During a 3-year project, EIC refurbished the mechanical and electrical systems of the medieval castle, church, and private areas on St Michael's Mount, a tidal island off the coast of Cornwall. The main challenges were working on a protected National Trust property and the island being cut off during high tides. EIC replaced pipework, installed a new switch room and electrical/mechanical systems, and upgraded the boilers, ventilation, heating, plumbing and alarm systems. The project was completed on time and budget while preserving the existing building.
Original Description:
Case study outlining EIC's work on the castle at St Michael's Mound
During a 3-year project, EIC refurbished the mechanical and electrical systems of the medieval castle, church, and private areas on St Michael's Mount, a tidal island off the coast of Cornwall. The main challenges were working on a protected National Trust property and the island being cut off during high tides. EIC replaced pipework, installed a new switch room and electrical/mechanical systems, and upgraded the boilers, ventilation, heating, plumbing and alarm systems. The project was completed on time and budget while preserving the existing building.
During a 3-year project, EIC refurbished the mechanical and electrical systems of the medieval castle, church, and private areas on St Michael's Mount, a tidal island off the coast of Cornwall. The main challenges were working on a protected National Trust property and the island being cut off during high tides. EIC replaced pipework, installed a new switch room and electrical/mechanical systems, and upgraded the boilers, ventilation, heating, plumbing and alarm systems. The project was completed on time and budget while preserving the existing building.
Project Services Summary St Michaels Mount is a tidal island 366 m (400 yd) off the Mounts Bay coast of Cornwall, passable between mid-tide and low water. During this three year project, EIC totally refurbished the mechanical and electrical installation of the medieval castle, church and private areas on St Michaels Mount. Working on a National Trust property brings unique challenges in the form of regulation and other specifc requirements. In this case, the main challenge was the Mount being almost cut-off from the mainland during high tides. The two areas of the castle share the same mechanical and electrical services, with the majority of the services run underneath the causeway and the Hoval Uno-3 effciency boilers topped up with oil transported from the mainland. In addition to replacing pipework using compression fttings, EIC also completed the total refurbishment of the mechanical and electrical installations at St Michaels Mount. Project Summary Electrical: New island switch room, LV mains switchgear, distribution and small power lighting, emergency lighting, intruder and fre alarm systems, aerials, voice and data system. Mechanical: New boiler rooms, ventilation and heating, hot and cold services, sanitary ware and underground drainage Sector - Leisure Site/Location - Marazion, Penzance, Cornwall Project duration - 3 years Principal contractor - Godolphin Company Contract value - 675,000 EIC helps restore the magnifcent St Michaels Mount St Michaels Mount Results The project was completed within time constraints and budget, with particular consideration given to the existing furnishings and fabric of the building. The location was challenging, but with rigorous planning from the outset we understood the problem and put effective measures in place. - Damian Salmon, Regional Director