You are on page 1of 2

Se.

No Description Unit Rate


Labour
L-01 Labour USK D 800.00
L-02 Labour SSK D 900.00
L-03 Labour SK D 1,200.00
L-04 Bar bender D 1,200.00
L-05 Carpenter D 1,200.00
L-06 Welder D 1,200.00
Tools
O-01 Allow for tools 2.50%
O-02 Shoring Allow
O-03 Labour space blocks 10%
Materials
M-01 Soil Type 1 CuM 477.03
M-02 Soil Type 2 CuM 477.03
M-03 Top Soil cum 400.00
M-04 Clay CuM 1,236.75
M-05 Sand CuM 4,240.28
M-06 Tor-Steel Mt 125,000.00
M-07 ABC CuM 1,837.46
M-08 19 mm Metal CuM 2,120.14
M-09 37.5 mm Metal CuM 1,943.46
M-10 Rubble CuM 1,060.07
M-11 Boulders CuM 908.13
M-12 Crushed stone - Backfill material CuM 1,943.46
M-13 Crushed stone filter material CuM 1,943.46
M-14 Granular material Cu.M 2,120.14
M-15 Metal 100mm Cu.M 1,766.78
M-16 Metal 50mm Cu.M 1,837.46
M-17 Porus Aggregate CuM 2,120.14
M-18 Rip-rap material 100-500 mm CuM 1,060.07
M-19 Graded aggregate Cu.M 2,120.14
M-20 Chocker stone 20mm Cu.M 2,120.14
M-21 Asphalt wearing 19mm/(mt) MT 10,300.00
M-22 Asphalt Binder MT 9,750.00
M-23 Baricade tapes kg 500.00
M-24 Bearing pads 150mm x 13mm L.m 2,000.00
M-25 Cement Bag 900.00
M-26 Cement (Bulk) MT 18,000.00
M-27 Bituminous Mastic Filler ltr 250.00
M-28 CRS-01 Ltr 122.00
M-29 MC 30 Ltr 126.50
M-30 Diesel Ltr 116.00
M-31 Petrol Ltr 150.00
M-32 LP Gas No 2,500.00
M-33 Kerosine Ltr 80.00
M-34 Fertilizer kg 75.00
M-35 Paint Item 500.00
M-36 1.5" dia 3mm thick round bar GI Nos 4,500.00
M-37 10mm dia 70mm MS rods l.m 250.00
M-38 12mm thick steel Lugs nos 70.00
M-39 25mm stainless Steel L.m 2,500.00
M-40 25mm milds Steel L.m 500.00
M-41 3/4" Box iron Bar Nos 1,750.00
M-42 4" dia 3mm thick round bar GI Nos 12,500.00
M-43 Acrojack No 3,800.00
M-44 AL end caps for 3/4" roud bar Nos 75.00
M-45 AL end caps for 4" roud bar Nos 750.00
M-46 Aluminioum Sheet 250mm l.m 125.00
M-47 Angle Iron 50x50x6 l.m 2,000.00
M-48 Binding wire kg 200.00
M-49 Cutting Weel Nos 1,500.00
M-50 Wire nails kg 200.00
M-51 Water Allow 100.00
M-52 15 mm thick plywood Sq.M 954.86
M-53 Class II timber joists etc ft 60.00
M-54 Explosive Sum 500.00
M-55 Gabion Box nr 4,250.00
M-56 Geo-Textile Sq.M 450.00
M-57 Polythene Displacer L.m 100.00
M-58 Bridge Kerb Nos 1,500.00
M-59 Pre-Cast Kerb K1 No 636.54
M-60 Pre-Cast kerb K2 No 636.54
M-61 Pre-Cast kerb K3/K4 No 636.54
M-62 Coupling No 446.43
M-63 Hand-Rails L.m 1,545.00
M-64 Up-righhs No 1,545.00
M-65 kilometer post nr 5,600.00
M-66 Con pipe 100mm dia L.m 1,500.00
M-67 Con pipe 150mm dia L.m 1,800.00
M-68 Conc. pipe 600mm dia L.m 10,000.00
M-69 Conc. pipe 900mm dia L.m 16,000.00
M-70 Conc. pipe 1200mm dia L.m 32,000.00
M-71 Pre-cast pre-stressed beam 5.20m No 29,870.00
M-72 Pre-cast pre-stressed beam 6.10m No 39,140.00
M-73 Pre-cast pre-stressed beam 7.01m No 42,745.00
M-74 Pre-cast pre-stressed beam 9.50m No 66,950.00
M-75 Pre-cast pre-stressed beam 10.7m No 65,920.00
M-76 Pre-cast pre-stressed beam 11.50m No 72,100.00
M-77 Pre-cast pre-stressed beam 13.50m No 87,550.00
M-78 Pre-cast pre-stressed beam 14.50m No 123,600.00
M-79 Pre-cast pre-stressed beam 19.00m No 178,190.00
M-80 Pre-cast pre-stressed beam 25.00m No 618,000.00
M-81 PVC 100 mm T600 L.m 533.33
M-82 PVC 75 mm T600 L.m 458.33
M-83 PVC pipe 110 mm dia. L.m 1,340.00
M-84 PVC pipe 150 mm dia. L.m 2,083.00
M-85 Reflecting Studs No 700.00
M-86 Road Marking Sq.M 1,500.00
M-87 Rubber sheet 12x75 l.m 400.00
M-88 Sign boards nos 4,000.00
M-89 Single pole, sign area up to 0.5m2 nr 9,500.00
M-90 Double pole, sign area up to 2.0m2 nr 19,000.00
M-91 Chevron warning sign nr 7,500.00
M-92 Welding rods kg 250.00
M-93 Safety helmets Jacket and Boots Kit 1,500.00
M-94 Night lamps nr 400.00
M-95 Traffic cones nr 1,450.00
M-96 Painted barrel nr 750.00
M-97 Bearing pads '75mm x 12mm l.m
M-98 Concrete G 20 cu.M
M-99 Excavation & Backfilling cu.M
M-100 Form- Work Sq.M 2,106.00
M-101 PVC pipe 50 mm dia. L.m 185.00
M-102
Equipments
E-01 Motor Grader Hr 3,928.00
E-02 Roller 10Ton Hr 3,660.00
E-03 Water Bowser 10000 ltr D 12,000.00
E-04 JCB Hr 2,100.00
E-05 6 wheel for day hire D 8,500.00
E-06 Roller 4Ton Hr 1,800.00
E-07 Tractor D 3,500.00
E-08 Compressor air CFM 175 D 7,600.00
E-09 Sprayer D 12,000.00
E-10 Pneumatic Roller Hr 2,522.00
E-11 Asphalt Paver Hr 6,772.00
E-12 Rammer D 2,000.00
E-13 Water pump D 4,210.00
E-14 Power Saw D 3,000.00
E-15 Concrete breaker D 3,500.00
E-16 EX 120 Hr 2,800.00
E-17 Concrete mixer D 5,856.00
E-18 Poker D 2,261.00
E-19 Bar Bending Machine & Cutter Mt 3,750.00
E-20 Roller 1-3Ton D 5,000.00
E-21 Welding plant D 3,500.00
E-22 Electric drill D 500.00
E-23 Generator D 4,500.00
E-24 Mobile Crane 20Ton Hr 5,500.00
E-25 Light Tower D 6,500.00
E-26 Steel Cutter D 2,000.00
E-27 Loader Hr 2,800.00
E-28 Generator for over haed - 25KVA Month 25,000.00
E-29 1 cube lorry D 6,000.00
E-30 D4 dozer Hr 3,500.00
E-31 Low bed Trailer km 500.00
E-32 Water bowser tractor mounted D 2,500.00
E-33 Ex 200 Hr 3,600.00
Transport
T-01 Transport - Soil Type 1 CuM.km 14.13
T-02 Transport - Soil Type 2 CuM.Km 14.13
T-03 Transport - ABC CuM.km 14.13
T-04 Transport - Emulsion Drum 375.00
T-05 Transport - Sand CuM.km 14.13
T-06 Transport - Asphalt MT.km 10.00
T-07 Transport - Cement Bag 70.00
T-08 Transport - 37.5 mm Metal CuM.km 14.13
T-09 Transport - 19 mm Metal CuM.km 14.13
T-10 Transport - Tor-Steel Mt 2,500.00
T-11 Transport - Crushed stone - Backfill material CuM.km 14.13
T-12 Transport - Crushed stone filter material CuM.km 14.13
T-13 Transport - Conc. Pipe Nos 4,000.00
T-14 Transport - Rubble CuM.km 14.13
T-15 Transport - Precast Items Day 18,000.00
T-16 Transport - Beams sum 10,000.00
T-17 Transport - Top Soil Cu.M.km 14.13
T-18 Transport - Granular material Cu.M.km 14.13
T-19 Transport - Metal 100mm Cu.M.km 14.13
T-20 Transport - Metal 50mm CuM.km 14.13
T-21 Transport - Chocker stone 20mm CuM.km 14.13
T-22 Transport - Porus Aggregate CuM.km 14.13
T-23 Transport - Boulders CuM.km 14.13
T-24 Transport - Clay CuM.km 14.13
T-25 Transport - Graded aggregate CuM.km 14.13
Transport - Graded aggregate