New for MineSight

Economic Planner
Presentation by Jose Sanchez
Workshop overview
MSEP enhancements
MSEP workflow
Analyzing MSEP results
Workshop overview
MSEP enhancements
MSEP workflow
Analyzing MSEP results
MSEP enhancements
Expanded GSF
200 pits!
Design
Series/AutoP/Starter pit
MSVALP
Series/Worst Scheduling
MSEP expanded GSF
200 pits!
No need for
multiple GSF
files
Easily create
GSF using
procedure
p60110.dat
Support for
old GSF files
Additional items
More TOPO
items TOPO1-
TOPO5
More Area
items AREA1-
AREA5
More slope
estimate items
Complex slopes
Continues to
support
current slopes
Soon to allow
more slope
detail
MSOPITCreating a series of pits
O
P
T
I
O
N
S

Multi-Run using BASE option
BASE option for selected areas
MULTP limit pushback size
MULTV vary value
MULTZ vary bottom elevation
AUTOP pushbacks limited by face angle
BASE - option with vary prices feature
Starter pit for AUTOP and MULTP options
Design a series of pits
Determine the ultimate pit limit
Develop phases for scheduling
BASE option with vary price feature
Scheduling with economic sequential pits
THE GAP
360 degree mining
Scheduling with economic sequential pits
Create pits in a preferred direction
Create a series of non-concentric pit shells
Targets high grade material
Honors maximum mining width
Fixes the gap issue
AutoP More realistic phase design
AutoP How it works
Mineable area divided into 15

horizontal sectors
Each sector evaluated based on mining arc angle range
Economics calculated for each sector
Sector economics weighted by factor (0-10)
Factor could change mining direction
AutoP How it works
AutoP How it works
AutoP How it works
Calculated Azimuth
Mining face arc degrees
AutoP parameters
BASE-Vary price pits
The GAP
AUTOP series of pits
New MSOPIT Starter pit option
AutoP
MultP









Options
MSVALP enhancements - Scheduling
Standard run
Base
Constant cutoff
Best
Worst
No phases or COG optimization used
Mines each pit independently top down
Base
Schedules pits sequentially ending with each pit
No COG optimization used
Best
Schedules pits sequentially ending with each pit
COG optimization used
SUM files for series options
Schedule by
period for each pit
PIVSUM creates a
pivoted file by pit
Workshop overview
MSEP enhancements
MSEP workflow
Analyzing MSEP results
Workshop overview
MSEP enhancements
MSEP workflow
Analyzing MSEP results
MSEP workflow
Basic MSEP tools
P60110.dat build GSF file
MSOPIT design pits
GETREP extract data from report files
MSVALP calculate schedules
PIVSUM pivot SUM files
MSEPc make charts and reports
MSEP workflow
Design
Calculate
Analyze
Redesign
Circular
Analysis

MSEP workflow
Pit phase design
MultP
AutoP
Select phases
Schedule with
MSVALP
Evaluation - MSEPc
Workshop overview
MSEP enhancements
MSEP workflow
Analyzing MSEP results
Workshop overview
MSEP enhancements
MSEP workflow
Analyzing MSEP results
MSEP results
3DBM and GSF Model views

Standard report files (rptval.*)

MSEPc charts and reports
Analyze
MSEP
results:
Model view periods and pushbacks
Model view Pit and pushback number
Model view Pit and pushback number
Model view AutoP pushback
MSVALP report
Pushback size
Stripping ratio
Value per ton
Summary of pushback economics
MSVALP report
Best case improves NPV from Base case
2.4B to 3.2B in the first 5 years
Stockpiled tons 83M
Analysis of schedules - example
MSEPc Schedule analysis
Selection of
phases
Sensitivity on
strategy
Production rates
Stockpile strategy
Cutoff strategy
MSVALP to
schedule
Examine results
MSEPc charts,
report
MS3D model
views
Cum PV & waste adjustment
Evaluating pits w/ MSEPc pgetrep.dat
$$$ effects of pushback design
MSVALP cutoff grade strategy
MSEPc sample report
MSEP Reporter the future