Team Accelerates Coil Refit

PROJECT NAME
Chilled Water Coil
Replacement Project
PROJECT LOCATION
Charlotte, North Carolina
PROJECT TEAM
Owner: Utility Holding Company
Contractor: McKenneys, Inc.
SPECIALIZATIONS
Design/Build

Pipe Shop Prefab
MARKETS
Mission Critical
Commercial Office
Central Plants

cKenneys replaced nine


chilled water coils in 34-yearold air handling units (AHUs)
located in an operation center for a large,
public service company.
THE CHALLENGE
The facility required zero downtime during
occupied hours, which gave the team
only 30 hours on weekends to complete
the project. The AHUs overhaul took place
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316

in small, 200-square-foot mechanical rooms


and the team knew it had to act quickly
and decisively as it worked alongside other
trades. In addition, an awkward piping
configuration restricted prefabrication work
and the condition of the area under the coils
was unknown.
THE SOLUTION
With design plans and detailed schedules
in place, the McKenneys team accelerated

www.mckenneys.com

AHU replacements. New custom-built


stainless steel drain pans were also fabricated
to fit inside the existing pan to support the
weight of the replacement coils.
THE RESULTS
The project was completed on time and
on budget. The AHUs are now running
more efficiently, saving energy and operational costs.
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214

2016 McKenneys, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenneys, Inc. and the McKenneys, Inc. logo are registered trademarks of McKenneys, Inc. All other trademarks are the property of their respective owners.
The content of this document is not intended as an endorsement.

You might also like