You are on page 1of 1

Performance Contract Proves Savings

PROJECT NAME
Performance Contracting

PROJECT LOCATION
Atlanta, Georgia

PROJECT TEAM
Owner: T3 Labs
(Translational Testing and
Training Laboratories, Inc.)
Engineer: McKenneys, Inc.

SPECIALIZATIONS
Design/Build
bdoc
Energy Management

MARKETS
Healthcare
Central Plants
Performance Contractor

M
cKenneys helped T3 Labs THE SOLUTION Then, modifications were made to equipment
reduce energy consumption McKenneys introduced a performance and controls to reduce energy consumption.
and operating costs at its contractit had to prove monthly operating
facility in Atlanta, Georgia. cost savings before billing for work. M
cKenneys THE RESULTS
financed the initiatives, which would only The facility is on track to reduce utility costs
THE CHALLENGE be repaid if objectives were met. The team from more than $13 per square foot to less
Energy costs for the building were a drain created a model of the buildings energy than $9. The institute has saved over 40 per-
on the operating budget. Limited cash flow systems along with a benchmark to compare cent on utility bills in the first eight months.
meant funding was not available for energy past and future utility consumption using Its expected to save nearly $200,000 annu-
conservation initiatives. bdoc ValidateTM, a utility dashboarding tool. ally and more than $1,200,000 over the life
of the performance contract.

404-622-5000 704-357-1200
info@mckenneys.com info@mckenneys.com
1056 Moreland Industrial Boulevard 3601 Performance Road
Atlanta, Georgia 30316 www.mckenneys.com Charlotte, North Carolina 28214
2014 McKenneys, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenneys, Inc. and the McKenneys, Inc. logo are registered trademarks of McKenneys, Inc. All other trademarks are the property of their respective owners.
The content of this document is not intended as an endorsement.

You might also like