Field Report

Grout void at top of tile, plaster to top fo tile, match adjacent.

Field Report
Date: To: First Field Report dated 10.12.09 Ken Davenport Davenport Development 123 Green Drive Pasadena, CA 90088 Sample Project D

Smith Architects

005
check alignment with urinal

Project:

Project No.: 88877

Review consistency of staining fin wall missing

Observations:

001 Supports for stone shelf missing under window. See detail 6/AC9.21.

006

Provide backing at accessible toilets, cement bd. below staff accessible Use toilets, see architectural counter showing sheet A0.4.4 forbar elevations backing. Check framing at locations for recessed accessories.

002

Check outlets agaist elevations on sheet A4.201, 007 some are above counter. Check staff lounge and Dispensary 2nd floor

003 Return end of handrail 23" min. from end of tread, so that total length of the Project: Sample D, Bldg. E handrailProject from the end of tread Project No. 88877 is 23"min.

003

Smith Architects
Field Report

Date:

09/15/09

In. S.S.

Markups list
004

Provide rail from post to opposite wall at +27 inches for cane barrier.

Smith Architects
Field Report

Sample Project D, Bldg. C Project: Project No. 88877 09/15/09 Date: In. S.S.