DRILLING LOG
Kelas 1 D4 TPJJ
Bore No.
: BH-01
Bengining
: 03 Februari 2011
Ending
: 05 Februari 2011
GWL
: 2.35 m
PROJECT
LOCATION
Elevation
: 25.00 m
Bore Master
: Undang
Descriptio By
: Asep Budiman
Drilling Rig
: YBM S01
Engine
: Dompeng
Check By
Core
Recovery in (%)
Consistency
Methode
of sample
/ SPT
Depth
Description
Thickness (m)
Symbol
G.WL (M)
Thickness (m)
Scala
Depth(m)
N1
N2
N Value Graph
N
Blows=
N2+N3
(30cm)
N3
75
100
50
25
0
0.0
0.0
0.00
-0.5
-0.5
-1.0
-1.0
-0.5
-1.0
-1.5
-1.5
-1.5
2.35
-2.0
5.00
-2.5
-2.0
0.45
-2.0
-2.5
-2.5
-3.0
-3.0
-3.5
-3.5
-4.0
-4.0
0.45
-4.5
-3.0
-3.5
-4.0
-4.5
-4.5
-5.0
-5.0 5.00
-5.0
-5.5
-5.5
-6.0
-6.0
-6.5
-6.5
-7.0
-7.0
-7.5
-7.5
-8.0
-8.0
-8.5
-8.5
-8.5
-9.0
-9.0
-9.0
8.00
-9.5
-9.5
-10.0
-10.0
-5.5
-6.0
-6.5
-7.0
-7.5
-8.0
-9.5
-10.0
-10.5
-10.5
-11.0
-11.0
-11.0
-11.5
-11.5
-12.0
-12.0
0.45
-10.5
-11.5
-12.0
-12.5
-12.5
-13.0 13.00
-13.0
-13.0
-13.5
-13.5
-14.0
-14.0
0.45
-12.5
0.45
-14.5
-15.0
4.00
-14.0
-14.5
-14.5
-15.0
-15.0
-15.5
-15.5
-16.0
-16.0
0.45
-13.5
-15.5
-16.0
-16.5
-16.5
-17.0 17.00
-17.0
-17.0
-17.5
-17.5
-16.5
-18.0
2.50
-18.0
12
18
-18.0
-18.5
-18.5
-19.0
-19.0
-19.0
-19.5 19.50
-19.5
-20.0
-20.0
-18.5
0.45
-17.5
0.45
-19.5
16
21
-20.0
-20.5
-20.5
-21.0
-21.0
-21.0
-21.5
-21.5
-20.5
-22.0
5.50
-22.0
29
31
-22.0
-22.5
-22.5
-23.0
-23.0
-23.0
-23.5
-23.5
-24.0
-24.0
-24.5
-24.5
-22.5
BOR STOP
-25.0 25.00
0.45
-21.5
19
Legend :
Standard
Penetration
Test (SPT)
Undisturbed
Sample
(UDS)
Disturbed
Sample
(DS)
- Ground
Water Level
(GWL)
COHESIVE SOIL
Sand
Sandy Clay
*)
Consistency N-Value
Very Soft - 0-1
Clayey Sand
Soft - 2-4
Clay
Silt
Silty clay
Silty sand
Sones/rock/coral
Hard- 31-60
Very Hard - >60
24
20
-24.0
-24.5
-25.0
GRANULAR SOIL
N-Values
*)
Density
0-4
-Very Loose
5-10
-Loose
11-24
-Medium dense
25-50
-Dense
Dense
Stiff - 9-15
Very Stiff - 16-30
-23.5
16
>50
-Very
Dense
-25.0
ROCK QUALITY
DESIGNATION (ROD)
*)
Description - R 20%
Very Poor - <25
Poor - 25-50
Fair - 51-75
Good - 76-90
Excellent - >90
10
20
30
40
50
60
Kelas 1 D4 TPJJ
PROJECT
: Rencana Teknis Rawa
LOCATION
: Dr. Punggur Besar
PEMBORAN NO. : PGB T4-1
KEDALAMAN
: 2.00 - 2.45 m
Ukuran Contoh :
Diameter (B) =
5.5
cm
Tinggi
=
2.1
cm
Luas
=
23.76 cm2
Percobaan No. 1
2
kg/cm
n =
Tegangan Normal
0.4
t
B/B
Ac
Bacaan
Ph
menit
0
0.25
0.5
0.75
1
1.25
1.5
1.75
2
2.25
2.5
2.75
3
3.25
3.5
3.75
4
4.25
4.5
4.75
5
5.25
5.5
5.75
6
6.25
6.5
6.75
7
mm
0
0.25
0.5
0.75
1
1.25
1.5
1.75
2
2.25
2.5
2.75
3
3.25
3.5
3.75
4
4.25
4.5
4.75
5
5.25
5.5
5.75
6
6.25
6.5
6.75
7
%
0
0.45
0.91
1.36
1.82
2.27
2.73
3.18
3.64
4.09
4.55
5.00
5.45
5.91
6.36
6.82
7.27
7.73
8.18
8.64
9.09
9.55
10.00
10.45
10.91
11.36
11.82
12.27
12.73
cm2
23.76
23.65
23.54
23.43
23.33
23.22
23.11
23.00
22.89
22.79
22.68
22.57
22.46
22.35
22.25
22.14
22.03
21.92
21.81
21.71
21.60
21.49
21.38
21.27
21.17
21.06
20.95
20.84
20.73
Ring
0
68
101
115
119
124
130
136
131
125
kg
kg/cm2
JENIS TANAH
:
WARNA
:
DITEST OLEH : Mugiono
TANGGAL
: 5 September 2001
Proving ring No. :
Tegangan ring =
0.04 kg/div
Shear rate
=
1
mm per menit
Berat isi rata-rata =
gr/cm3
Percobaan No. 2
Percobaan No. 3
2
2
kg/cm
kg/cm
n =
n =
0.8
1.2
Bacaan
Ph
Bacaan
Ph
Ring
0
105
165
195
202
215
230
242
238
232
228
kg
Resume Keruntuhan :
Percobaan
Ring
0
165
195
205
225
245
265
285
292
300
295
285
280
kg/cm2
kg
Parameter geser :
kg/cm
Kohesi ( c )
=
Sudut geser dalam () =
1
2
deg.
1.000
0.800
1.00
0.600
kg/cm2
0.80
0.60
0.400
Teg.normal = 0.4 kg/cm2
0.200
0.000
0
4 5 6 7 8 9 10 11 12 13 14
Regangan Geser (B/B), %
0.40
0.20
0.00
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
Tegangan normal ( n), %
1.60
1.80
2.00
2.20