BOQ Ref

Substructure Earth Works

Div Activity ID

Activity Name

Excavation Works 2 2 2 Backfilling Works 2 Concrete Works Blinding Concrete

Slab on Grade

Wateproofing Superstructure Ground Floor First Floor Second Floor Third Floor Roof Floor Rough Finishes Ground Floor First Floor Second Floor Third Floor Roof Floor Final Finishes Ground Floor First Floor Second Floor Third Floor Roof Floor Electrical Works Ground Floor First Floor Second Floor Third Floor Roof Floor Mechanical Works Ground Floor First Floor

Second Floor Third Floor Roof Floor Firefighting works Ground Floor First Floor Second Floor Third Floor Roof Floor Conveying System All Floor Close out Rough Finishes Final Finishes Electrical Works Mechanical Works Firefighting works Conveying System

BOQ Description

Qty Unit

Rate

Mat Foundations Isolated Footings Grade Beams Mat Foundations

715 470 83 1321

m3 m3 m3 m3

24.50 30.60 36.70 24.50

100.00% 100.00% 100.00% 100.00%

Under mat foundations, 75 mm thick Under isolated footings, 75 mm thick Under grade beams, 50 mm thick Slab on grade including channels, pits for buildings without transformer unit

30 35 7

m3 m3 m3

336.60 336.60 367.20

100.00% 100.00% 100.00%

1084

m3

85.70

100.00%

Amount

34,945.60 17,517.50 14,382.00 3,046.10 32,364.50 32,364.50 24,449.40 10,098.00 11,781.00 2,570.40

92,898.80