Field Report
Date: To: First Field Report dated 10.12.09 Ken Davenport Davenport Development 123 Green Drive Pasadena, CA 90088 Sample Project D
Smith Architects
005
check alignment with urinal
Project:
Observations:
001 Supports for stone shelf missing under window. See detail 6/AC9.21.
006
Provide backing at accessible toilets, cement bd. below staff accessible Use toilets, see architectural counter showing sheet A0.4.4 forbar elevations backing. Check framing at locations for recessed accessories.
002
Check outlets agaist elevations on sheet A4.201, 007 some are above counter. Check staff lounge and Dispensary 2nd floor
003 Return end of handrail 23" min. from end of tread, so that total length of the Project: Sample D, Bldg. E handrailProject from the end of tread Project No. 88877 is 23"min.
003
Smith Architects
Field Report
Date:
09/15/09
In. S.S.
Markups list
004
Provide rail from post to opposite wall at +27 inches for cane barrier.
Smith Architects
Field Report
Sample Project D, Bldg. C Project: Project No. 88877 09/15/09 Date: In. S.S.