Prototype construction

After all the detailed analysis of the desired output of the project has been obtain
and after the design has been completed and analyzed based on the technical
specification of the different components to form the prototype, the proponents bought
all the required components, materials and supplies in Manila in able to start the
prototype construction.
First, the proponents start the layout for space provided for the power supply circuit,
as well as the circuit in the PCB. After the layout, the etching follows with the use of the
mixture of hydrogen peroxide and muriatic acid. After the etching of the PCB, putting
and soldering all electronic components in the PCB follows. Checking the placement
and proper soldering of the components is needed in able for the circuit to function
hence. Using different electronic equipment such as multi-tester can also be used in
able to test the circuit functionality. After all the components have been placed and after
all the components are tested, all circuits are case in the casing to make it more
presentable. After this, the construction of the body for the Scrowbot is established by
using aluminum sheets, metal pipe, many kinds of metals and other constructing tools.
Placing and wiring all circuit in order for the system to function.
After all the components have been placed, and after all the necessary procedures
have been taken, the proponents test the prototype by parts and then by whole system
to test the functionality of the whole system follows. After the proponents tested and
conclude that the prototype is already functioning, lastly, the testing and evaluation with
corresponding surveys and questionnaires have been done in the College of
Engineering with the target respondents to determine the functionality of the prototype.