ALL THE DOWNSTREAM DISTRIBUTION INCLUDING 120V CONTROL POWER TO BE DERIVED BT THE VENDOR. TO SIZE THE INCOMER RATING WE NEED THE CURRENT RATING OF THE HEATER.
REVIEWED FOR
2. __X__
REVISE AS NOTED AND RESUBMIT CONTRACTOR CAN PROCEED BASED ON MAKING REVISIONS NOTED.
3. ____
ANY ACTION SHOWN ABOVE IS SUBJECT TO THE TERMS OF THE CONTRACT AND DOES NOT RELIEVE CONTRACTOR FROM HIS OBLIGATIONS UNDER THE CONTRACT INCLUDING DESIGN AND DETAILING. FOR: FIELD FABRICATED TANK EQUIPMENT NO. BY: PB SPEC NO. N411 --DATE: 9/30/02