Professional Documents
Culture Documents
ACTIVITY
1.0
1.1
1.1.1
1.1.2
1.1.3
1.1.3a
1.1.3b
1.1.3c
i.
ii.
iii.
1.1.3d
i.
ii.
1.1.3e
1.1.3f
1.1.3g
1.1.3h
Construction Stage
Deck
Soil Load From Helle
Subsequent Loading
Selfweight
Surfacing & Utilities
Live Load
Load Model 1
Load Model 2
Load Model 3
Temperature
Uniform
Gradient
Creep & Shrinkage
Accidental Load
Aerodynamics Load due to Rail
Load Combination
1.2
1.2.1
1.2.2
1.2.3
1.2.3a
1.2.3b
1.2.3c
i.
ii.
iii.
1.2.3d
i.
ii.
1.2.3e
1.2.3f
1.2.3g
1.2.3h
Service Stage
Deck
Soil Load From Helle
Subsequent Loading
Selfweight
Surfacing & Utilities
Live Load
Load Model 1
Load Model 2
Load Model 3
Temperature
Uniform
Gradient
Creep & Shrinkage
Accidental Load
Aerodynamics Load due to Rail
Load Combination
1.3
QA of Models
2.0
Design
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
Design of Slab
Design of Edge Beam
Design of Capping Beam over Sheet Pile
Design of Capping Beam over Pier
Design of Pier
Design of Foundation
Capping Beam over Wing Wall
Design of Approach Slab
2.7
QA of Design
3.0
Drawing No.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
4.0
Report
W7
Feb
W8
March
W9
W10
W11
April
W12
W13
W14
W15
W16
W17