Step 5. The pit outline is superimposed on the section 219 Use of hatch pattern - 221 Pit and tonnage, Pit and volume calculations 227 Basic bench geometry 290 Shovel working range - 296 ORE ACCESS - Ramp access for the example orebody 297 The Pit Expansion Process 310 Minimumrequired operating room for parallel cuts - 316 Pit slope geometry 323 Geomechanical background-planar failure - 333 Design of spiral road (inside,outside) and plan, section view of 4 bench pit width ramp 356 Stripping ratios 389 Pit limits 411 Blast design Rock Blasting 759
DAO96-40 (IRR of RA 7940) Pursuant to PD No. 705, as amended, and E.O. No. 192
dated 10 June 1987, and in consonance with the sustainable
development thrust of the Government, a Log Control and Monitoring
System in the DENR is hereby adopted and the following guidelines are
hereby issued for the information of all concerned.
What is an Exploration Permit?
An Exploration Permit (EP) is an initial mode of entry in mineral exploration allowing a
Qualified Person to undertake exploration activities for mineral resources in certain areas
open to mining in the country.
Primer Ftaa What is an Exploration Permit?
An Exploration Permit (EP) is an initial mode of entry in mineral exploration allowing a
Qualified Person to undertake exploration activities for mineral resources in certain areas
open to mining in the country.