You are on page 1of 1

TOWING CHECK LIST

Company Forms and Check Lists

Date : 03.04.01 Rev.No : 1 Prep. : MGV App. : CAP Section : 03 Page : 1 of 1


RADIO ADVICE WRITTEN REPORT
DOCUMENTS

ACTION Determine towing and arrangement that will best suit the intended voyage or emergency. Consider size, horsepower and maneuverability of assisting ship when deciding upon towing arrangement. Detmine whether distressed vessel should be towed from the bow or the stern. Establish early communications to exchange information. Decide what preparations should be made. Consider the means for transferring the towing hawsers between ships and / or ship and tug boat. Choose fixed fairlead or chock with largest possible radius of curvature. Maintain radio communication during connecting up operation.

EVIDENCE

1 2 3 4 5 6 7

INSTRUCTIONS :
To complete in case the vessel needs to be towed. Make relevant entries in th eBridge Log Book. Checklist may then be discarded.

C:\FORMS\03_0020.PDF

MT LADON

You might also like