Professional Documents
Culture Documents
INITIAL DATE : Sept 23, 2017 FINAL DATE Sept 29, 2017
TIME : ,09.00 TIME : 10.00
DRAFT FORE MID AFT FORE MID AFT
PORT : 12,54 12,58 12,72 4,38 5,22 6,06
STBD : 12,52 12,59 12,70 4,41 5,24 6,04
MEAN : 12,530 12,585 12,710 4,395 5,230 6,050
Stem Corr : -0,001 0,000 0,007 -0,008 -0,004 0,060
Corr'd Draft : 12,529 12,585 12,717 4,387 5,226 6,110
Fore&Aft Mean : 12,6230 5,2485
Mean of Mean : 12,60400 5,23725
Quarter Mean : 12,594500 dm 0,50 5,231625 dm 0,50
DISPLACEMENT : 76.005,250 df 1,00 30.045,750 df 1,00
1st Trim Corr : 2,936 da 7,50 -330,360 da 7,50
2nd Trim Corr : 0,267 App Trim 0,180 10,983 App Trim 1,655
Corr'd Displ Trim : 76.008,453 True Trim 0,188 29.726,373 True Trim 1,723
Density Corr : -519,082 LBM 206,50 -58,003 LBM 206,50
CORR'D DISPL : 75.489,371 Density 1,018 29.668,370 Density 1,023
DEDUCTABLE DEDUCTABLE
Fresh Water : 150,000 Fresh Water 115,000
Ballast : 1.500,000 Ballast 19.200,000
Fuel Oil : 610,000 Fuel Oil 575,000
Diesel Oil : 85,000 Diesel Oil 79,000
Lub Oil : 60,000 Lub Oil 59,000
OTHER : 0,000 OTHER 0,000
Total : 2.405,000 Total 20.028,000
PANCA HAMZAH
Chief Officer Surveyor