATION 07:25:00 PM 07:50:00 PM 0.42
02/05/09 C 6HI MILL OPERATION 02:20:00 AM 02:30:00 AM 0.17
03/05/09 A 6HI MILL OPERATION 08:10:00 AM 08:20:00 AM 0.17
03/05/09 C 6HI MILL OPERATION 03:40:00 AM 03:50:00 AM 0.17
04/05/09 B 6HI MILL OPERATION 08:10:00 PM 08:40:00 PM 0.5
04/05/09 B 6HI MILL OPERATION 09:50:00 PM 10:00:00 PM 0.17
04/05/09 C 6HI MILL OPERATION 01:40:00 AM 01:50:00 AM 0.17
04/05/09 C 6HI MILL OPERATION 01:50:00 AM 02:10:00 AM 0.33
05/05/09 A 6HI MILL OPERATION 06:50:00 AM 07:00:00 AM 0.17
05/05/09 B 6HI MILL OPERATION 06:00:00 PM 06:30:00 PM 0.5
05/05/09 C 6HI MILL OPERATION 11:00:00 PM 11:15:00 PM 0.25
06/05/09 A 6HI MILL OPERATION 06:40:00 AM 06:50:00 AM 0.17
07/05/09 A 6HI MILL OPERATION 06:40:00 AM 06:50:00 AM 0.17
13.05.2009 B 6HI MILL OPERATION 09:05:00 PM 09:15:00 PM 0.17
15.05.2009 A 6HI MILL OPERATION 07:00:00 AM 07:25:00 AM 0.42
16.05.2009 A 6HI MILL OPERATION 07:25:00 AM 07:45:00 AM 0.33
16.05.2009 A 6HI MILL OPERATION 11:00:00 AM 11:30:00 AM 0.5
16.05.2009 A 6HI MILL OPERATION 11:30:00 AM 11:40:00 AM 0.17
16.05.2009 C 6HI MILL OPERATION 10:25:00 PM 10:35:00 PM 0.17
19.05.2009 C 6HI MILL OPERATION 02:55:00 AM 03:05:00 AM 0.17
19.05.2009 C 6HI MILL OPERATION 03:30:00 AM 04:00:00 AM 0.5
20.05.2009 B 6HI MILL OPERATION 07:50:00 PM 08:10:00 PM 0.33
20.05.2009 B 6HI MILL OPERATION 08:35:00 PM 08:45:00 PM 0.17
20.05.2009 C 6HI MILL OPERATION 10:30:00 PM 10:40:00 PM 0.17
21.05.2009 A 6HI MILL OPERATION 07:55:00 AM 08:20:00 AM 0.42
21.05.2009 A 6HI MILL OPERATION 08:20:00 AM 08:35:00 AM 0.25
21.05.2009 A 6HI MILL OPERATION 12:40:00 PM 01:00:00 PM 0.33
22.05.2009 A 6HI MILL OPERATION 06:40:00 AM 06:50:00 AM 0.17
22.05.2009 A 6HI MILL OPERATION 06:50:00 AM 07:10:00 AM 0.33
22.05.2009 B 6HI MILL OPERATION 03:50:00 PM 04:30:00 PM 0.67
22.05.2009 C 6HI MILL OPERATION 10:30:00 PM 10:50:00 PM 0.33
22.05.2009 C 6HI MILL OPERATION 01:30:00 AM 02:00:00 AM 0.5
22.05.2009 C 6HI MILL OPERATION 04:35:00 AM 05:30:00 AM 0.92
26.05.2009 A 6HI MILL OPERATION 10:00:00 AM 10:35:00 AM 0.58
26.05.2009 C 6HI MILL OPERATION 12/31/99 12:15:00 AM 0.25
26.05.2009 C 6HI MILL OPERATION 04:35:00 AM 04:45:00 AM 0.17
30.05.2009 C 6HI MILL OPERATION 04:30:00 AM 05:00:00 AM 0.5
31.05.2009 C 6HI MILL OPERATION 03:10:00 AM 03:40:00 AM 0.5

Page 6
DPCache_oprn_delay_may_09
Detail
BOTH GAMMA RAY STD. DONE.
S/B IN PREFINAL PASS,DUE TO TOP IMR SPAULL,CBBLED SHEET REMOVED
BOTH GAMMA RAY STD. DONE.
BOTH GAMMA RAY STD. DONE.
BOTH GAMMA RAY STD. DONE.
GUIDE WOOD CHANGED
BOTH GAMMA RAY STD. DONE.
BOTH GAMMA RAY STD. DONE.
GUIDE WOOD CHANGED
BOTH GAMMA RAY STD. DONE.
TAPER PLATE CHANGED BOTH SIDE
TAPER PLATE CHANGED BOTH SIDE
BOTH GAMMA RAY STD. DONE.
BOTH GAMMA RAY STD. DONE.
BOTH GAMMA RAY STD. DONE.
TAPER PLATE CHANGED BOTH SIDE
GUIDE WOOD CHANGED
TAPER PLATE CHANGED BOTH SIDE
BOTH GAMMA RAY STD. DONE.
BOTH GAMMA RAY STD. DONE.
BOTH GAMMA RAY STD. DONE.
COIL NO-27585601 TWICE SHIFTING IN 1ST PASS
GUIDE WOOD CHANGED
BOTH GAMMA RAY STD. DONE.
BOTH GAMMA RAY STD. DONE.
TAPER PLATE CHANGED BOTH SIDE
BOTH GAMMA RAY STD. DONE.
GUIDE WOOD CHANGED
BOTH GAMMA RAY STD. DONE.
TAPER PLATE CHANGED BOTH SIDE
COOLANT MAINTENANCE DONE
COIL NO-27585601 TWICE SHIFTING IN 1ST PASS
CORTON STEEL ROLLING EXTRA PASS DUE TO VERY HIGH LOAD.
CORTON STEEL ROLLING EXTRA PASS DUE TO VERY HIGH LOAD.
TAPER PLATE CHANGED BOTH SIDE
TAPER PLATE CHANGED BOTH SIDE
BOTH GAMMA RAY STD. DONE.
TAPER PLATE CHANGED BOTH SIDE
TAPER PLATE CHANGED BOTH SIDE