PURCHASER WILL PROVIDE THE 480 V SINGL POINT POWER SUPPLY TO STARTER PANEL.

ALL THE DOWNSTREAM DISTRIBUTION INCLUDING 120V CONTROL POWER TO BE DERIVED BT THE VENDOR. TO SIZE THE INCOMER RATING WE NEED THE CURRENT RATING OF THE HEATER.
REVIEWED FOR

General Electric International, Inc.


Dominion Energy/Dresden Energy, LLC Dresden Energy Facility
PROJECT NO. 11038-000

SARGENT & LUNDY, LLC


1. ____ NO EXCEPTION TAKEN, CONTRACTOR
MAY PROCEED WITH FABRICATION 0R CONSTRUCTION.

2. __X__

REVISE AS NOTED AND RESUBMIT CONTRACTOR CAN PROCEED BASED ON MAKING REVISIONS NOTED.

3. ____

RESULTS DO NOT MEET SPECIFICATION REQUIREMENTS. REVISE AND RESUBMIT.

ANY ACTION SHOWN ABOVE IS SUBJECT TO THE TERMS OF THE CONTRACT AND DOES NOT RELIEVE CONTRACTOR FROM HIS OBLIGATIONS UNDER THE CONTRACT INCLUDING DESIGN AND DETAILING. FOR: FIELD FABRICATED TANK EQUIPMENT NO. BY: PB SPEC NO. N411 --DATE: 9/30/02

FOR INFORMATION ONLY S & L REVIEW NOT REQUIRED


General Electric International Inc.

Dominion Energy
PROJECT NO. 11038-000

SARGENT & LUNDY, LLC


4. __X___ 5. _____
CLIENT AND S & L DISTRIBUTION S & L DISTRIBUTION ONLY

FOR: FIELD FAB TANK BY: PBDATE: 09/30/2002

SPEC NO. N411 Dresden Energy Facility

FOR INFORMATION ONLY S & L REVIEW NOT REQUIRED


General Electric International Inc.

Dominion Energy
PROJECT NO. 11038-000

SARGENT & LUNDY, LLC


4. __X___ 5. _____
CLIENT AND S & L DISTRIBUTION S & L DISTRIBUTION ONLY

FOR: FIELD FAB TANK BY: PBDATE: 09/30/2002

SPEC NO. N411 Dresden Energy Facility

FOR INFORMATION ONLY S & L REVIEW NOT REQUIRED


General Electric International Inc.

Dominion Energy
PROJECT NO. 11038-000

SARGENT & LUNDY, LLC


4. __X___ 5. _____
CLIENT AND S & L DISTRIBUTION S & L DISTRIBUTION ONLY

FOR: FIELD FAB TANK BY: PBDATE: 09/30/2002

SPEC NO. N411 Dresden Energy Facility

FOR INFORMATION ONLY S & L REVIEW NOT REQUIRED


General Electric International Inc.

Dominion Energy
PROJECT NO. 11038-000

SARGENT & LUNDY, LLC


4. __X___ 5. _____
CLIENT AND S & L DISTRIBUTION S & L DISTRIBUTION ONLY

FOR: FIELD FAB TANK BY: PBDATE: 09/30/2002

SPEC NO. N411 Dresden Energy Facility

FOR INFORMATION ONLY S & L REVIEW NOT REQUIRED


General Electric International Inc.

Dominion Energy
PROJECT NO. 11038-000

SARGENT & LUNDY, LLC


4. __X___ 5. _____
CLIENT AND S & L DISTRIBUTION S & L DISTRIBUTION ONLY

FOR: FIELD FAB TANK BY: PBDATE: 09/30/2002

SPEC NO. N411 Dresden Energy Facility