The document is a quotation from Ariel R. Dasco, PRES/GM of ARIEL R. DASCO, PEE, to Madam Asuncion V. Arceño of APMI Lagonoy School providing an estimate of PHP 182,831.22 to supply materials, labor, tools and supervision for the proposed 2nd and 3rd floor electrical system installation at the school located in San Francisco, Lagonoy, Camarines Sur. The estimate includes PHP 110,806.80 for materials, PHP 66,404.08 for labor which is 60% of materials, and PHP 5,540.34 for miscellaneous expenses at 5% of materials.
The document is a quotation from Ariel R. Dasco, PRES/GM of ARIEL R. DASCO, PEE, to Madam Asuncion V. Arceño of APMI Lagonoy School providing an estimate of PHP 182,831.22 to supply materials, labor, tools and supervision for the proposed 2nd and 3rd floor electrical system installation at the school located in San Francisco, Lagonoy, Camarines Sur. The estimate includes PHP 110,806.80 for materials, PHP 66,404.08 for labor which is 60% of materials, and PHP 5,540.34 for miscellaneous expenses at 5% of materials.
The document is a quotation from Ariel R. Dasco, PRES/GM of ARIEL R. DASCO, PEE, to Madam Asuncion V. Arceño of APMI Lagonoy School providing an estimate of PHP 182,831.22 to supply materials, labor, tools and supervision for the proposed 2nd and 3rd floor electrical system installation at the school located in San Francisco, Lagonoy, Camarines Sur. The estimate includes PHP 110,806.80 for materials, PHP 66,404.08 for labor which is 60% of materials, and PHP 5,540.34 for miscellaneous expenses at 5% of materials.
We are please to submit herewith our quotation for the proposed 2 nd and 3 rd floor Electrical System for the APMI Lagonoy School, San Francisco, Lagonoy, Camarines Sur in the amount of ONE HUNDRED EIGHTY TWO THOUSAND EIGHT HUNDRED THIRTY ONE and 22/100 PESOS (182,831.22) to supply Materials and Labor tools and supervision.
Terms of payment to be arrange later.
Hoping for your kind consideration and approval.
Very truly yours,
ARIEL R. DASCO, PEE PRES/GM
DESIGN ESTIMATE INSTALLATION SUPPLIES 079 Pedro Israel St. San Vicente, Lagonoy, Camarines Sur
RECAPITULATION
Total Material Cost ------------------------------------------------------------------ P 110,806.80 Labor Cost (60% of Total Material Cost) ----------------------------------------- P 66,404.08 Miscellaneous Expenses (5% of Total Material Cost) -------------------------- P 5,540.34 _______________________________________________________________________
Total (Electrical Cost) --------------------------------------------------------------- P 182,831.22