DAFTAR PUSTAKA

Hartman, Howard L. 1987. Introductory Mining Engineering. United State of America :


John Wiley & Sons. Inc. (hal 124, 127)
Hemphil, Gary B. 1981. Blasting Operations., United State of America : McGraw-Hill
Book Company.
Hustrulid, William. 1999. Blasting Principles for Open Pit Mining Vol-1 General
Design Concepts. Netherlands : A. A. Balkema, Rotterdam. (hal 73 90)
Konya, Calvin J. 1990. Surface Blast Design. United State of America : Prentice-Hall,
Inc. (hal 13, 74, 117 129)
Kurniawan, Lilik Dkk. 2004. Modul Perkuliahan Teknik Peledakan. Banjarbaru : Teknik
Pertambangan Universitas Lambung Mangkurat.
Suwandi, Awang. 2004. Modul 1 Pengetahuan Dasar bahan Peledak, Pendidikan Dan
Pelatihan Juru Ledak Penambangan Bahan Galian. Bandung : Departemen
Energi Dan Sumberdaya Mineral R.I. Badan Pendidikan Dan Pelatihan Energi
Dan Sumberdaya Mineral Pusdiklat Teknologi Mineral Dan Batubara.

LAMPIRAN E
DENAH GUDANG BAHAN PELEDAK

LAMPIRAN C
KLASIFIKASI DETONATOR NONLISTRIK
PRODUK ORICA-AUSTRALIA

KLASIFIKASI SURFACE DELAY


Delay time (ms)
J-hook colour
9
Green
17
Yellow
25
Red
42
White
65
Blue
100
Orange
125
Cream
150
Mustard
175
Lime
200
L.green
Sumber : Orica-Australia
KLASIFIKASI INHOLE DELAY
Delay
Number
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

MS Delay Time
(MS)
0
25
50
75
100
125
150
175
200
250
300
350
400
450
500
600

LP Delay Time
(MS)
25
200
400
600
1000
1400
1800
2400
3000
3800
4600
5500
6400
7400
8500
9600

J-Hook Colour
Dark green
Red
Pink
Tan
Orange
Cream
Yellow
Lime
Light green
Green
Aqua
Light blue
Blue
Mauve
Purple
Hot pink
Sumber : Orica-Australia

LAMPIRAN B
FOTO BAHAN, PERALATAN, DAN PERLENGKAPAN PELEDAKAN

Detonator Non Listrik, Surface Delay

Detonator Non Listrik, Inhole Delay

AN kemasan 1200 kg

Power Gel

Detonator Listrik Langsung

Kartu Izin Meledakkan (KIM)

Blasting Machine

Bunker

LAMPIRAN D
FOTO PROSES PELEDAKAN

Final check

Sebelum peledakan

Peledakan

Sesudah Peledakan

Sambungan pada Connector Block

Detonator yang telah meledak

LAMPIRAN A
PERHITUNGAN GEOMETRI PELEDAKAN

1.

menurut C.J. Konya

a. Burden (B)
B = 3,15 De (SGe/SGr)0,33

De = diameter handak (in)

= 3,15 x 6,75 in (0,8/2,2) 0,33

SGe = density handak (gr/cc)

= 15,227 ft

SGr = density batuan (gr/cc)

= 4,64 m
b. Spasi (S)
S = 1,4 B
= 1,4 x 4,64 m
= 6,496 m
c. Stemming (T)
T = 0,7 B
= 0,7 x 4,64 m
= 3, 248 m
d. Sub drilling (J)
J

= 0,3 B
= 0,3 x 4,64 m
= 1,392 m

e. Tinggi Jenjang (H)


H = 5 x diameter isian handak
= 5 x 6,75 in
= 33,75 ft
= 10,287 m
f. Loading density (de)
de = 0,34 x SGe x De2
= 0,34 x 0,8 gr/cc x 6,752in
= 12,393 lb/ft ,
= 18,44 kg/m

di mana 1 lb/ft = 1,488 kg/m

g. Kedalaman (L)
L =H+J
= 10,287 m + 1,392 m
= 11,679 m
h.

Powder column (PC)


PC = L T
= 11,679 m - 3, 248 m
= 8,431 m

i. Volume batuan yang akan dibongkar (VR) dan jumlah lubang (n)
VR

=BxSxHxn

30.000

= 4,64 x 6,496 x 10,287 x n

= 97

j. Berat bahan peledak (E)


E = PC x de x n
= 8,431 m x 18,44 kg/m x 97
= 15.080,36 kg
k. Berat batuan yang diledakkan (W)
W = VR x densitas batuan yang diledakkan
= 3.000 m3 x 2,2 ton/m3
= 66.000 ton
l.

Powder factor (PF)


PF = E/W
= 15.080,36 kg /66.000 ton
= 0,23 kg/ton

2.

menurut R.L. Ash

a. Burden (B)
B = Kb . De/12 , di mana Kb = 25 jika memakai ANFO
= 25 x 6,75 /12
= 14,0625 ft
= 4,28 m
b. Spacing (S)
S = Ks . B
= 1,15 x 4,28 m

Ks = spacing ratio = 1 1,5


untuk pola staggered, Ks = 1,15

= 4,92 m
c. Stemming (T)
T = KT . B
= 0,7 x 4,28 m

KT = stemming ratio = 0,5 1


KT = 0,7 (rata-rata)

= 2,99 m
d.

Sub drilling (J)


J1 = KJ . B

KJ = sub drill ratio = 0,2 0,3

= 0,2 x 4,28 m
= 0,856 m
J2 = 0,3 x 4,28 m
= 1,284 m
JR = (J1+J2)/2
= (0,856+1,284)/2
= 1,07 m
e. Kedalaman lubang (L)
L = Kh . B
= 2,6 x 4,28 m

Kh = hole depth ratio = 1,5 - 4


Kh rata-rata = 2,6

= 11,128 m
f.

Tinggi jenjang (H)


H =LJ
= 11,128 m 1,07 m
= 10,058 m

g.

Powder column (PC)


PC = L T
= 11,128 m - 2,996 m
= 8,132 m

h. Loading density (LD)


LD = D2 x handak x 0,1
= x 3,14 x (17,1)2 x 0,8gr/cc x 0,1
= 18,36 kg/m
i. Volume batuan yang diledakkan (VR ) dan jumlah lubang (n)
VR

=BxSxHxn

30.000 = 4,28 m x 4,92 m x 10,058 m x n


n

= 142

j. Berat handak (E)


E = PC x LD x n
= 8,132 m x 18,36 kg/m x 142
= 21.201,1 kg
k. Berat batuan yang diledakkan (W)
W = VR x densitas batuan
= 30.000 m3 x 2,2 ton/m3
= 66.000 ton
l. Powder factor (PF)
PF = E/W
= 21.201,1 kg /66.000 ton
= 0,32 kg/ton
3. PT TAJ
1. Data Geometri
Burden (B)

=5m

Spacing (S)

= 6,5 m

Diameter lubang lubang ledak = 6,75 inch = 17,1 cm


Kedalaman (L)

= 1,5B = 7,5m

Stemming (T)

= 0,5B = 2,5m

Subdrilling (J)

= 0,1B = 0,5m

Tinggi jenjang (H) = L J = 7,5 0,5 m =7 m


Panjang isian bahan peledak (PC) = L T = 7,5 m 2,5 m = 5 m
ANFO

= 0,8 g/cc

Densitas batuan

= 2,2 gr/cc

2. Perhitungan Bahan peledak


Loading density

= (D)2 x ANFO x 0,1


= . 3,14 . (17,1 cm)2 x 0,8 g/cc x 0,1
= 18,36 kg/m

Berat ANFO per lubang = loading density x PC


= 18,36 kg/m x 5 m
= 91,8 kg
-

Target volume batuan yang dibongkar adalah 30.000 ton/hari, maka :


VR

=BxSxHxn

30000

= 5 x 6,5 x 7 x n

= 30000/227,5
= 131,9 lubang 132 lubang

Jumlah kebutuhan ANFO = 91,8 kg x jlh lubang


= 91,8 kg x 132
= 12.117,6 kg
-

Berat batuan yg akan dibongkar

= VR x densitas batuan
= 30.000 m3 x 2,2 ton/m3
= 66.000 ton

Powder factor

= berat handak total(kg)/volume batuan(kg)


= 12.117,6 kg / 66.000 ton
= 0,18 kg/ton