Professional Documents
Culture Documents
Cost Calculation
Cost
High-Strength Low-Alloy Steel Hollow Tube (1889.1 kg) x ($7.00 per kg) x (2 Trusses) =
$26,447.68
$1,000.00
$1,000.00
$1,000.00
Deck Cost
Excavation Cost
$1,000.00
$41,200.00
$37,000.00
Abutment Cost
Pier Cost
No pier =
$0.00
Total Cost
$0.00
$373,240.71