You are on page 1of 6

BILAD OMAN LLC

DRAWING REGISTER
JOB NO. BUILDING PO NO. 420061 WATER TREATMENT BUILDING PRINT DATE UPDATED ON UPDATE BY DATE 11/22/2011 12/13/2011 1/16/2012 1/29/2012 S.NO DRAWING DESCRIPTION 2/21/2012 DRAWING NUMBER / SKETCH NUMBER. 1/2/2012 SMA 1/9/2014

DGN/DPF-2.0.5 - Rev_1

REMARKS / LATEST STATUS

1 2 1 2 3 4 5 6 7 8 9 10 11 12

SUR-A-00UPH-61-002 SUR-A-00UPH-61-003 SUR-A-00UPH-61-004 SUR-A-00UPH-61-005 SUR-A-00UPH-61-006 SUR-A-00UPH-61-007 SUR-A-00UPH-61-008 SUR-A-00UPH-62-001 SUR-A-00UPH-62-002 SUR-A-00UPH-62-003 SUR-A-00UPH-62-004 SUR-A-00UPH-62-005 SUR-A-00UPH-62-006 SUR-A-00UPH-62-007

DESIGN DRAWINGS Water Treatment Building - Finish Schedule Water Treatment Building - Ground Floor Plan Water Treatment Building - First Floor Plan Water Treatment Building - Roof Plan Water Treatment Building - Elevations Water Treatment Building - Main Section 1 Water Treatment Building - Main Section 2 Water Treatment Building - Foundation Plan Water Treatment Building - Pedestal Loation Plan Water Treatment Building - Column Location Plan Water Treatment Building - Ground Floor Framing Plan Water Treatment Building - 1st Floor Framing Plan Water Treatment Building - Roof Framing Plan - 1 Water Treatment Building - Roof Framing Plan - 2

REVISION 1 1 1 1 1 1 1 1 1 2 1 2 2 2 2 2 2 2 2 2 2 3

0 0 0 0

0 1 1 1

3 2 3 3 3

3 4 4

4 4 5 5

BILAD OMAN LLC


STEEL INDUSTRIES

WORK ORDER - FABRICATION/PAINTING


Job No. W.O. No. W.O. Date Project Client Bldg. Ref. Drawing / Scketch No. Item Marked / Descripti Prepared By: Reviewed By: Approved By:

Material Spec / Other Requirements Steel Material Welding Material Flasing material Gutter Material S. No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Items to Fabricate
Qty.
(Nos)

Rev No.

Surface Preparation & Painting system


Surface Prep.

Primer Coat Intermediate Coat Topcoat


Other Requirements

Total Expected Tonnage Issued on Date Balance to Issue Steel Wt. to Fabricate (Tonnage) Ladders to Fabricate Flashings to Fabricate (M) Gutters to Fabricate (M) Downspouts to Fabricate (M) Handrails to Fabricate (M) Rake Angles (M) Total No. of Pieces (Nos.)

0.00

0.00

REMARKS

TOTAL 0 Classification of Structural Steel Fabrication Items Included in this Work Order

Light

Medium

Heavy

Extra Heavy

Prepared By: Reviewed By: Approved By:

icate
U.Wt.
(Kg)

Total Wt.
(Kg)

0.00 Order

0.00

Extra Heavy

WIP_ASSEMBLY_LIST.xsr