Illustration 4.

194







Special attention must be paid by the side manager:
Then, backfill compaction around those specific points must be carefully
carried out, with adequate equipment, in order to minimise the differential
settlement.



Illustration 4.195

And finally, good construction procedures, as detailed below, may reduce the consequences of
possible settlements, and make then compatible with Coletanche elongation properties.