You are on page 1of 12

AHMEDABAD

1009, Sakar II, Near EllisBridge,


P.B.No.11016, Ahmedabad- 380006
Tel.: 079-66525200 Fax: 079-26576211/ 5217
Email: amits@lntecc.com, Mobile: 9821155922
BENGALURU
19, KumaraKrupaRoad, Bengaluru- 560001.
Tel. No.080-40100123 Fax: 080-22256127
Email: bramesh@lntecc.com, Mobile: 9480494660
CHENNAI
L&T-FormworkMarketing,
Mount PoonamalleeRoad, Manapakkam,
P.B.No. 979, Chennai - 600089, INDIA.
Tel. 044-22526853Fax. 044-22528688,
E-Mail: kvsg@lntecc.com, Mobile: 9444172072
HYDERABAD
Cyber Gateway, B-Block, WingNo. 1, 1st Floor,
Madhapur, Hyderabad- 500081,
Tel: 040-23687162Fax: 040-2312 2441
Email: skb@lntecc.com, Mobile: 94400 53021
KOLKATA
ParkPlaza, II Floor, 71, ParkStreet,
P.B.No. 9010, Kolkata- 700016
Tel.No. 033-22550181/ 0001, FaxNo.033- 22499705
E-Mail: skb@lntecc.com, Mobile: 94400 53021
MUMBAI
LandmarkA, 3rdFloor, SurenRoad,
Off Andheri KurlaRoad, ChakalaAndheri (E),
Mumbai -400093
Tel.No. 022-66965237FaxNo.022-66965345,
E-Mail: amits@lntecc.com, Mobile: 9821155922
NEWDELHI
211, OkhlaIndustrial Estate, PhaseIII,
NewDelhi - 110020
Tel.: 011-41295673Fax: 011-4161 5125
Email: pradeepta@lntecc.com, Mobile:9818054244
PONDICHERRYWORKS
MylamRoad, Sethurapet, Pondicherry- 605111
Tel : 0413-2677902/ 684-686 Fax: 0413-2677727/ 902
E-Mail: kvsg@lntecc.com, Mobile: 9444172072
www.lntecc.com www.lntecc.com
Togetmoredetails of thetotal formworksolutions
thatworklikemagic, pleasecontact:
MOULDING
IMAGINATION
Infrastructure
IT Parks&
Commercial
Centers
Housing
"FOR INFORMATIONPURPOSE ONLY" Neither weareliablenor responsibleif any
product datacontainedinthiscatalogueisusedwhichisnot fit for thepurposeof use.
Noneof theinformationcanbecopiedor usedwithout our expressprior writtenconsent.
1 26 25
L&T Formwork offerscomprehensivesolutionsfor meetingeveryconstructionchallenge.
Beit constructionof abridge, viaduct andintricatebuildingswitharchitectural forms, airport
terminalsor undergroundtunnelswithcomplexcurvatures, L&T Formwork Systemisa
provenformwork solutionsprovider.
Beinganengineeredproduct, it isfullycompatiblewithdifferent componentshavingoptimal
number of individual elements. Thismakesit highlyflexibleandversatileenabling
contractorstoachievestringent timescheduleswithsafetyandquality.
Specialist designsandpreparationof formwork schemes
On-sitetrainingof personnel for effectiveimplementationand
optimumusage
Specializedteamof engineerswithcontinuousresearchandproduct
development offer unparalleledsolutionstocustomersat most
competitiveprices
L&T Formwork Advantage
Total formworksolutionsbyoffering
l
l
l
L&T Formwork Systemscomestoyoufromoneof India'sBest
ManagedandMost RespectedCompany LARSEN & TOUBRO,
havingatrack recordof over 65yearsinthefieldof construction.
Backedbyexperiencedprofessionalsandcutting-edgetechnology,
readytouseL&T Formwork systemsaremanufacturedat itsown
state-of-the-art, ISO certifiedfacilityinPuducherry. Thefacility
alsoundertakesdesign, fabricationandsupplyof custom-built
formwork assembliesfor specializedapplications.
The Facility
Turning Challenges into Achievements

3 2
H-BEAM
THE CORE SYSTEM
H-16 6 KN 3 KN.M
H-20 11 KN 5 KN.M
2
145 KN. M
350
2
KN. M
BEAM MAX. Q MAX. M EI
M=Bending Moment
Q =Shear Force
E =Modulus of Elasticity
I =Moment of Inertia
STRUCTURAL PROPERTIES
Salient Features
lReducedtimber consumption
lMinimiseslabour
lDimensionallystable, uniforminsizeand
consistent instrength
lEconomical andlong-lasting
H-Beam, anengineeredtimber
component isthecoreof thesystem.
Manufacturedunder stringent quality
measures, thewoodenflangesaremade
of chemicallytreated, seasonedtimber.
Usingauniquefinger jointingmethod,
thewebsaremanufacturedbyjoining
theseflangeswithboilingwater-proof
plywood.
H-beamsconsumelesstimber, aslowas
40%of therequiredtimber volume.
Hence, theyarelight, dimensionally
stableandretaintheir structural
propertiesover aperiodof time, even
after continual usage. Theyaremore
predictable, easytodesignanduse.
H-beamscanbeusedandreusednearly
100times, whichis8timesgreater than
conventional timber.
H-beamsareavailableintwosizes
namelyH-16(16cmsdepth) andH-20
(20cmsdepth). Thelengthvaries
between1mto4.00mfor H-16andupto
4.80mfor H-20.
TIMBER
65 MM
21 MM 1
6
0
M
MPLYWOOD
35 MM
TYPICAL C/S OF H-16BEAM
TIMBER
80 MM
2
0
0
M
M
PLYWOOD
40 MM
31 MM
TYPICAL C/S OF H-20BEAM
5 4
L&T FLEX SYSTEM
FOR RC FLOORS
LABOUR PRODUCTIVITY
l
l
l
0.8 manhours per sq.mfor flat slabs
1.5 manhours per sq.mfor beam&slabs
(beams using conventional system)
1.0 manhours per sq.mfor beam&slabs
(beams using beamforming support system)
Salient Features
lFoldabletripodseliminatetheneedfor
bracings
lFlexiblespacingandarrangement options
lSimpleshuttering& de-shutteringresults
inhighlabour productivity
lClean, accurateandsmoothconcretefinish
lSuitablere-proppingincreasesmaterial
productivity 1
2
3
4
1
2
3
4
FOUR-WAYHEAD 3
Use of Additional
Supporting for shutter
SUPPORTING
HEADH20
SupportingComponents
CTPROP250(SN)
CTPROP300(SN)
CTPROP340(SN)
CTPROP410(SN)
EUREX 550(SN)
CTPROP(SINGLENUT) 2 4
1 3a
BEAMFORMINGHEAD
TRIPOD SupportingComponents
4a
A suitableandmoreconvenient typeof
formworkfor layingRC floors, theL&T
FlexSystemismadeupof componentsthat
giveafirmsupport tofloorings. It issuitable
for RC floorsashighas5.80mandisvery
well adaptedfor usewiththeBeamForming
System.
H-beamspositionedat designedintervals
provideadditional support tothe
plywoodsheathing. TheseH-beams,
supportedbytelescopicprops
mountedontripods, ensurelateral
stability.
Propsof varioussizes CT-250, CT - 300,
CT - 340, CT - 410& EUREX 550- canbe
effortlesslymountedonthetripods, enabling
faster andeasier erectionof theshuttering
system. Height adjustmentsaredoneby
adjustingthepropnuts. Requireddimension
isobtainedthroughside-lappingof H-beams
ineither theprimaryor secondarylayer.
Byfacilitatingre-propping, thesystem
minimizesthequantityof formworks
significantly.
H-BEAM
H-16BEAM
H-20BEAM
7 6
L&T FLEX
TABLE SYSTEM
LABOUR PRODUCTIVITY
l
l
2.25 manhours per sq.m(making)
0.85 manhours per sq.m(shift &align)
Widelyusedinmakinglargescaleflat
slabsinconstructionmajorslikeIT
parks, commercial complexesand
malls, L&T FlexTableSystemishandy
andeasytouse. It ishighlysuitedfor
layingRC-floorsupto5.80mheight.
Dependingongridsizes, standard
tablesaremadeusingsuitableand
effectivecomponents: timber beam,
steel member, aluminummember,
collapsiblepropsandplywood
sheathing. Theseprimaryand
secondarybeamcomponentsare
connectedfirmlywithtableheads,
makingtheentiresystemrigidand
robust.

Horizontal shiftingof thesystemis
doneusinghydraulicallyoperatedpallet
trucks, whilevertical shiftingisdone
usingcranes. Thisavoidsdismantling
of individual components, hence
reducinglabour andcycletime.
Salient Features
l
l
l
Perfect combinationwithL&T Flexsystem
IncreasedProductivity noneedto
dismantleanderect againwhileshifting
Boostssavingswithinashort periodof usage
3
2
1
2a
TABLEHEAD
TABLE HEAD30
TABLE HEAD16
FOURWAY
HEAD(SPL)
CT-PROP
2
1
3
H-BEAMWALER
CONNECTOR100LG
CONNECTIONUNIT
H-BEAM
H-16BEAM
H-20BEAM
SupportingComponents
9 8
L&T BeamFormingSupport System
(BFS) issuitablefor RC-Beamsof depth
between30cmto110cm. It is
customisedfor usealongwithFlexand
HeavyDutyTower systems.
BeamBottom: RigidH-20beams/
H-16beams, positionedat designed
spacing, support theplywoodsheathing
andformthesecondarylayer. Thesein
turnaresupported, for extra-stability,
byaprimarylayer of H-beams.
BeamSides: LiketheBeambottom,
theBeamsidesarealsomadeupof
plywoodsheathingsupportedby
H-Beamsat designedspacing, running
alongthelengthof theRC-beam.
SupportedbytheBFS, theH-beamsare
clampedontotheH-20beamsprovided
for theBeambottom. Thebeamforming
support ensurestheright anglebetween
thebeambottomandsides.
BFSextensionsavailableinthreesizes-
600mm, 800mmand1100mminlength
- providerequiredadjustmentsindepth.
Salient Features
lEliminatesuseof timber for beamsides
andbeambottom
lRequiresonlythecuttingandplacement
of plywood
lSuitablefor beamdepthsfrom300mm
onwards
lEasytoassemble, alignandfix
lEasytolevel andobtainaccuracyof
dimension
lAdjustabilityindepthof beamin10mm
increments
lRight angleof sideformworkisensured
withrespect tobeambottom
lFacilitateseasyDe-shuttering
L&T BEAM FORMING
SUPPORT SYSTEM
33
1
2
4
3
2 4a
1 4
BFSEXTN.1100LG
BFSEXTN. 800LG
BFSEXTN. 600LG
BSFEXTN
WINGNUT
BEAMFORMINGSUPPORT20
ANCHOR
PLATE
TIEROD
TUBECONE
SupportingComponents
TIEROD H-BEAM
It isrequiredwhenbeamHT
goestoabove600mmonly
TIEROD
TUBE
H-16BEAM
H-20BEAM
11 10
L&T WALL / COLUMN
FORMWORK SYSTEM
LABOUR PRODUCTIVITY
For Straight Walls:
For Circular Walls:
Coloumn:
l
l
l
l
l
l
0.9 manhours per sq.musing crane
1.7 manhours per sq.mwithout crane
1.3 manhours per sq.musing crane
2.0 manhours per sq.mwithout crane
1.0 manhours per sq.musing crane
1.8 manhours per sq.mwithout crane
L&T Wall & ColumnFormwork
Systemissuitablefor castingRC-walls
andcolumnsof minimum15x15cm.
Inbothcases, theplywoodsheathingis
supportedbyH-beams, backedbysteel
walers. Thisassemblyfacilitatesfixing
workingplatformsfor access, checking
of reinforcement, concreting, etc.
Panelshaveextraprovisiontoachieve
verticalityandtheconcretepressureis
sustainedbyhighstrengthtiesystem.
Thehighstrengthtiesystemcanbe
throughtiesystemor lost anchor
systemdependingonthestructure. The
H-Beamscanbebutt andsplicejointed
toformlarger sizeof panels.
Theentirepanel, alongwiththe
platformandalignment systemcanbe
shiftedusingcranesasasingleunit.
Panelsarecreatedinworkshopsat the
siteandtheassemblyof componentsis
reduced, enhancingaccuracy
throughout. Sincetheentireunit is
handledasawhole, lossof smaller
component isreduced, andcontributes
tomaterial productivity. Intheabsence
of acranethepanelscanbedismantled
andhandledmanually.
Thewalersareavailableinsizesof
0.8m, 1.2m, 1.6m, 1.8m, 2mand2.4m
for makingpanelsandcombinationof
panelswithsplicesandadjustmentscan
bemadetoarriveat theexact lengthsof
RC wall.
Salient Features
lIdeal systemfor speedyconstruction
lPanelscanbedismantledandhandled
manually
lMinimizesthenumber of sheathingjoints
lEnsuresexcellent concretefinishwith
minimumspecializedskill
lLargepanelscanbehandledasasingle
unit withacraneresultinginhighmaterial
andlabour productivity
lSimpleshutteringandde-shuttering
operation
lWall Formworkpanelsfacilitatefixingof
workingplatformandalignment system
lColumnFormworkpanelscanbeused
alongwithClimbingFormworkSystem
7a
2a
2
1 STEELWALER
UNIVERSALINSIDECORNER
SAFEGUARD
DRILLINGPLATE
ASSEMBLYANGLE
3
H-BEAMWALER
CONNECTOR
4
FLANGECLAW
ASSEMBLY
BEAM
CONNECTION
SPLICEPLATE LIFTING
BRACKET
6
SupportingComponents
SPLICEPLATE
ANGLEPLATE
7a
BEAMCLAMP
8 CONNECTINGPIN
5
5a
Supporting
Components
SupportingComponents
SW0.80M
SW1.20M
SW1.60M
SW2.00M
SW2.40M
13a
13 18
TOPSCAFFOLDBRACKET
SCREWONCOUPLER80
HANDRAILPIPE
14 UNIVERSALOUTSIDEFIXING
15 TIEROD3000
TIEROD
TUBECONE
TIERODTUBE
ANCHORPLATE
WINGNUT
ANCHORCONE
PVCPLUG
9
FOOT ADAPTOR ASSEMBLY
10
CTPROP410(DN)
SUPPORTING
BRACKET
11
12
HEADADAPTOR ASSEMBLY
18 15a SupportingComponents
SupportingComponents
5
4
TYPICAL C/S OF WALL / COLUMN
FORMWORKSYSTEM
9
10
11
TYPICAL C/S OF WALL / COLUMN
FORMWORKSYSTEM
12
13
15
COLUMN
PART PLANOF
WALL FORMWORK
PART PLANOF
COLUMNFORMWORK
1
2
3
7
6
8
COLUMN
PART PLANOF
WALL FORMWORK
PART PLANOF
COLUMNFORMWORK
1
2
3
7
6
8
14
H-BEAM
H-16BEAM
H-20BEAM
ADJ.WALING
EXTN.0.65M
13 12
L&T HEAVY DUTY
TOWER SYSTEM
LABOUR PRODUCTIVITYFOR STAGING
l
l
0.3 manhours per cu.mfor 1525 x 1525 towers
0.2 manhours per cu.mfor 1525 x 2250 towers
L&T HeavyDutyTower Systemis
widelyusedasstagingfor heavyfloors
at higher altitudes, andalsoservesas
scaffoldsoncertainoccasions. Heavy
dutyframesarebracedusingstandard
bracings, formingtheheavydutytower
system. Couplersandpinsconnect
framestogether, ensuringverticality.
Spindlesprovidedat thebottomcanbe
usedtoadjust height andlevel. At every
6minterval, thetowersarebracedwith
permanent structuresthat prevent the
tower fromtwistingunder abnormal
loadingconditions.
Eachheavydutytower hasan
unmatchedcapacityof 25MT andis
ideal for handlingheavyloadsat
unusual heights. It alsoservesasTable
Formworkinmulti-storied
constructionsandcanbehandledas
singleunitsuptoaheight of 10m.
TheHeavyDutyBasicframesare
availableinheightsof 0.9m, 1.2mor
1.8m. TheHeavyDutyTowersare
availableintwosizesnamely
1525x1525mmor 1525x2250mm(in
plan).
Heavydutytowerscanalsobeusedas
scaffoldingfor applicationlikeexternal
finishingworks, painting, claddingetc.
Salient Features
lHighloadcarryingcapacityof 6.25MT per leg
lRigidandstablewithminimumbracings
lEasytoerect anddismantleusingunskilledlabour
lEasilyshiftedusingcranesandtransport devices
lIdeal for heavyfloorsinvolvinggreater heights
lCanbeconvertedintostair-tower with
additional standardcomponents
lTowersareavailableinplansizesof
1525x1525mmand2250x1525mm
lCanbeusedasscaffoldingfor external
finishingworks, painting, cladding, etc.
lHeight adjustmentsupto700mmismade
possiblebyadjustablespindlesat topand
bottom
3a
7
3 6
2 5
4 1
H.D.COUPLER
BASICFRAME
HORIZONTALBRACING152
HORIZONTALBRACING225
BF0.90M
BF1.20M
BF1.80M STEELWALER
9
FOUR-WAYHEAD 16DIASPRINGLOCKEDPIN U-HEAD
FOOTPLATE TOWERSPINDLE
11
TRANSPORTDEVICES
10
SHORTPROP
8
DIAGONALBRACING9.152
DIAGONALBRACING18.225
DIAGONALBRACING9.225
DIAGONALBRACING12.152
DIAGONALBRACING12.225
DIAGONALBRACING18.152
3
2
10
6
4
1
11
9
5
8
7
3
2
10
6
4
1
11
9
5
8
7
HORIZONTALBRACING
DIAGONALBRACING
15 14
L&T CLIMBING
SYSTEM
L&T ClimbingSystemisusedfor tall
structureslikecoolingtowers, tankages,
corewalls, wherestagingor scaffolding
alongtheinterior or exterior walls
wouldproveuneconomical.
IntheClimbingSystem, bracketsare
hookedtolost anchors, whichare
alreadyprovidedalongthecast wall.
Entireshutteringissupportedonthe
climbingbrackets. Thebracketsare
suitablybracedtoprevent anyswayand
areprovidedwithwalkways, working
platformsandhandrail for safetyand
easeof operation.
Varyingdegreesof sophisticationare
availableintheclimbingsystems, afew
of whicharelistedbelow:
CB - 150A: Simpleclimbing, crane
handled- platformwidth1.50m. The
bracketsandwall formworkaretobe
handledseparately. Provisionfor
extensionof bracket widthisalso
possible.
CB - 150F: Travel climbing, crane
handled- platformwidth1.50m.
Roll backarrangement for de-shuttering
andcleaningof shutters. Thewall
formworkandclimbingbracket are
liftedasoneunit. Provisionfor
extensionof bracket widthis
alsopossible.
SUSPENDEDPLATFORM150A HANDRAILPOST
4
VERTICAL WALING
CLIMBINGBKT.150f 7
ANCHORCONE18.0
WALINGTOBRACKET
SCISSORACTIONSPINDLE 3
2 5
4 CLIMBINGCONE18.0
6
1 7 STOPANCHOR16.0
88
ANCHORCONE
SLEEVE(PVC)
ANCHORCONE
SPANNERDK 9
1
2
3
4
6
5
7
8
11
22
33
4
6
5
7
88
9
MF - 240: Travel climbing, cranehandled-
platformwidth2.40m. Thesebracketscanalso
befittedwithautomaticclimberslikeSKE-50
whichisahydraulicsystem(5MT capacity).
AutomaticClimbingFormwork: Thewall
formworkalongwiththeclimbingbrackets
slidealongthewall usinghydraulics, thus
eliminatingtheneedfor acrane. Thissystemis
veryoftenusedfor corewallsinhighrise
structures, cablestayedbridgepylons, natural
draught coolingtowers, etc.,
Salient Features
l
l
l
l
l
l
Eliminatestheneedfor scaffoldingto
support theWall Formwork
A three-level workingplatformfor ease
of working
Convenient workingspaceandelbow
roomavailableintheclimbingsystems
Varyingdegreesof sophistication
availabledependingonsiterequirements
Minimumskill andoperationisrequired
for anchoringandshutteringat eachlevel
Fool proof arrangement for anchoringand
safetylocksystem
17 16
L&T STAIR
TOWER SYSTEM
L&T Stair Tower isasafeandsturdier
systemusedasatemporaryaccessfor
men, materials, etc. toreachthe
receptiveheightsinconstructionsites.
The1525x2250mmheavydutytower
canbeconvertedintoaStair Tower
systemwithadditional components
suchaslandings, handrails, etc.
INTERMEDIATERAILING 225
CONNECTIONANGLE
GRIDIRON
STAIRBRACKET
2
3
4
1
1
2
0
0
1
2
0
0
1
2
0
0
1
2
0
0
1
2
0
0
1
2
0
0
1
444
3
2
Salient Features
lLight, easytohandlecomponents
lSizeinplanisonly1525mmx2250mm
lVerysafeandconvenient systemfor
accessingupto100mheight witha
provisionof bracingstopermanent
structureat every6mheight intervals
lLandingat every1.20mheight
lUsesonlyStandardHeavyDuty
Scaffoldunitsandadditional components
lShiftingof structureeasilyachieved
throughtransport devices
lBuilt-insafetytothehighest level
19 18
L&T ACCESS
SCAFFOLD SYSTEM
LABOUR PRODUCTIVITYFOR SCAFFOLDING
l0.15 manhours per cu.m
L&T AccessScaffoldSystemprovides
afreeandsafeworkingenvironment,
increasingproductivity. It contains
frames, 1.8mhigh, bracedwith
standardH225& 2H225bracingsthat
formthemainstructure. Suitable
couplersandpinsconnect individual
frameswitheachother, givingthe
tower thedesiredheight. Thetowers
areprovidedwithtower spindlesat the
bottomfor fineadjustmentsinheight
andleveling.
Thetowersprovideacontinuous
corridor for workingwiththebracings
servingashandrails. Therearenocross
membersor diagonal bracingsthat
impedefreepassageor safeworking.
Thisisanideal systemfor scaffolding
for heightsupto40m. Thewidthof the
workingplatformis1m. Thescaffold
hastobebracedwiththepermanent
structureat every4minheight.
Salient Features
lEconomical design
lLightweight, easytoerect or dismantle
usingunskilledlabour
lProvidesfreemovement for workmen
without anyobstructionat all levels
lThebracingsserveashandrailstooand
canbeeasilyfixedandremoved
lMadeupof standardweldedframeof 1.8m
lIn-built workingplatform(scaffoldboard)
lFlexibilityinheight adjustment, easyto
obtainverticalityandplumbs
lUsedfor finishingworksupto40mheight
withpermanent tiesat every4mheight
interval
11
44
33
22
4a
SPRINGLOCKEDCONNECTINGPIN
2
SCAFFOLDFRAME1.80M 1
SCAFFOLDCOUPLER
4a
3 L.D.FOOTPLATE
SCAFFOLDSPINDLE
3a
L.D.COUPLER
4
SupportingComponents
SupportingComponents
21 20
SPECIAL AND
CUSTOM BUILT
APPLICATIONS
Tailor-madeschemesareofferedusingall standard
L&T Formworkcomponentsfor special, custom-built
structures. Thiscoversformworkplanning, scheme
preparation, on-siteexecutionassistanceasper specifications
tomeet exact geometricrequirements.
L&T alsooffersdesign, fabricationandsupplyof custom-built
formworkassembliesfor specializedapplicationsandsupply
asper client'srequirement.
CustomBuilt
Structures
Special Projects
Nuclear
Projects
23 22 24

You might also like