Dhofar Power Company SAOG

Appendix 7Cl
Notification Points and Hold Points
]111
Clause Reference Notification Points Hold Points
7.1.5 Excess Spans
7.2.21 Danger & Identification plates
7.2.24 Design Calculations
7.2.25 Fabrication Drawings
7.4.3 Misplaced Holes
7.4.4 Formation of Bends
7.4.6 Erection Marks
7.5.2 Cleaning of tower parts for painting
7.6.1 Method Statement
7.6.5 Damaged Galvanising
7.7.1 Ultrasonic Testing
7.7.2 Welding Procedure
7.7.2 NDT Organisation
7.7.2 NDT Procedures
7.7.6 Prototype Support Erection
7.7.6 Prototype Support Test Programme
7.7.6 Prototype support test
Construction of 132kV Overhead line between Awqad GSS &SFZ GSS
Rev. No. :A
and Associated Works (Package-1)
Volume 2 Overhead Line Specification Date : December 2010
Section 7 Supports Page :Page 36 of 38