You are on page 1of 3

Attachment

PUNCHING SHEAR CHECK


(Based On ACI-318-02)

DATA :
Concrete Grade
Plate Width
Plate Height
Plate Thick

(fc')
(bplate)
(hplate)
(tplate)

Column Width
Column Height

(bcol)
(hcol)

Cover
X Reinf. Dia.
Y Reinf. Dia.

:
:
:
:

30
3000.000
6000.000
150.000

MPa
mm
mm
mm

150.000 mm
150.000 mm

(Cov.)
(Xreinf.)
(Yreinf.)

:
:
:

Vu

(Vu)

Mux

(Mux)

Muy

(Muy)

:
=
:
=
:
=

20 mm
16 mm
16 mm
0.5
5000.000
0
0.000
0
0.000

14200

ton
N
ton m
N mm
ton m
N mm

CALCULATION
Effective Dept at Critical Sec.

(d)

xre inf
y re inf 1
t. plate Cov
t. plate Cov 2 . 2
2

106.000 mm

Due to Mux
(b1)

= hcol + d
=
256.000 mm

(b2)

= bcol + d
=
256.000 mm

b1 < hplate ???


b2 < hplate ???
Percent Of Mux Resist By Shear
(ACI 318-02 Eq.11-41 & 13-1)

=
=
(gVx)

= 1
=

Area Of Critical Section.

Project Name

(Ac)

OK !!!
OK !!!

=
=

1
1 (2 / 3) b1 / b2
0.400

2(b1 b2 ).d
2
108544.000 mm

Attachment

Section Modulus Associated with


Critical Section

(J/C)

b1 .d (b1 3b2 ) d 3
3
3
9659426.667 mm

Section Modulus Associated with


Critical Section

(J/C')

b1 .d (b1 3b2 ) d 3
3
3
9659426.667 mm

(Cx)

= b1 / 2
128.000 mm

(C'x)

= b1 / 2
128.000 mm

Due to Muy
(b1)

256.000 mm

(b2)

256.000 mm

b1 < hplate ???


b2 < hplate ???
Percent Of Muy Resist By Shear
(ACI 318-02 Eq.11-41 & 13-1)

=
=
(gVy)

OK !!!
OK !!!

= 1

1
1 (2 / 3) b1 / b2

=
Area Of Critical Section.

(Ac)

(J/C)

(J/C')

=
=

(C'x)

Punching Shear Stress At Point A

(vuA)

(vuB)

9659426.667

b1 .d (b1 3b2 ) d 3
=
3

(vuC)

128.000 mm

= b1 / 2
=

128.000 mm

=
=

Punching Shear Stress At Point D

Max vu

Project Name

(vuD)

(vumax)

9659426.667

= b1 / 2
=

Punching Shear Stress At Point C

2
108544.000 mm

b1 .d (b1 3b2 ) d 3
3

Punching Shear Stress At Point B

2(b1 b2 ).d

=
(Cx)

0.400

Vu g Vx .Mux g Vy .Muy

Ac Jx / Cx
Jx / C ' y
0.046 N

Vu g Vx .Mux g Vy .Muy

Ac Jx / Cx
Jx / C ' y
0.046 N

Vu g Vx .Mux g Vy .Muy

Ac Jx / Cx
Jx / C ' y
0.046 N

Vu g Vx .Mux g Vy .Muy
=

Ac
Jx / Cx
Jx / C ' y
=

0.046 N

0.046 N

Attachment
Shear Capacity with the bo & d term removed to convert force to stress
(ACI 318-02 Eq. 11-33,11-34,11-35)
Perimeter Of Critical Area

(bo)

= 2xb1 + 2xb2
=
1024 mm

(bc)

= bCol / hCol
=

(fVc1)

2 fc'
1 bc 6

(fVc2)

2.328 N

s.d
fc'
2
bo
12

=
=

(fVc3)

1
=
3
=

Shear Capacity

Ratio

(fVc)

2.382 N

fc'
1.552 N

= min(fVc1, fVc2, fVc3)


=
1.552 N
= vumax / fVc
=
0.030

Reference :
1. SAFE Technical Note 1 (How SAFE Calculates Punching Shear)
2. ACI 318-02

Project Name