A factory update listed challenges including missing parts, faults, and leaks. Actions taken were replacing a missing bolt and fixing a feed pipe leakage. Guidance for night staff included monitoring lubrication levels, observing a repair, and cleaning equipment to ensure proper operation.
A factory update listed challenges including missing parts, faults, and leaks. Actions taken were replacing a missing bolt and fixing a feed pipe leakage. Guidance for night staff included monitoring lubrication levels, observing a repair, and cleaning equipment to ensure proper operation.
A factory update listed challenges including missing parts, faults, and leaks. Actions taken were replacing a missing bolt and fixing a feed pipe leakage. Guidance for night staff included monitoring lubrication levels, observing a repair, and cleaning equipment to ensure proper operation.
1. Missing bolt on 331CV303 2. Missing circlip at 331CV500 3. 441RF662 return fault 4. Faulty air blaster at kiln inlet 5. Cyclone 5 feed pipe leakage at kiln inlet 6. Bucket elevator booth leaking
Key Actions Taken: 1. 331CV303 missing bolt replaced by mechanical 2. 3. 441RF662 checked by electrical. Currently under observation. 4. 5. Feed pipe leakage boxed and casted 6.
Guidance for Night Operation: 1. Lubrication oil level for ID fan bearing should be closely monitored 2. Casting at cyclone 5 feed pipe should be observed following casting 3. Cleaning of burning zone pyrometer and kiln camera 4. Rhino horn on main burner should be cleaned Best regards,