DATE OBSERVED BY LOCATION 11/5/2013 BNL DAS RESTROOM

UA / UC unsafe condition

OBSERVATION It was observed that cement below drinking water pot removed due to fall of water from height on the bricks

11/5/2013 BNL DAS

Access way Unsafe to restroom condition

It was observed that boulders were placed on the access way for the restroom

11/5/2013 BNL DAS

excavated mound

unsafe condition

It was observed that hard barrication was not present at one end of the mound near CP system It was observed that there was no ladder placed inside excavated pit

11/5/2013 BNL DAS

excavated mound

unsafe condition

11/5/2013 BNL DAS

Earthing strip unsafe condition

it was observed that earthing strip was placed on access way near office.

11/5/2013 BNL DAS

Welding cable

unsafe condition

It was observed that welding cable was placed on access way near office

RECOMMADATION proper PCC s should be done son that the cement & bricks will not removed.

ACTION TAKEN STATUS immediately instructed to the supervisor to get done the Good quality PCC

Access way to the Immediately All completed restroom should be boulders placed on always clear. the acess way were removed & the access way was levelled properly Hardbarrication should Immediately completed be always present excavated mound across excavated pit. pit has been hard barricated Ladder should be placed Immediately completed inside the excavated pit ladder was placed for access & regress inside the excavated pit. Access way should Immediately completed always be clear. earthing strip was removed from access way. Access way should Immediately completed always be clear. welding cable was removed from the access way.