DAILY CARGO WORKING REPORT

MV. UNITY SAKURA

Cargo : SBM ARGENTINE ; SBM BRAZILIAN Berthing Time : September, 13th 2022 (Tues) / 20:07 LT Working Day : 2 (Two)
Loading Port : SAN LORENZO - ARGENTINA ; SANTOS - BRAZIL Discharge Port : Terminal Teluk Lamong, Surabaya Start Time : September, 14th 2022 (Wed) / 06:00 LT
Consignee : PT CHAROEN POKPHAND INDONESIA, TBK Ship's Agency : PT. DALIAN PUTRA MARITIM Closing Time : September, 15th 2022 (Thu) / 06:00 LT

TO BE DISCHARGE PREVIOUS SHIFT II (06:00-16:00) SHIFT III (16:00-00:00) SHIFT I (00:00-06:00) TODAY TOTAL TOTAL DISCHARGE BALANCE
HATCH
IN BULK TON TON TON TON TON TON TON IN BULK TON
I SBM BRA 8,495.950 620.000 7,154.000 793.000 7,947.000 8,567.000 SBM BRA -71.050
II SBM ARG 4,662.000 0.000 0.000 0.000 SBM ARG 4,662.000
III SBM ARG 10,358.000 4,473.369 4,794.631 1,109.000 5,903.631 10,377.000 SBM ARG -19.000
IV SBM BRA 9,777.850 0.000 1,666.000 2,004.000 1,669.850 5,339.850 5,339.850 SBM BRA 4,438.000
V SBM ARG 4,382.000 0.000 0.000 0.000 SBM ARG 4,382.000
VI SBM ARG 9,960.000 925.000 4,200.000 194.011 4,394.011 5,319.011 SBM ARG 4,640.989
VII SBM BRA 8,821.860 4,725.679 2,007.321 1,944.302 3,951.623 8,677.302 SBM BRA 144.558
TOTAL 56,457.660 10,744.048 13,020.000 9,598.952 4,917.163 27,536.115 38,280.163 TOTAL 18,177.497

TIME SHEET IDLE NOT Working Hours Total Crane Reporting Based on Conveyor Figures TT3
Working Hours 24.00 Hours
06:10 -- GSU 01 CONTINUE DISCH HOLD 01 Shift II (06:00-16:00) 2 10.0 Hrs Loss Time 8:47 Hours
06:20 -- 06:30 GSU 02 STOP GRAB (PREPARATION FOR LIFTING EXCA 03) 0:10 Shift III (16:00-00:00) 2 8.0 Hrs Effective Working Hours 15.22 Hours
06:31 -- 06:40 GSU 02 LIFT ON EXCA 03 INTO HOLD 06 0:09 Shift I (00:00-06:00) 2 6.0 Hrs Discharging Rate 1,810 T/H
06:43 -- GSU 02 CONTINUE DISCH HOLD 06 Total 6 24.0 Hrs
09:36 -- 09:45 GSU 02 LIFT OFF EXCA 03 FROM 06 ( TROUBLE ENGINE ) 0:09
09:48 -- 09:56 GSU 02 LIFT OFF EXCA 01 FROM HOLD 07 0:08 NB : CARGO CUT TIME AT 06:00
09:57 -- 10:05 GSU 02 LIFT ON EXCA 01 INTO HOLD 06 0:08
10:10 -- GSU 02 CONTINUE DISCH HOLD 06
10:15 -- 10:22 GSU 01 LIFT OFF EXCA 02 FROM HOLD 03 0:07 Acknowledge : Surabaya, September 15th 2022
10:23 -- 10:30 GSU 01 LIFT ON EXCA 02 INTO HOLD 01 0:07 MV. UNITY SAKURA PT. TERMINAL TELUK LAMONG
11:03 -- 11:12 GSU 02 STOP DISCH HOLD 06 PREPARE MOVE TO HOLD 04 0:09 Chief Officer Cont & Dry Bulk Operation Control Officer
11:13 -- 11:23 WAITING LINE NPL READY 0:10
11:24 -- GSU 02 COMMENCE DISCH HOLD 04
11:30 -- 12:12 GSU 02 STOP DISCH (TROUBLE GANTRY) 0:42
12:13 -- GSU 02 CONTINUE DISCH HOLD 04
12:30 -- 12:50 GSU 01 LIFT ON/OFF GASOLIN INTO HOLD 01 0:20
12:55 -- 13:02 GSU 02 LIFT OFF EXCA 01 FROM HOLD 06 0:07
13:03 -- 13:09 GSU 02 LIFT ON EXCA 01 INTO HOLD 04 0:06 [ ] [ ]
15:55 -- 16:08 GSU 01 LIFT ON LOADER LIUGONG INTO HOLD 01 0:13
16:09 -- 16:28 GSU 01 LIFT OFF EXCA 02 & 04 FROM HOLD 01 0:19
16:29 -- 16:47 GSU 01 LIFT ON EXCA 02 & 04 INTO HOLD 03 0:18
17:30 -- GSU 01 COMPLETED DISCH HOLD 01
17:31 -- 17:43 GSU 01 LIFT OFF LOADER LIUGONG FROM HOLD 01 0:12
18:00 -- 18:14 GSU 02 LIFT OFF EXCA 01 FROM HOLD 04 0:14
18:15 -- 18:29 GSU 02 LIFT ON EXCA 01 INTO HOLD 07 0:14
18:26 -- GSU 01 CONTINUE DISCH HOLD 03
18:30 -- 18:41 GSU 02 REFUEL EXCA IN HOLD 07 0:11
18:42 -- GSU 02 CONTINUE DISCH HOLD 07
19:48 -- 20:29 GSU 02 STOP GRAB (TROUBLE EXCA 01 IN HOLD 07) 0:41
20:53 -- 21:07 GSU 02 LIFT ON EXCA 03 INTO HOLD 07 0:14
20:57 -- 21:19 GSU 01 REFUEL EXCA IN HOLD 03 0:22
21:08 -- 21:18 GSU 02 LIFT OFF EXCA 01 FROM HOLD 07 0:10
00:00 -- GSU 01 & GSU 02 CONTINUE DISCH 0:00
00:50 -- 01:20 GSU 01 LIFT ON LOADER KOMASTU HOLD 03 0:30
01:21 -- 01:55 GSU 01 TRNSFER EXCA 02&04 FROM HOLD 03 TO HOLD 04 0:34
01:56 -- GSU 01 CLEANING HOLD 03
01:56 -- 02:15 GSU 02 LIFT ON LOADER (EXTRRNAL) LIUGONG HOLD 07 0:19
02:16 -- GSU 02 CLEANING HOLD 07
02:31 -- GSU 01 COMPLETED DISCH HOLD 03
02:32 -- 02:50 GSU 01 LIFT OFF LOADER KOMATSYU HOLD 03 0:18
02:56 -- GSU 01 CONTINUE DICH HOLD 04
02:20 -- 02:59 GSU 02 STOP DISCH BECAUSE EXCA 03 TROUBLE CAN'T ON 0:39
03:30 -- 03:37 GSU 02 WAITING OPEN HATCH COVER HOLD 06 0:07
03:38 -- 03:48 GSU 02 LIFT ON EXCA 01 HOLD 06 0:10
03:49 -- GSU 02 CONTINUE DISCH HOLD 06
03:54 -- GSU 02 CONVEYOER LINE B OVER FLOW
04:00 -- 04:30 GSU 02 TRANSFER EXCA 03 HOLD 07 TO HOLD 06 0:30
04:05 CONVEYOR BC TROUBLE CLUTCH BROKEN
04:45 -- GSU 01 STOP GRAB PROCESS CLEANING LINE FOR EVACUATION CARGO
05:16 GSU 01 CONTINUE DISCH HOLD 04