You are on page 1of 11

SCHEDULE-I

TECHNICAL PROPOSAL PARTICULARS


CONTENTS

SCHEDULES DESCRIPTION

SCHEDULE-I/1 TECHNICAL PARTICULARS

SCHEDULE-I/2 GUARANTEED DATA

SCHEDULE-I/3 SPECIAL TOOLS & TACKLES

SCHEDULE-I/4 DRAWING SUBMISSION SCHEDULE

SCHEDULE-I/5 DEVIATION SHEET CONDITION OF CONTRACT( SECTION-I)

SCHEDULE-I/6 DEVIATION SHEET TECHNICAL SPECIFICATION (SECTION-II)


SCHEDULE-I/1

TECHNICAL PARTICULARS
FOR
SLUICE GATES

(Bidder to fill up separately for each type of Sluice gate)

1.00.00 GENERAL

1.01.00Service :

1.02.00Nominal size (NB) :

1.03.00Duty :

1.04.00Type :

2.00.00PERFORMANCE CAPABILITY

2.01.00Operating force (kg) :

2.02.00Leakage rate :

) :

3.00.00DESIGN AND CONSTRUCTION

3.01.00 Design standard :

3.02.00 Design maximum level difference at the bottom of the gate opening (MWC)
:

3.03.00Design level difference from centre-line of the gate up to the operating platform:

3.04.00Design temperature (`C) :

4.00.00MATERIAL OF CONSTRUCTION

4.01.00Gate frame :

4.02.00Gate :

4.03.00Spindle :

4.04.00Seat :

4.05.00 Seal :

( Sch-I/1 : 1
SCHEDULE-I/1

4.06.00 Headstock :

4.07.00Hand wheel :

4.08.00 Submerged / embedded fasteners / hardware :

4.09.00 Wall thimble :

5.00.00INSPECTION AND TESTING

5.01.00Leak test : Yes/No.

5.02.0 Chemical analysis / physical properties of materials: Yes/No

7.00.00Weight of complete assembly (kg) :

.............................................
Bidder’s Stamp & Signature

( Sch-I/1 : 2
SCHEDULE-I/2

GUARANTEE DATA

(Bidder to fill up separately for each type of Sluice gate)

Bidder to fill up the particulars in the format as specified below for Sluice gate offered,
mentioning location

1. Leakage rate for specified level difference.

2. Opening force for the specified level difference

3. Closing force for the specified level difference

.............................................
Bidder’s Stamp & Signature

Sch-I/2 :3
SCHEDULE-I/3

SPECIAL TOOLS & TACKLE

Bidder shall tabulate below item-wise list of all special tools and tackle for
operation, maintenance and replacement of equipment and components supplied
under the specification with itemised prices. All tools and tackle supplied shall be
totally new and be complete with required containers and boxes. Additional sheets
may be used, if required.

The bidder shall furnish the following schedule separately for each equipment, as
have been marked and defined in various Sections in the technical specification.
If for any equipment, the bidder has to add any other relevant information, the
same shall be indicated herein.

Sl. Description Quantity Unit price delivered


No. offered at site (Rs.)

.............................................
Bidder’s Stamp & Signature

Sch-I/3 : 4
SCHEDULE-I/4

DRAWING SUBMISSION SCHEDULE

The bidder shall furnish a comprehensive drawing submission schedule covering all
equipment, as indicated in various sections of the Technical Specifications. Drawings which
are required earlier for design of civil work and engineering of other auxiliary systems shall
be given sufficiently in advance.

Sl. Description Submission date from date of


No. Letter of Intent
Preliminary Final

.............................................
Bidder’s Stamp & Signature

( Sch-I/4 : 5
SCHEDULE-I/5

DEVIATION SHEET : CONDITION OF CONTRACT (SECTION – I)

If the proposal has got any deviation from the Conditions Of Contract, the Bidder shall
tabulate these deviations clause by clause in this Schedule. Add more sheets, if required.

Against each and every deviation from the Conditions Of Contract, the amount by which the
Bid Price will thereby be increased or decreased in case of withdrawal of deviation shall be
intimated clause by clause in this schedule. In case the amount is not mentioned in this
Schedule against any of this deviation mentioned in deviation sheet, it will be taken for
granted that the same does not involve any change in the Bid Price.

Add more sheets, if required.

Clause No. Deviations


Amount by which the Bid price will change

Decrease (*)
Increase (*)

We hereby confirm that the above are only deviations from the Conditions Of Contract and
apart from these deviations, all other clauses of Conditions Of Contract, Section – I, are
acceptable to us and are taken care of in the Contract Price.

NOTE : (*) For the currency of the bid, Bidder is suggested to refer the relevant
clauses of Conditions of Contract, Section – I of this Bid Documents.

.............................................
Bidder’s Stamp & Signature

( Sch-I/5 : 6
SCHEDULE-I/6

DEVIATION SHEET TECHNICAL SPECIFICATION (SECTION-II)

If the proposal has got any deviation from the technical specification, the Bidder shall
tabulate these deviations clause by clause in this schedule.

Against each and every deviation from the Technical Specification, the amount by which the
Bid Price will thereby be increased or decreased in case of withdrawal of deviation shall be
intimated clause by clause in this schedule. In case the amount is not mentioned in this
Schedule against any of this deviation mentioned in deviation sheet, it will be taken for
granted that the same does not involve any change in the Bid Price.

Add more sheets, if required.

Clause No. Deviations Amount by which the Bid price will change
Increase (*)
Decrease (*)

We hereby confirm that above are only technical deviations form Purchaser’s tender
specification. Apart from these deviations, all other technical stipulations of specification are
acceptable to us and are taken care of in the Contract Price.

NOTE : (*) For the currency of the bid, Bidder is suggested to refer the relevant
clauses of Conditions of Contract, Section – I of this Bid Documents.

.............................................
Bidder’s Stamp & Signature

Sch-I/6 : 7
SCHEDULE – II

PRICE SCHEDULE
CONTENTS

SCHEDULES DESCRIPTION

SCHEDULE-II/1 PRICE BREAK-DOWN SHEET

SCHEDULE-II/2 NA

SCHEDULE-II/3 SPARE PARTS PRICE SHEET (RECOMMENDED)

SCHEDULE-II/4 SPECIAL TOOLS AND TACKELS PRICE SHEET

You might also like