0% found this document useful (0 votes)
932 views11 pages

Draught Survey Calculation Overview

The document contains calculations from a draught survey of a vessel arriving and departing a port. Key details include: - Arrival draught measurements at the stem, midships and stern. Departure draughts were also measured. - Calculations of trim, displacement and other vessel parameters at arrival and departure. - Ballast and consumption figures showing a large difference between arrival and departure ballast and consumption amounts.

Uploaded by

Marcos Renan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
932 views11 pages

Draught Survey Calculation Overview

The document contains calculations from a draught survey of a vessel arriving and departing a port. Key details include: - Arrival draught measurements at the stem, midships and stern. Departure draughts were also measured. - Calculations of trim, displacement and other vessel parameters at arrival and departure. - Ballast and consumption figures showing a large difference between arrival and departure ballast and consumption amounts.

Uploaded by

Marcos Renan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
  • Draught Survey Calculations: Presents detailed calculations for arrival and departure draughts including trim corrections and displacement differences.
  • Hydrostatic Particulars: Displays hydrostatic data at arrival and departure including draft, volume, and moment figures.
  • Consumables: Covers consumable changes and ballast conditions between arrival and departure, with detailed table listings.
  • Draught Survey Report: Summarizes the draught survey with initial and final survey metrics, including displacement and ballast conditions.
  • Ballast Tank Condition: Details the initial and final condition of ballast tanks measured during the survey with capacity and sounding data.

DRAUGHT SURVEY CALCULATIONS

M/V
PORT: Belém / PA - Armazem 12
DATE: 13MAR 2020
DRAUGHT SURVEY CALCULATIONS

ARRIVAL DRAUGHT (m) DEPARTURE DRAUGHT (m)


Vante MID Ré FOR MID AFT
STB 6.440 6.355 6.420 STB 2.450 3.860 5.490
PRT 6.425 6.330 6.410 PRT 2.490 4.100 5.500
MEAN 6.433 6.343 6.415 MEAN 2.470 3.980 5.495
TRIM -0.018 TRIM 3.025
d T 0.000 0.000 0.000 d T 0.940 0.000 6.500
Corr. 0.000 0.000 0.000 Corr. 0.018 0.000 0.126
DRAFT 6.433 6.343 6.415 DRAFT 2.488 3.980 5.62
TRIM -0.018 TRIM 3.133
M of M 6.363 M of M 3.999
D in SW 18987.0 D in SW 11515.0

FIRST TRIM CORRECTION

TRIM(cm) -1.75 TRIM(cm) 313.31


LCF(m)+/- -2.934 CV Hidrostaticas LCF(m)+/- -5.77
TPC t/cm 32.37 CV Hidrostaticas TPC t/cm 30.99
1st corr. 1.108 1st corr. -373.45

ARRIVAL DEPARTURE

SECOND TRIM CORRECTION

Trim (M2) 0.0003 Trim (M2) 9.82


MCTC+50 293.86 MCTC+50 262.10
MCTC-50 278.03 MCTC-50 251.70
dm/dz 15.83 dm/dz 10.40
2nd corr. 0.00 2nd corr. 34.03

DISPLACEMENT CORRECTED TO SEA WATER

SUM 18988.1 SUM 11175.6


W denst. 0.996 W denst. 0.996
SUM corr 18450.9 Desn Agua doce SUM corr 10859.4
Gravidade 1,025 ou 1
DIFFERENCE IN DISPLACEMENT -7591.5

FINAL CALCULATION
DIFFERENCE IN DISP / DWT -7591.5
DIFFERENCE IN CONSUM. -4209.3
CARGO DISCH / LOADED -11800.7
LIGHT SHIP 5414
Constante 180

Navio + Carga - Consumíveis = 17322.38


Carga + Constant = 11908.38
Carga = 11728.38

Data
DRAUGHT SURVEY CALCULATIONS

DO Navio 11838.41

11836.21

Data
DRAUGHT SURVEY CALCULATIONS

LBP= 149.990 1%LBP = 1.4999


LBP/2 = 74.995
[Link]= 157.26

Navio + Carga - Consumíveis = 5521.64


Carga + Constant = 107.64
Carga = -72.36

Data
DRAUGHT SURVEY CALCULATIONS

HYDROSTATIC PARTICULARS (Trim=0) LBP/2 =


LCF tab
ARRIVAL

draft D in FW D in SW q- t/cm M- tm/cm LCB LCF KM


6.25 ### 21726.00 37.56 389.47 ### 88.296 ### table
6.363 #VALUE! 22143.406 37.560 391.275 #VALUE! 88.149 #VALUE! M of M
6.26 ### 21763.00 37.56 389.63 ### 88.283 ### table

draft MCTC draft MCTC


6.85 293.60 table 5.85 277.90 table
6.863 293.856 M of M + 0,5 5.863 278.028 M of M - 0,5
6.87 294.00 table 5.87 278.10 table

DEPARTURE

draft D in FW D in SW q- t/cm M- tm/cm LCB LCF KM


3.50 ### 32892.00 39.40 444.34 ### 83.536 ### table
3.999 #VALUE! 32931.500 39.410 444.520 #VALUE! 83.525 #VALUE! M of M
4.50 ### 32971.00 39.42 444.70 ### 83.513 ### table

draft MCTC draft MCTC


9.63 453.30 table 8.63 435.40 table
4.499 262.100 M of M + 0,5 3.499 251.700 M of M - 0,5
9.64 453.48 table 8.64 435.58 table

Hydrost. Part.
DRAUGHT SURVEY CALCULATIONS

74.995 LCF
1.187 73.808

Hydrost. Part.
Arrival Departure

Sum Displ 18450.89 10859.39


Light Sh. 157.26 157.26
Consum. 1128.505 5337.755
Const 0 0
Cargo +C 17165.12 5364.376
B/L
ROB
Cargo
DRAUGHT SURVEY CALCULATIONS

Consum. ARRIVAL DEPARTURE Other Arrival Depart.


Ballast 446.70 4698.4 Other 0 0
Fuel oil 391.75 381.36 c 0 0
Diesel 21.33 16.87 Lub. 8.725 8.725
FW 260 232.4 Slops 0 0
Other 8.725 8.725 xxxxx 0 0
TOTAL 1128.505 5337.755 Total 8.725 8.725
Difference in Consumables -4209.25
Final Calculation
Difference in Displ.
Difference in Consm.
Cargo disch / loaded

BALLAST ARRIVAL DEPARTURE


Ref. Tank Capacity Sounding [Link]. Density Total, tns Sounding [Link]. Density
1 Forepeak 0.00 0 1.024 0.00 0 0 1
2 AP 0.00 0 1.024 0.00 0 0 1
3 BD1 PS 0.00 0 1.024 0.00 0 0 1
4 DB1 SS 0.00 0 1.024 0.00 0 0 1
5 DB2 PS 0.00 0 1.024 0.00 0 0 1
6 DB2 SS 0.00 0 1.024 0.00 0 0 1
7 DB3 PS 0.00 0 1.024 0.00 0 0 1
8 DB3 SS 0.00 0 1.024 0.00 0 0 1
9 DB4 PS 0.00 0 1.024 0.00 0 0 1
10 DB4 SS 0.00 0 1 0.00 0 0 1
11 DB5 PS 0.00 0 1.024 0.00 0 0 1
12 DB5 SS 0.00 0 1.024 0.00 0 0 1
13 DB6 PS 0.00 0 1.024 0.00 0 0 1
14 DB6 SS 0.00 0 1.024 0.00 0 0 1
15 DB7 PS 0.00 0 1.024 0.00 0 0 1
16 DB7 SS 0.00 0 1 0.00 0 0 1
17 DB8 PS 0.00 0 1.024 0.00 0 0 1
18 DB8 SS 0.00 0 1.024 0.00 0 0 1
19 W1 PS 0.00 0 1.024 0.00 0 0 1
20 W1 SS 0.00 0 1.024 0.00 0 0 1
21 W2 PS 0.00 0 1.024 0.00 0 0 1
22 W2 SS 0.00 0 1.024 0.00 0 0 1
23 W3 PS 0.00 0 1.024 0.00 0 0 1
24 W3 SS 0.00 0 1.024 0.00 0 0 1
25 W4 PS 0.00 0 1.024 0.00 0 0 1
26 W4 SS 0.00 0 1.024 0.00 0 0 1
27 W5 PS 0.00 0 1.024 0.00 0 0 1
28 W5 SS 0.00 0 1.024 0.00 0 0 1
29 W6 PS 0.00 0 1.024 0.00 0 0 1
30 W6 SS 0.00 0 1.024 0.00 0 0 1
31 W7 PS 0.00 0 1.024 0.00 0 0 1
32 W7 SS 0.00 0 1.024 0.00 0 0 1
33 W8 PS 0.00 0 1.024 0.00 0 0 1
34 W8 SS 0.00 0 1.024 0.00 0 0 1
35 W9 PS 0.00 0 1.024 0.00 0 0 1
36 W9 SS 0.00 59 1 59.00 0 70 1
TOTAL 0 TOTAL 59.00 TOTAL

Consumables
DRAUGHT SURVEY CALCULATIONS

Sounding Volume
0 25
5 87.50
10 150

Consumables
DRAUGHT SURVEY CALCULATIONS

-7591.5
-4209.3
-11800.7

Total, tns
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
70
70

Consumables
DRAUGHT SURVEY REPORT

No. MV Name Page

Arrived at Berth Initial Survey


Left Berth Final Survey

Perpendicular Distances (Metres)


("-" means Marks aft of P/P)
Initial Final [Link](Mt) 157.26
Forward 0.000 -0.940 L.B.P.(m) 149.99
Midships 0.000 0.000
Aft 0.000 -6.500

INITIAL SURVEY (Metres & Tonnes)


Forward Midships Aft ("-" = Forward)
Port 6.425 6.330 6.410 P/P Trim 0.018
Starboard 6.440 6.355 6.420 TPC 32.370
Mean of Port & Stbd 6.433 6.343 6.415 LCF 2.934
Corr to Perpendicular 0.000 0.000 0.000 MCTC"+" 293.86
Corrected Draught 6.433 6.343 6.415 MCTC"-" 278.03
Final Quarter Mean 6.363 DM/DZ 15.83

S.W. Displacement 18987.00 H.O. 391.75


Trim Corr. "A" 1.11 D.O 21.33
Trim Corr. "B" 0.00 L.O. 8.73
Trim [Link] 18988.11 F.W. 260.00
Observed Density 0.9960 Ballast 446.70
Actual Displacement 18450.89 Slops 0.00
Liquids 1128.51 Other 0.00
Nett Displacement 17322.38 Total 1128.51

FINAL SURVEY (Metres & Tonnes)


Forward Midships Aft ("-" = Forward)
Port 2.490 4.100 5.500 P/P Trim -3.133
Starboard 2.450 3.860 5.490 TPC 30.990
Mean of Port & Stbd 2.470 3.980 5.495 LCF 5.769
Corr to Perpendicular 0.018 0.000 0.126 MCTC"+" 262.10
Corrected Draught 2.488 3.980 5.621 MCTC"-" 251.70
Final Quarter Mean 3.999 DM/DZ 10.40

S.W. Displacement 11515.00 H.O. 381.36


Trim Corr. "A" -373.45 D.O 16.87
Trim Corr. "B" 34.03 L.O. 8.73
Trim [Link] 11175.58 F.W. 232.40
Observed Density 0.9960 Ballast 4698.40
Actual Displacement 10859.39 Slops 0.00
Liquids 5337.76 Other 0.00
Nett Displacement 5521.64 Total 5337.755

Initial Nett Displacement 17322.38


Finalt Nett Displacement 5521.64 Constant
Cargo disch./loaded 11800.74
MV Name Page 2 of 2

BALLAST TANK CONDITION

INNITIAL SURVEY FINAL SURVEY


Capacity Sounding M.T. Sounding M.T.
No. Tank (M3) (M) (M)
1Forepeak 0.00 0.00 0.00 0.00 0.00
2AP 0.00 0.00 0.00 0.00 0.00
3BD1 PS 0.00 0.00 0.00 0.00 0.00
4DB1 SS 0.00 0.00 0.00 0.00 0.00
5DB2 PS 0.00 0.00 0.00 0.00 0.00
6DB2 SS 0.00 0.00 0.00 0.00 0.00
7DB3 PS 0.00 0.00 0.00 0.00 0.00
8DB3 SS 0.00 0.00 0.00 0.00 0.00
9DB4 PS 0.00 0.00 0.00 0.00 0.00
10 DB4 SS 0.00 0.00 0.00 0.00 0.00
11 DB5 PS 0.00 0.00 0.00 0.00 0.00
12 DB5 SS 0.00 0.00 0.00 0.00 0.00
13 DB6 PS 0.00 0.00 0.00 0.00 0.00
14 DB6 SS 0.00 0.00 0.00 0.00 0.00
15 DB7 PS 0.00 0.00 0.00 0.00 0.00
16 DB7 SS 0.00 0.00 0.00 0.00 0.00
17 DB8 PS 0.00 0.00 0.00 0.00 0.00
18 DB8 SS 0.00 0.00 0.00 0.00 0.00
19 W1 PS 0.00 0.00 0.00 0.00 0.00
20 W1 SS 0.00 0.00 0.00 0.00 0.00
21 W2 PS 0.00 0.00 0.00 0.00 0.00
22 W2 SS 0.00 0.00 0.00 0.00 0.00
23 W3 PS 0.00 0.00 0.00 0.00 0.00
24 W3 SS 0.00 0.00 0.00 0.00 0.00
25 W4 PS 0.00 0.00 0.00 0.00 0.00
26 W4 SS 0.00 0.00 0.00 0.00 0.00
28 W5 PS 0.00 0.00 0.00 0.00 0.00
28 W5 SS 0.00 0.00 0.00 0.00 0.00
29 W6 PS 0.00 0.00 0.00 0.00 0.00
30 W6 SS 0.00 0.00 0.00 0.00 0.00
31 W7 PS 0.00 0.00 0.00 0.00 0.00
32 W7 SS 0.00 0.00 0.00 0.00 0.00
33 W8 PS 0.00 0.00 0.00 0.00 0.00
34 W8 SS 0.00 0.00 0.00 0.00 0.00
W9 PS 0.00 0.00 0.00 0.00 0.00
35 W9 SS 0.00 0.00 59.00 0.00 70.00
TOTALS 59.00 70.00

COMMENTS AFFECTING SURVEY

Attending Surveyor

You might also like