Technical Specifications

1. EXCAVATION, BACKFILLING SITE WORKS

1.1. Site Leveling. (Excavation under the new building and other specified
locations).
Cut in any kind of soil, rock, concrete, or asphalt; to the required Levels, for
the foundations. Include backfilling with excavated suitable materials, or
imported approved materials, removal of extra soil, debris, and organic
materials to a suitable Backfilling material shall be applied on layers, 20cm
thick, watered and compacted to min 95 % to comply with modified AASHTO
Density Test (T-80).
1.2. Excavation for Foundations, Under Ground Construction
Cut in any kind of soil, rock, from Site Reduced Level to the excavation
reduced level (For underground services), and up to the bottom of blinding
under footings and where required as per drawings
The price to include back filling with excavated suitable materials up to
bottom of slab on grade, removal of extra and unsuitable soil. Back filling
material shall be applied on layers 20cm thick watered and compacted to 100
% to comply with modified AASHTO FD.T (T- 8)
1.3. Supply and Well Compact Single Size
Average 15cm thick under slab on grade where directed by the engineer. The
work including watering. Leveling and compacting.

2. CONCRETE WORKS
2.1. Supply and Cast Plain Concrete.
Provisional: Blinding Concrete grade C-15 under foundations of building.
Supply and Cast Reinforced Concrete Class C-25 with a minimum cement
content of 250 Kg. per cubic meter
A. Foundations, footings.
B. Tie beams. (Measured between columns faces).
C. C. Column Necks. (measured from top level of the footings to top level
of the slab on grade)

2.2. Supply and Cast Reinforced Concrete Grade C-25 with a minimum cement
content of 250 Kg. per cubic meter For Slab on grade including surface
leveling, expansion joints. including approved fillers, and all related work
2.3. Floor
S.O.G 20 cm thick reinforced (10mm/20cm Two way), for Building, including
surface leveling, smooth finish.
2.4. Ramp
Ramp will installed in front of the door.

3. STEEL WORKS

3.1. Main Building


Erect and completion of a Steel Structures (Hanger) Hot Rolled Sections
including all the needed Columns, rafters, girths, bracing, purlin, and plates.
As per attach Drawing
3.2. Canopy
Procure ,install and completion of a Steel Structures (Canopy) Hot Rolled
Sections including all the needed Columns, rafters, girths, bracing, purlin,
and plates.

3.3. Roofing
Consisted of roof Sandwich panel panels of 50-80 mm thickness of
polyurethane (Fire Stop) insulated panel Fitted on the purling by metal
screws self-tensile self-drilling screws and this installed on the Rafter, metal,
made I- section a standard fixed to each other by welding system mounted
on the walls and an integrated installation are isolated, As per attach
Drawing and the following details:
*Width 1000mm standard modular sections
* Density 40kg/m3 Thermal conductivity s0.022 kCal/MH Shear coefficient
(GC) =21kg/cm2
* Elastic coefficient (EC) =14 kg/cm2
Roof Gutters: Horizontal element will be repainted steel sheet of 0.6mm
Thickness. Vertical element: 4 PVC Pipes white colon. As per drawings.
3.4. Sandwiched panel walls
 Panels will start at the bottom of building to the top.
 The walls are composed of sandwich panel construction, 50 mm
constructed from slightly corrugated pre painted hot dipped
galvanized steel sheet and covered on both sides with steel sheets.
The panels are injected with polyurethane insulation foam of average
density of 40kg/m2.
3.5. External Swing Doors
Erect and install a new sandwich panel 50 mm constructed from slightly
corrugated pre painted hot dipped galvanized steel sheet and covered on
both sides with steel sheets constructed on exist frame doors.
3.6. Manual Sliding Door
Supply & Installation of steel sliding door 2.1*0.90 m for external doors and
with half Plexiglas window for internal doors. Lockset shall be GFE supplied
from owner.
3.7. Windows
Will be Extruded Aluminum profile RAL9002, light color (white). Fixed on
steel frame painted with steel gray color, window with 6mm clear single
glass.
With lock and necessary hardware. Fly screen with 1.5x1.5mm hole opening
mesh.

4. ELECTRICAL WORKS

4.1. PVC multi-core Copper Cables


Supply, instal1, test and commission 600/1000v. PVC/PVC, local made
multi-core copper cables including;
supports, glands, cable terminals underground cable trenches excavation
and backfilling, ducts, pipes, boxes manholes...etc. All of which shall be
according to the specifications, Codes of practice and highest prevailing
engineering standards, for the following:
 2.5mm2 connect for all lighting.
 4 mm2 connect for 1phase outlets, fans and ACs.
 6 mm2 connect for 3 phase.

4.2. Lighting Points


Supply,install1,connect test and commission a complete Weatherproof High
Bay/Tough Bay Led Light Fixture including all supports lamps ,suspensions
clamp, switchgear, internal conductors and/or cable, and all other
accessories necessary.
4.3. Outlets
a) Supply, install, test and commission a complete 3 phase & 1 phase
20amber and 30amber for both for.
Socket outlet point, including all conductors, cables, conduits, boxes, 3
pin protected and switched socket outlets and all connections between
the appropriate distribution boards and the socket outlet or power
connection. Sockets are MK.
b) Every outlet for AC will has breaker panels for on/ off controls.

4.4. Main Electrical Distribution Board (MDB)


Supply, Install, connect and test Main Electrical Distribution Board
(MDB), 100 A the unit price including the Main MCCB circuit breakers,
Branch breakers (M.C.CBS) measuring instruments, and all other
accessories .

4.5. Manholes & trenches


Supply, install, concrete Electrical manhole 60x60X60 cm, with heavy duty
cover.
4.6. Earthling systems
Supply, instal1, test and commission complete earthling system including all
conductors, copper bars tap-clamps, fixing, earthling pits ...etc. In accordance
with the specifications, drawings, and codes of practice to achieve total
resistance equal or less than 2 (Ohm).
1) Earthling for MDB
2) Earthling for low voltage systems, resistance to earth shouldn't exceed
4ohm.
4.7. Frequency Converter
Supply and installation of new converter capable of converting 220V/50Hz to
220V/60Hz/30Hz
4.8. Exhaust Fans
Install, test and maintain, exhaust fans which exist in site.
Supply a new duct for each fan with 11 m long and stand fixed on side walk.
4.9. Split Unit
Supply and install a GREE split unit with suitable capacities as specifications.

5. Mechanical Works

5.1. Rest Room Accessories


Supply and installation of mechanical components for rest room, and all
necessary parts to complete the best work, which includes the following:
 Western style toilet
 Pedestal sink
 Water heater
 Mirror
5.2. Water line
Supply and installation of CPVC water pipe made in KSA with suitable
diameter.
5.3. Sewer line
Supply and installation of UPVC sewer pipe made in Jordan with suitable
diameter.
5.4. Manholes & trenches
Supply and install, water and sewer manholes 60x60X60cm, with heavy duty
cover.