Company Profile OF: Beetel Engineering Construction PVT - LTD
Company Profile OF: Beetel Engineering Construction PVT - LTD
com
COMPANY PROFILE
OF
BEETEL ENGINEERING
CONSTRUCTION PVT.LTD
This watermark does not appear in the registered version - http://www.clicktoconvert.com
Executive Team
Executive Name Designation Phone
+919818906724
Ms. K.S. Walia Managing Director
+919999919896
Mr.S.K.Jain Director (Finance) +919810385970
Mr. O.P. Kadam Chief Executive(Technical) +919899693553
Mr. Saurabh Gupta Engineer Projects +919899663561
Mr.V.S.Walia Project Coordinator +919212208100
Mr.Sanchit Jain Project Coordinator +919999251005
Registration Details
Sales Tax Registration No.
(A) Delhi TIN-07820156191
(B) Haryana TIN-LC/06661926109 Gurgaon (W)
(C) Punjab EC 1746(DELHI)
ESI Registration No. DL- 23079/7405
PF Registration No 11-31491-101
Electrical License Nos. LW 1344(U.P)
RD-34213711
This watermark does not appear in the registered version - http://www.clicktoconvert.com
Founder S. Harnam
Founder THE COMPANY
Singh(1944) Beetel Engineering & Construction
Pvt. Limited is recently operating, as a
sole propriety company under the name and
style of BEETEL INDIA . This Company is
successor to “M/S Harnam Singh & CO.” a
leading electrical contracting company
operating in & around Delhi for three decades
S. Harnam Singh
since 1950. List of a few projects where
Electrical Installation works were carried out by M/S Harman Singh &
Company giving best standards of quality & completed within specified
time frame is given below:
Year Of
S.No. Projects
completion
Formerly USAID Housing Apartments Now Called
1.
1964
Qutab Hotel, New Delhi.
3.
St. Stephen Hospital, Delhi 1980
7.
IOCL installations at Kanpur (UP) Baramula, (J&K), 1975 to 1977
Amritsar & Jalandar (Punjab) & Surat ( Gujrat)
tumkey job to the tune of Rs. 6 Crores. But we have not set lower limit
of order value. In order to prove our worth, provide value addition to
This watermark does not appear in the registered version - http://www.clicktoconvert.com
any job awarded to us and win the confidence of our clients to ultimate
we can accept job of any value on the lower side.
As a result of experience gained and confidence of our customers
enjoyed today we are in a position to state that we have developed full
capability for execution of electrical contracts on tumkey basis
involving but not limited to Procurement, Detailed Engineering, Supply,
installation, Testing and commissioning of following:
Chief executive
“Mr. Kadam has more than 35 year
experienced technical guide line for
us to obtain our all technical
challenge.
Mr.O.P.Kadam
Brief Introduction
OP Kadam has over 35 years of experience in project engineering, operation and
maintenance in power generation and distribution and plant Utilities in Maruti
Udyog Ltd., Gurgaon, Engineering Projects (I) Ltd, Bharat Electronic Ltd.,
Ghaziabad and M/s Indian Oil Tanking Ltd and Lahmeyer International (I) Ltd.
In MUL, Mr. Kadam had executed various projects of Power Generation & Distribution
and Plant Utilities projects like Water Treatment plant, Effluent Treatment Plant,
Compressed Air plant, LPG Installation and Fuel storage and handling system.
Worked as coordinator Manager Project with Indian Oil Tanking Ltd for the ongoing and new
projects of Storage tanks and utility projects with NTPC, IOCL, Mathura Refinery, IOCL Panipat
Refinery and BPCL Pipeline Terminal Projects. Coordination with Clients and consultant for
design & drawing approval, Vendor drawing approval, procurement, inspection, erection &
commissioning of the projects at Mathura and Panipat Refineries.
1. ABBET CONSULTANTS
5. ACE DESIGN
6. GHERZI EASTERN
7. ENRON
9. SIJCON
12.ASIA PECIFIC
13.OPTIMAL DESIGN
16.JAISWAL ASSOCIATES
17.ENERSAVE CONSLTANTS
Panjab
Punjab
Panjab
Institute
Institute
of medical
of medical
Science(PIMS)
Science(PIMS)
JALANDHAR
JALANDHAR
List Of Sub-Stations
LIST OF SUB-STATION COMPLETED WITH
OUR ASSISTANCE OR
INVOLVEMENT
SIEMENS-CHENAB TEXTILES-
2 KATHUA 66/11 1 X 12.5 Outdoor
SIEMENS-RALSON TYRES-
3 LUDHIANA 66/11 2 X 10 Outdoor
Executed Project
LIST OF IMPORTANT JOBS EXECUTED or UNDER EXECUTION SINCE 1-1-1998
Value of
Sr.N
Description of work Work Consultan Completio Remarks if
o
done ts if any n any
1 Internal & Providing commissioning 4 Lacs Sijcon May Work carried out
assistance for 33 KV out door sub Conultants 1998 (3- as sub
station, Consisting of 3 x 2000 KVA Ahmedabad Months) contractors to
3.3/0.4 KV Transformers & provision M/S siemens
for 4th transformer including supply of Limited
misc. items. for white goods
manufacturing unit of LG Eletronices
at Greater Noida in UP.
2 Internal & External Electrification 70 Lacs September
involing Interior electricals for office, 1998
Lighting and Power Distribution, (7-Months)
Cabling, Earthing , Lightning
Protection, External Lighting,
DO DO
Installation and Commissioning of
Misc. Panels, DBs including supply of
Misc. Items for White googs
manufacturing unit of LG Electronics
at Greater Noida in UP.
3 Eletrical Works for HSD based 110 Lacs June Work carried out
Captive Power Plant (capacity-4 MW) 1998 (3- as sub
in 100% Export Oriented cotton Months) contractors to
Spinning & Weaving Mil of M/S maral M/S Wartsila
Overseas Limited near Indore NSD India Ltd
inclusive of all controls, power stataion N.Delhi
_
lighting, 11kv and LT swichboards,
Aux. Transformer, cabling ,erthing etc.
for power plant & Auxillaries including
EOT crane, waste heat recovery
boiller etc. (Supply of lighting &
erection material included)
4 Eletrical Works for HSD based 55 Lacs April
Captive Power Plant (capacity-4 MW) 1998 (2-
in Synthetic Spinning & Weaving Mil Months)
of M/S Pratibha Syntex Limited near
at Peetampur (indor) inclusive of all
controls, power stataion lighting, 11kv
DO DO
and LT swichboards, Aux.
Transformer, cabling ,erthing etc. for
power plant & Auxillaries including
EOT crane, waste heat recovery
boiller etc. (Supply of lighting &
erection material included)
5 Industrial eletrification involving indoor 145 Lacs March Direct contract
& outdoor lighting, power distribution, 1999 (18- from Clients
installation & commissioning of LT Electrical Months)
Panels/ PCCs, erathing, steel works Consulting
etc. inclinguding Supply & erection of Engineer and
erathing mateiial, steel etc, for in house
footwear Factory of M/S Phoenix design by
international Limited at NOIDA. clients.
This watermark does not appear in the registered version - http://www.clicktoconvert.com
done
13 Misc,Eletrical installation work/ 10.5 Lacs August 1999
upgradation of lighting & power (3 Months)
distribution incluuding supply of
consumables, steel & hardwares, _ _
telephone sytstem etc. at footwear
factory of M/S Phoenix International
Limited.
14 Interal eletrification of warehouse & 25 Lacs Engineering Work carried out
storage shades at Mathura Refinary of India Ltd. as sub
indian Oil Corporation Limited contractors to
including design, supply of all the Sepember M/S ANS
materials like LT panel, distribution 1999 (6 Constructions
boards, light fixtures, wiring material, months) As
earthing etc. but excluding supply of Per Civil
cables. completion)
15 Augmentation of interal eletrical 8.6 Lacs June
distribution system in office area at 1999 (2
white goods factory of LG Eletronics in weeks)
Greater NOIDA (UP) including _ _
providing necessary design, supply of
material, installation & commissioning
of DBs, cabling & terminations.
16 Installation & commissioning of 10.5 Lacs C.P.Kukreja October Work carried out
internal & external eletrical works, & Associates 1999 (4Mo as sub
Telephone & PA system, LAN wiring New Delhi nths) contractors to
etc. for auto Ancilliary Plant of M/S siemens
machino TSK Nippon cables at IMT Limited
Manesar.
17 Detailed Engineering, Supply of 65 Lacs October Work awarded by
material, installation & commissioning 1999 (6 M/S ANS
of interal & external eletricals including Months) Constructions the
telephone & T.V circuting for main contractors
multipurpose hall (auditorium), health _ for the entire
care centre & other Misc. Buildings Turn- Key work
within twonship of Fertiliser plant of
M/S Chambal Fertillisers & Chemicals
Limited at Kota.
18 Installation & providing commissioing 4.5 Lacs Aug-99 & Work carried out
assistance of 66 kv sub station having feb-2000.(6 as sub
2 nos. 12.5 MVA, 66/KV Transformers Months) contractors to
_
(excluding installation but assembly of M/S siemens
transformers) for type factroy of M/S Limited
Ralson Tyres at Ludhiana.
19 Design, supply & installation of 52 Lacs In House January
eletricals involving LT Panels/DBs, Design as 00. (4
lumanaries, cables and cable per Months)
terminationes, raceways, earthing, customers
_
tlephone system etc. towards requirements
additional facilites at white goods .
manufacturing unit of LG Eletronice at
Greater NOIDA.
Value of Completio Remarks if
Sr.N
Description of work Work Consultan n any
o
done ts if any
This watermark does not appear in the registered version - http://www.clicktoconvert.com
20 Installation & commissioning of plant 27.5 Lacs ACE Design April Work carried out
eletricals involving power distribution, Faclity 00 (6 as sub
LT Panels, MCCs, cables trays, (Eletrical Months) contractors to
cabling & earthing for Compact Disc consultants) M/S siemens
manufacturing project of M/S Moser and Gherzi Limited
Baer India Limited at NOIDA in UP. Eastern
Limited
(Architects)
21 Misc, Eletrical installation work 6.5 Lacs In House May
involving design supply & installation Design by 00 (1.5
of LT Panels, DBs, Lighting, earthing ourselves Months)
etc including rennovtion of existing _
installations in project godown of LG
Electronics at Okhla Industrial Area
New Delhi.
22 Design/ Detailed engineering, Supply 32.5 Lacs Asia Pacific October Work carried out
& Installation of Eletricls (Complete consulants 00 (4 as sub
internal Electrification) for a grass root Chandigarh months) contractors to
agro industry (Potato seeds Plant) of M/S ANS
M/s Chambal agritech (Asubsidiary of Constructions
Chambal Fertillsers and chemicals
Limited) at Nalagrah near Baddi in
UP.
23 Eletrical works like cabling, panel 3.6 Lacs July- Work awarded by
erection, earthing etc. for 2 x 600 TR August 200 M/s Carrier
AC Plant (Chiller Units) at SCOPE _ 0 ( Aircon Limited
integrated office coplex Lodi Road 2 months)
New Delhi.
24 Iinstallation & Assistance in 7.8 Lacs Feb
commissining of 66 KV out door Sub- 2001 (3
Station with 2 no 8 MVA Transfirmers, months)
11KV & LT Panels, Battery with
_ _
Battery Changer, HT, LT and Control
cabling, Yard Lighting etc. for swaraj
Combine Plant of Punjab Tractors
Limited near Chandigrah.
25 Interal Eletrcal Installations associates 52 Lacs Srivastava & November
with interiors (Lighting, Small Power & Iyangar 2000., May
UPS Power Distribution) including Consultants 2001 and
detailed engineering for 500 Seater as well as Decenber
_
Call Center of M/S l-energiser at our in house 2001 (In
NOIDA in UP involving an area involvement three stages
approx. 18000 sq.ft. each about
40 days)
Value of Completio Remarks if
Sr.N
Description of work Work Consultan n any
o
done ts if any
26 Design, Supply detailed engineering, 9 Lacs M/S Jaiswal June 2001 (4
instation, commissioning of main LT Associates Months)
Panel, DBs and external lighting for New Delhi
_
grassroot cold storage of WISE
industrial Parks Limited near Dadri
UP.
27 Corporate Office cum Commercial 24 Lacs October Work carried out
Building Electrification (Internal & 2002 18 to association of
external) involving installation and Months main Contractor
commissioning of 2 Nos. 1250 KVA _ (Work got M/S Nepture
11/0.4 KV Transformers, 2500 KVA, completed in Systems (P) Ltd.
11 KV Automatic Voltage Stabiliser, line with
11 KV and 415 V boards, Main LT overrall
This watermark does not appear in the registered version - http://www.clicktoconvert.com
Progress