Professional Documents
Culture Documents
PROJECT NAME
Domestic Water
Decentralization at Donaldson
Maximum-Security Facility
PROJECT LOCATION
Bessemer, Alabama
PROJECT TEAM
Owner: Alabama Department
of Corrections
Performance Contractor:
NORESCO
Turnkey Design Builder:
McKenneys, Inc.
SPECIALIZATIONS
Building Information Modeling
Design/Build
Plumbing Shop Prefab
Energy Management
Pipe Shop Prefab
MARKETS
Performance Contractors
Government
THE CHALLENGE
With no up-to-date drawings to indicate current service and systems locations, McKenneys
developed the energy conservation measures
(ECM) to decentralize the existing hot and
cold domestic water system and installed new
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
www.mckenneys.com
2014 McKenneys, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenneys, Inc. and the McKenneys, Inc. logo are registered trademarks of McKenneys, Inc. All other trademarks are the property of their respective owners.
The content of this document is not intended as an endorsement.