You are on page 1of 29

Ore intercept compositing 209

Construction of cross sections - 218


Step 5. The pit outline is superimposed on the section 219
Use of hatch pattern - 221
Pit and tonnage, Pit and volume calculations 227
Basic bench geometry 290
Shovel working range - 296
ORE ACCESS - Ramp access for the example orebody 297
The Pit Expansion Process 310
Minimumrequired operating room for parallel cuts - 316
Pit slope geometry 323
Geomechanical background-planar failure - 333
Design of spiral road (inside,outside) and plan, section view of 4 bench pit width ramp 356
Stripping ratios 389
Pit limits 411
Blast design Rock Blasting 759

You might also like