plumbing and medical gas sys- tems for a community hospital part of a larger regional healthcare system. THE CHALLENGE The owner of this small, rural county hospital faced signicant cost pressure. To ensure the project would not exceed budget limitations, the owner instructed McKenneys to design HVAC, plumbing and medical gas systems that performed to minimum building code requirementsrather than the more costly standards of the broader healthcare system. THE SOLUTION By using its design/build expertise, the McKenneys team was able to reduce the cost of all mechanical systems. For instance, the team selected direct expansion roof top units with variable air volume (VAV) and heat/re-heat hydronic coils for low-cost HVAC efciency. Piping mains were kept intentionally small and VAV ex was eliminated to minimize seismic restraints labor and material costs. Additional savings were realized by designing the duct system with the static regain method thus minimizing the total quantity of ductwork. THE RESULTS The owners savings goals were achieved and the mechanical systems are performing to specication. Trimming Cost, Delivering Solutions PROJECT NAME
Community Hospital Design/Build PROJECT LOCATION
Wadesboro, North Carolina PROJECT TEAM
Owner: Multi-State Healthcare System
General Contractor: Braseld & Gorrie
Architect: Design Strategies LLC
Engineer: McKenneys, Inc. SPECIALIZATIONS Building Information Modeling Design/Build Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS
Healthcare The content of this document is not intended as an endorsement. www.mckenneys.com 2014 McKenneys, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenneys, Inc. and the McKenneys, Inc. logo are registered trademarks of McKenneys, Inc. All other trademarks are the property of their respective owners. 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214