Dhofar Power Company SAOG ]]11

7.6.3 Site Storage 19


7.6.4 Damaged Steelwork 19
7.6.5 Damaged Galvanising 19
7.6.6 Worklnanship 19
7.6.7 Anti-Climbing Devices, Danger and Identification Plates 20
7.6.8 Aircraft Navigation (Obstruction Aids) 20
7.7 QUALITY CONTROL 20
7.7.1 General 20
7.7.2 Welding 21
7.7.3 Check Erection 22
7.7.4 Galvanising 22
7.7.5 Tolerances 23
7.7.6 Prototype Tests - Lattice Steel Tower 23
7.7.7 Certificate of Conformity 24
7.7.8 Quality Control after Erection 25
7.8 PACKAGING, PROTECTION AND DESPATCH MARKING 25
7.9 HEALTH SAFETY AND ENVIRONMENTAL REQUIREMENTS 25
APPENDICES
Appendix 7A1
Appendix 7A2
Appendix 7A3
Appendix 7A4
Appendix 7AS
Appendix 7A6
Appendix 7B1
Appendix 7C1
Appendix 7D1
Classes of Support
Span Criteria
Loading Criteria
Minimum Thickness & Diameter of Material
Minimurn Clearances
Painting
Engineering Documents to be submitted by Contractor
Notification Points and Hold Points
Reference Standards
Construction of 132kV Overhead line between Awqad GSS &SFZ GSS
Rev. No. :A
and Associated Works (Package-i)
Volume 2 Overhead Line Specification Date : December 2010
Section 7 Supports Page :Page 3 of 38