You are on page 1of 20

1

E l e c t r i c i t y D a t a Elektroenergetski podaci

Electricity Data 2004 Elektroenergetski podaci 2004.

HRVATSKA ELEKTROPRIVREDA

Hrvatska Elektroprivreda (HEP) is a group of companies wholly

Hrvatska elektroprivreda (HEP) grupa je trgovakih drutava u

owned by the state. (Under the Hrvatska Elektroprivreda Privatization

potpunom dravnom vlasnitvu. (Prema Zakonu o privatizaciji Hrvatske

Act, at least 51 percent of HEPs shares will remain in the state


ownership up until Croatia enters into the European Union.)

elektroprivrede, najmanje 51 posto dionica HEP-a ostat e u dravnom


vlasnitvu do ulaska Republike Hrvatske u Europsku uniju.)

HEP Generation is active in electricity and heat production (has

HEP-Proizvodnja se bavi proizvodnjom elektrine i toplinske energije

a public service obligation to produce electricity for tariff

(ima javnu obvezu proizvodnje elektrine energije za tarifne kupce).

customers). Besides HEP Generation, electricity in Croatia is


produced by TE Plomin d.o.o., a company co-owned by HEP d.d.
and RWE Power, which operates Plomin 2 thermal power plant
(210 MW), by industrial power plants and by private owners of
small renewable electricity sources.

Osim HEP-Proizvodnje, proizvodnjom elektrine energije u Republici


Hrvatskoj bavi se TE Plomin d.o.o., drutvo u suvlasnitvu HEP-a d.d.
i RWE Powera, koje upravlja termoelektranom Plomin 2 (210 MW),
zatim industrijski pogoni u vlastitim energanama i privatni vlasnici
malih obnovljivih izvora elektrine energije.

HEP Transmission System Operator (the company began to operate


in April 2005) and HEP Distribution System Operator (its
establishment is in preparation, currently a part of HEP
Distribution), are responsible for the public service of transmission
and distribution operation for participants in the Croatian
electricity market. HEP Distribution (or, after separation, HEP
Supply) is responsible for the supply of electricity to more than
2.1 million tariff customers in Croatia (the number of customers
refers to the number of metering points).

HEP-Operator prijenosnog sustava (drutvo otpoelo s radom u travnju


2005.) i HEP-Operator distribucijskog sustava (osnivanje u pripremi,
sada u sastavu HEP-Distribucije) zadueni su za javnu uslugu
upravljanja sustavom, prijenosa i distribucije elektrine energije za
potrebe sudionika na hrvatskom tritu, a HEP-Distribucija (odnosno,
nakon izdvajanja, HEP-Opskrba) zaduena je za opskrbu elektrinom
energijom vie od 2,1 milijuna tarifnih kupaca elektrine energije u
Hrvatskoj (broj kupaca se odnosi na broj mjernih mjesta).

Regarding supply to eligible customers (consuming more than


20 GWh/year), Hrvatska Elektroprivreda is exposed to the
conditions of a competitive market. New electricity undertakings
in the Croatian electricity market operate under licenses issued
by the Energy Regulatory Council (future Croatian Energy

U sferi opskrbe povlatenih kupaca (s godinjom potronjom veom


od 20 GWh), Hrvatska elektroprivreda je izloena uvjetima konkurencije
ostalih elektroprivrednih subjekata na tritu. Novi elektroprivredni
subjekti na hrvatskom tritu elektrine energije posluju u skladu s
dozvolom Vijea za regulaciju energetskih djelatnosti (budua Hrvatska

Regulatory Agency). Access to the network is based on a regulated


third-party access for all legal entities licensed to perform energy
activities or granted the status of eligible customer by the Agency.

agencija za regulaciju energetskih djelatnosti). Pristup mrei ostvaruje


se na nain reguliranog pristupa tree strane (RTPA) za sve pravne
osobe koje ishode dozvolu za obavljanje energetske djelatnosti ili
status povlatenog kupca od Agencije.

The Croatian electricity system is of great transit importance for


electricity supply in other countries in the vicinity of Croatia. In
2004, the reconstructed 400/110 kV Ernestinovo substation near
Osijek and the newly constructed 400/200/110 kV erjavinec
substation near Zagreb, together with the appurtenant
transmission lines, were put into service. The operation of these
substations made it possible, on October 10 of the same year,
to reconnect the whole of the UCTE area into a single synchronous
zone. The reconnection process was controlled from Hrvatska
Elektroprivredas seat in Zagreb. The strengthening of the
transmission network in Croatia continued by reconstructing the
220 kV Brinje switchyard into the 220/35 kV Brinje substation,
which was completed in April 2005.

Hrvatski elektroenergetski sustav ima golemi tranzitni znaaj za


opskrbu elektrinom energijom za drave u bliem okruenju Republike
Hrvatske. Godine 2004. u pogon su putene obnovljena TS 400/110
kV Ernestinovo kod Osijeka i novoizgraena TS 400/220/110 kV
erjavinec kod Zagreba s pripadnim dalekovodima. Pogon ovih
objekata omoguio je 10. listopada iste godine ponovno povezivanje
itavog podruja UCTE-a u jednu sinkronu zonu. Povezivanjem je
upravljano iz sjedita Hrvatske elektroprivrede u Zagrebu. Snaenje
prijenosne mree u Hrvatskoj nastavljeno je rekonstrukcijom rasklopnog
postrojenja 220 kV Brinje u transformatorsku stanicu 220/35 kV
Brinje koja je dovrena u travnju 2005. godine.

HEP Group Organizational Structure Organizacijska struktura HEP grupe

Management Boards
Office
Ured Uprave

Market Operator
Operator trita
energije d.o.o.

TE Plomin d.o.o.
50%

Economic Affairs Division


Direkcija za ekonomske
poslove
Legal, Personnel and
Administrative Division
Direkcija za pravne,
kadrovske i ope
poslove

Companies outside HEP Group


Drutva izvan HEP grupe

HEP Trade Department


Sektor HEP Trade

NE Krko d.o.o.
50%

HEP d.d.

Development Department
Sektor za razvoj
Information Technology
Department
Sektor za poslovnu
informatiku

Hydro
Department
Sektor za
hidroelektrane

Internal Audit and Control


Department
Sektor za internu
reviziju i kontrolu

Generation
HEP - Proizvodnja
d.o.o.

Thermal
Department
Sektor za
termoelektrane

Technical
Support
Department
Sektor za
tehniku
potporu

Transmission
Areas (4)
Prijenosna
podruja (4)

Economic
Technical
Affairs
Department
Department
Sektor za
Sektor
za
tehnike
ekonomske
poslove
poslove

CS Buko
Blato d.o.o.

Transmission
System Operator
HEP Operator
prijenosnog sustava
d.o.o.

District Heating
Toplinarstvo Sisak
d.o.o.

System
Operation
Department
Sektor za voenje
sustava

Gas
HEP - Plin
d.o.o.

Distribution
HEP - Distribucija
d.o.o.
Energy Services
HEP - ESCO
d.o.o.

Economic
Affairs
Department
Sektor za
ekonomske
poslove

Distribution
Areas (21)
Distribucijska
podruja (21)

District Heating
HEP - Toplinarstvo
d.o.o.

Supply
HEP - Opskrba
d.o.o.

Environmental
Services
APO usluge zatite
okolia d.o.o.

Croatian Electricity System Hrvatski elektroenergetski sustav


Transmission network (400 kV, 220 kV, 110 kV) in Croatia, connections with neighboring systems
Prijenosna mrea (400 kV, 220 kV, 110 kV) u Republici Hrvatskoj, povezanost sa susjednim elektroenergetskim sustavima

750 kV overhead line / nadzemni vod


400 kV double circuit overhead line / dvostruki nadzemni vod
400 kV planned double circuit overhead line / planirani dvostruki nadzemni vod
400 kV overhead line / nadzemni vod
400 kV planned overhead line / planirani nadzemni vod
220 kV double circuit overhead line / dvostruki nadzemni vod
220 kV overhead line / nadzemni vod
220 kV heavy overhead line / teki nadzemni vod
110 kV overhead line (240 mm2) / nadzemni vod
110 kV heavy overhead line / teki nadzemni vod
110 kV double circuit overhead line / dvostruki nadzemni vod
110 kV overhead line (<150 mm2 and less/i manje) nadzemni vod
110 kV cable / kabel
750/440 kV
400/220/110 kV
400/110 kV
220/110 kV
110/x kV
Railroad substations/EVP
Thermal power plant/TE
Hydro power plant/HE
Industrial thermal power plant/Industrijska TE

as at December 31, 2004


stanje 31 prosinca 2004.

Electricity Balance 2004 Elektroenergetska bilanca za 2004.

Hydro production 7,001


Proizvodnja HE

Thermal production 4,069


Proizvodnja TE
NE Krko
d.o.o. 2,606

TE Plomin
d.o.o. 1,320

Own production
HEP Generation d.o.o. 11,069
Vlastita proizvodnja
HEP-Proizvodnja d.o.o.

Purchase 2,572
Kupnja*

Total production 14,955


Ukupna proizvodnja
Total electricity 17,567
Ukupna elektrina energija

Available electricity 16,095


Raspoloiva elektrina energija

Transmission losses 587


Gubici u prijenosu

Gross consumption on distribution network 15,328


Bruto potronja na mrei distribucije

Sale outside Croatia 1,472


Prodaja izvan RH
Distribution losses 1,637
Gubici u distribuciji

Auxiliary consumption 180


Consumption on distribution network 13,691
Vlastita potronja**
Potronja na mrei distribucije

* Includes supply from Bosnia and Herzegovina power company (720 GWh) under long-term contract
Uraunata i nabava od Elektroprivrede BiH (720 GWh) temeljem viegodinjeg ugovora
** Includes energy for Velebit hydro plant pumping (133 GWh) and other auxiliary consumption (consumption by heating in EL-TO and TE-TO Zagreb and by water meter in Varadin plant)
Uraunata energija za crpni rad RHE Velebit (133 GWh) te ostala vlastita potronja (potronja toplinarstva u EL-TO i TE-TO Zagreb i vodomjera u HE Varadin)

Electricity Balance (GWh) Elektroenergetska bilanca (GWh)

2003

2004

Change (%)
Promjena (%)

Hydro production
Proizvodnja HE

4,897

7,001

43.0

Thermal production
Proizvodnja TE

5,087

4,068

-20.0

Own production
Vlastita proizvodnja

9,984

11,069

10.9

NE Krko d.o.o.
NE Krko d.o.o.

1,623

2,606

60.6

TE Plomin d.o.o.
TE Plomin d.o.o.

1,616

1,320

-18.3

Purchase
Kupnja

2,659

2,572

4.7
-3.3

-355

-1,472

314.6

15,527

16,095

3.7

Transmission network losses


Gubici na mrei prijenosa

660

587

-11.1

Auxiliary consumption on transmission network


Vlastita potronja na mrei prijenosa

130

180

-38.5

Gross consumption on distribution network


Bruto potronja na mrei distribucije

14,737

15,328

4.0

Consumption on distribution network


Potronja na mrei distribucije

13,644

14,458

6.0

1,883

1,637

2.6
-13.1

15,527

16,095

3.7

Sale to other power companies


Prodaja drugim elektroprivredama
Available electricity Raspoloiva elektrina energija

Excange, purchase, sale and supply outside Croatia


Gubici i neobraunata potronja na mrei distribucije
Gross consumption of electricity
Bruto potronja elektrine energije

Electricity Flows in 2004 Tokovi elektrine energije u 2004. (GWh)

5,126
1,943
SLO

3,680

1,037
3,183

3,725

1,943
SiCG

45
679

1,178

BiH
146

1,304

actual flows ostvareni tokovi


contractual flows ugovoreni tokovi
free flows slobodni tokovi

Monthly electricity transit (2003 - 2004)


Mjeseni tranzit elektrine energije (2003. - 2004.)

400,000
350,000
300,000
250,000
200,000
150,000
100,000
50,000
MWh 0

10

11

2003

12 month mjesec

2004

Electricity Consumption Potronja elektrine energije

Electricity consumption 1995-2004


Potronja elektrine energije 1995.-2004.

Distribution
Distribucija

Customers at 110 kV
Kupci na 110 kV

Change Consumption
Potronja
Promjena
GWh
%

Transmission losses +
in-plant consumption
Gubici u prijenosu
+ vlastita potronja

Change Consumption
Promjena
Potronja
%
GWh

Total consumption
Ukupna potronja

Change Consumption
Potronja
Promjena
GWh
%

Change
Promjena
%

15.28

11,404

3.31

444

6.99

12,058

5.73

25.39

444

0.00

12,793

6.10

753

17.29

498

12.16

13,354

4.39

1.59

824

9.43

556

11.65

13,675

2.40

12,251

-0.36

883

7.16

702

26.26

13,836

1.18

2001

12,857

4.95

877

-0.68

721

2.71

14,455

4.47

2002

13,151

2.29

871

-0.68

809

12.21

14,831

2.60

2003

13,919

5.84

818

-6.04

790

-2.32

15,527

4.69

2004

14,437

9.78

892

8.98

766

-3.02

16,095

3.66

Year
Godina

Consumption
Potronja
GWh

1995

10,405

5.28

584

-26.63

415

1996

11,102

6.70

512

-12.33

1997

11,707

5.45

642

1998

12,103

3.38

1999

12,295

2000

Final electricity consumption per sector 1995-2004


Struktura finalne potronje elektrine energije 1995.-2004.

Industry (HV, MV)


Industrija (VN, SN)

LV - Households
NN - Kuanstva

Change Consumption
Potronja
Promjena
GWh
%

LV - Commercial and
public lightning
NN - Poduzetnitvo i
javna rasvjeta

Change Consumption
Promjena
Potronja
%
GWh

Total consumption
Ukupna potronja

Change
Promjena
%

Consumption
Potronja
GWh

Change
Promjena
%

2,611

8.70

9,927

3.60

5.99

2,841

8.81

10,306

3.82

5,190

5.96

3,053

7.46

11,039

7.11

-0.36

5,267

1.48

3,049

-0.13

11,102

0.57

2,759

-0.97

5,742

9.02

3,198

4.89

11,699

5.38

2000

2,809

1.81

5,729

-0.23

3,286

2.75

11,824

1.07

2001

2,850

1.46

5,560

-2.95

3,490

6.21

11,900

0.64

2002

3,508

23.09

5,954

7.09

3,053

-12.52

12,515

5.17

2003

3,425

-2.37

5,694

-4.37

3,735

22.33

12,854

2.71

2004

3,923

14.55

6,072

6.64

3,621

-3.04

13,617

5.93

Year
Godina

Consumption
Potronja
GWh

1995

2,695

-9.32

4,621

9.81

1996

2,567

-4.75

4,898

1997

2,796

8.92

1998

2,786

1999

Electricity Consumption Potronja elektrine energije

Final electricity consumption per sector 1995-2004


Struktura finalne potronje elektrine energije 1995.-2004.

100
90
80
70
60
50
40
30
20
10
% 0

26

28

28

27

27

28

29

24

27

24

27

25

25

25

24

24

24

28

29

27

47

47

47

48

49

48

47

48

44

49

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2003

2004

Households Kuanstva

Industry Industrija - VN i SN

Commercial and public lightning NN - Poduzetnitvo i javna rasvjeta

Final electricity consumption per sector 1995-2004


Finalna potronja elektrine energije 1995.-2004.

14,000
12,000
10,000
8,000
6,000
4,000
2,000
GWh 0
1995

1996

1997

Households Kuanstva

1998

1999

2000

2001

Industry Industrija - VN i SN

Commercial and public lighting NN - Poduzetnitvo i javna rasvjeta

2002

System Load Optereenje sustava

System load 1995 - 2004


Optereenje sustava 1995. - 2004.
Year
Godina

Pmax
MW

Pmin
MW

Pmin/Pmax
%

Wd
MWh

1995

2,097

1,151

54.89

42,178

1996

2,471

1,314

53.18

47,143

1997

2,417

1,328

54.94

48,172

1998

2,585

1,316

50.91

51,168

1999

2,600

1,468

56.46

51,266

2000

2,661

1,556

58.47

54,059

2001

2,796

1,601

57.26

56,899

2002

2,685

1,586

59.07

54,617

2003

2,673

1,546

57.84

53,334

2004

2,792

1,626

58.24

55,830

Pmax- Peak system load


Maksimalno optereenje sustava
Pmin- Minimum system load on
the day of Pmax
Minimalno optereenje u danu
ostvarenog Pmax
Wd- Maximum daily consumption
Maksimalna dnevna potronja

3,000
2,500
2,000
1,500
1,000
500

Pmax
Pmin

MW 0
1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

Daily load curve winter / summer 2004 Dnevni dijagrami optereenja zima / ljeto 2004.

2,300
2,200
2,100
2,000
1,900
1,800
1,700
1,600
1,500
1,400
1,300
1,200
1,100
1,000
900
800
700
600
MW 500

Typical winter Wednesday (Jan 18, 2004)


karakteristina zimska srijeda (18.1.2004.)
Typical summer Wednesday (Jul 21, 2004)
karakteristina ljetna srijeda (21.7.2004.)

12

18

24h Hour Sat

System Load Optereenje sustava

Maximum monthly system load 2002 - 2004


Maksimalna mjesena optereenja sustava 2002. - 2004.

3,000

2002

2003

2004

2,500
2,000
1,500
1,000
500

MW 0
3

10

11

12

month mjesec

Annual load duration curve


Godinja krivulja trajanja optereenja

2002

3,000

2003

2004

2,500
2,000
1,500
1,000
500
MW 0

2,900
2,800
2,700
2,600
2,500
2,400
2,300
2,200
2,100
2,000
MW

652 1,303 1,954 2,605 3,256 3,907 4,558 5,209 5,860 6,511 7,162 7,813 8,464 hours sati

1 26 51 76 101 126 151 176 201 226 251 276 301 326 351 376 401 426

System Load Optereenje sustava

Daily curve of maximum and minimum system load 2002 - 2004


Dnevni dijagrami najveih i najmanjih optereenja sustava 2002. - 2004.

3,000

3,000

2,685

2,673
24/12/2003

17/12/2002

3,000

2,500

2,500

2,500

2,000

2,000

2,000

1,500

1,500

1,500

1,000

1,000

1,000
923

500

1,014

MW 0

13/06/2004

25/05/2003

500

500
MW 0

MW 0

23/12/2004

986

20/05/2002

2,792

12

Max 2002

18

24h

Min 2002

12

Max 2003

18

24h

Min 2003

12
Max 2004

18

24h

Min 2004

Hourly system load 2004


Satno optereenje sustava 2004.

3,000

2,500

2,000

1,500

1,000

500

MW 0
1 413 825 1237 1649 2061 2473 2885 3297 3709 4121 4533 4945 5357 5769 6181 6593 7005 7417 7829 8241 8653
Data do not include pumping for hydro power plants. Podaci ne ukljuuju crpni rad hidroelektrana.

hour sat

Generating Plants Proizvodni kapaciteti

Available capacity of generating plants (net)*


Raspoloiva snaga proizvodnih kapaciteta (na pragu)*

Plomin 2
thermal power plant
(TE Plomin d.o.o.)

5.1%
205

TE Thermal power plants

205

(HEP-Proizvodnja d.o.o.)

338

34.4%
1,373

Krko nuclear
power
plant - 1/2
338
(NE Krko d.o.o.)

8.5%

Total
Ukupno
3,995 MW

1.398
2.071

2,079 HE Hydro power plants


(HEP-Proizvodnja d.o.o.)

52.0%
* Excluding 15 MW in diesel power plants (reserve) and 650 MW in thermal power plants outside Croatia, unavailable since 1991/1992. Since 2003, based on HEPs investments
in Tuzla (200 MW) and Kakanj (50 MW) thermal power plants, HEP has been receiving electricity again from the power company of the Bosnia and Herzegovina.
Nije prikazano 15 MW dizel elektrana (rezerva) i 650 MW termoelektrana izvan Hrvatske, neraspoloivih od 1991./1992. Od 2003. HEP na ime ulaganja u TE Tuzla (200 MW)
i TE Kakanj (50 MW) ponovo preuzima elektrinu energiju od Elektroprivrede BiH.

Generating capacity 1995 - 2004 - total


Izgraenost proizvodnih kapaciteta 1995. - 2004. - ukupno
MW

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

Hydro power plants


Hidroelektrane

2,075

2,076

2,076

2,076

2,076

2,076

2,076

2,063

2,071

2,079

Conventional thermal plants*


1,938
TE klasine*

1,930

1,930

1,930

2,140

2,140

2,350

2,350

2,350

2.350

332

332

332

332

332

332

354

354

354

354

51

51

35

35

29

29

29

29

29

15

4,396

4,389

4,373

4,373

4,577

4,577

4,809

4,796

4,804

4,798

Krko nuclear power plant


NE Krko (1/2)
Diesel power plants
Dizel elektrane
Total Ukupno

* Gross capacity includes 650 MW in thermal plants outside Croatia and Unit 2 at Plomin (TE Plomin d.o.o.)
Snaga na generatoru; ukljueno 650 MW termoelektrana izvan Hrvatske i blok 2 u TE Plomin, 210 MW (TE Plomin d.o.o.)

5,000
4,000
3,000
2,000
1,000
MW 0
1995

1996

Hydro power plants Hidroelektrane


Diesel power plants Dizel elektrane

1997

1998

1999

2000

2001

Conventional thermal power plants Klasine termoelektrane*

2002

2003

2004 Year Godina

Krko nuclear plant NE Krko(1/2)

Generating Plants Proizvodni kapaciteti

Generating capacity per source of energy - total (gross) Izgraenost prema energetskoj strukturi - 1995.-2004. - ukupno (na generatoru)
MW

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

Hydro
Hidroenergija

2,075

2,076

2,076

2,076

2,076

2,076

2,076

2,063

2,071

2,079

Hard coal*
Kameni ugljen*

105

105

315

315

315

315

315

315

315

315

Lignite**
Lignit**

650

650

650

650

650

650

650

650

650

650

1,183

1,175

1,175

1,175

1,175

1,175

1,175

1,385

1,385

1,385

332

332

332

332

332

332

354

354

354

354

51

51

35

35

29

29

29

29

29

15

4,396

4,389

4,583

4,583

4,577

4,577

4,599

4,796

4,804

4,798

Oil/gas
Loivo ulje/prirodni plin
Nuclear
Nuklearna energija
Diesel
Dizel
Total Ukupno

*Plomin thermal power plant with both units Termoelektrana Plomin s oba bloka
**Thermal power plants outside Croatia (Obrenovac, Tuzla, Kakanj and Gacko) Termoelektrane izvan Hrvatske (Obrenovac, Tuzla, Kakanj i Gacko)

Generating capacity per sources of energy Energetska struktura izvora

5,000

0.3%
7.6%

4,000

29.7%

3,000
2,000

13.9%
6.8%

1,000

44.6%

MW 0
1995

1996

1997

1998

1999

2000

2001

Hydro Hidroenergija
Hard coal Kameni ugljen*
Lignite Lignit**
Oil/ gas Loivo ulje/prirodni plin
Nuclear Nuklearna energija
Diesel Dizel

2002

2003

2004

Year Godina

Generating Plants Proizvodni kapaciteti


HEP Generation HEP Proizvodnja d.o.o.
Hydro power plants Hidroelektrane
minimum
safe output
tehniki
minimum

available capacity (MW)


raspoloiva snaga (MW)

Pogon HE Varadin A,B,C*


Pogon HE akovec A,B,C,D
Pogon HE Dubrava A,B,C,D,E
Pogon HE Rijeka A,B
Pogon HE Vinodol A,B,C
CHE Fuine A
CHE Lepenica
HE Zeleni Vir
Pogon HE Senj A,B,C
HE Sklope A
Pogon HE Gojak A,B,C
Pogon HE Ozalj A,B,C,D
Pogon RHE Velebit A,B
Pogon HE na Krki
HE Miljacka A,B,C,D
HE Kri
HE Golubi A,B
HE Jaruga A,B
Pogon HE Perua A,B
HE Orlovac A,B,C
Buko Blato d.o.o.
CS Buko Blato A,B,C
Pogon HE ale A,B
Pogon HE Kraljevac A,B,C
Pogon HE Zakuac A,B,C,D
Pogon HE Dubrovnik A,B
HE Zavrelje

generator generator

total ukupno

2x47+0.46
2x40.3+1.1+0.34
2x40.3+1.1+2x0.34
2x18
3x30
4/(-4.8)
1.4(-1.25)
1.44
3x72
22,5
3x16
2x1+0.8+2x1.1
2x138/(2x-120)

94.46
82.04
82.38
36
90
4/(-4.8)
1.4(-1.25)
1.44
216
22,5
48
5,24
276/(-240)

2x18
2x15
2x15
2x9

4.8+3x6.4
0.34
2x3.27
2x3.6
2x20.8
3x79

24
0,34
6,54
7,2
41,6
237

3x3.8/3x(-3.4)
2x20.4
2x20.8+4.8
2x108+2x135
2x108
2

11.4/(-10.3)
40,8
46,4
486
216
2

Total hydro power plants Ukupno HE

type
tip elektrane
run-of-river protona
run-of-river protona
run-of-river protona
run-of-river protona
storage akumulacijska
storage akumulacijska
storage akumulacijska
storage akumulacijska
storage akumulacijska
storage akumulacijska
run-of-river protona
run-of-river protona
storage akumulacijska

3x33
3x2
80

run-of-river protona
run-of-river protona
run-of-river protona
run-of-river protona
storage akumulacijska
storage akumulacijska

1
5
50
0.81
6
1
50+80
50

storage akumulacijska
storage akumulacijska
run-of-river protona
storage akumulacijska
storage akumulacijska
storage akumulacijska

2,078.74/(-256.35)

*Designations of units Oznake agregata: CS - pumping station crpna stanica CHE - pumped storage hydro plant crpna HE RHE - reversible hydro plant reverzibilna HE HE - hydro power plant hidroelektrana

Thermal power plants Termoelektrane


available capacity (MW)
raspoloiva snaga (MW)
generator generator net output prag
Pogon TE Sisak A,B
Pogon TE Rijeka A
Pogon TE Plomin - TE Plomin1 A
Pogon KTE Jertovec A,B
Pogon TE-TO Zagreb C,K
Pogon TE-TO Osijek A
PTE Osijek B,C
Emergency diesel Interventne diesel (4)
reserve priuva
Pogon EL-TO Zagreb A,B,H1,H2
Total Thermal power plants Ukupno TE

minimum
safe output
tehniki minimum (MWel)

heating
output
toplina na
pragu (MWt)

heating
output
toplina
na pragu (t/h)

2x210
320
120
2x42.5
110+202
45
2x25

396
303
110
83
312
42
47

90+90
90
60
20+20
12+60+90
10
1+1

480
90
34

150
70

15
11+30+2x24

0
80

3+5+2x1

300

180

1,456

1,373

904

400

fuel
gorivo
oil / gas l. ulje/p. plin
oil / l. ulje
coal ugljen
n. gas / p. plin/ELU
oil / gas l. ulje/p. plin
oil / gas l. ulje/p. plin
n. gas / p. plin/ELU
D2
n. gas / p. plin/ELU

oil l.ulje-loivo ulje n.gas-natural gas p.plin-prirodni plin ELU - extra light oil extralako ulje D2-special oil used in emergency power plants specijalno ulje za pogon interventnih elektrana

Total UKUPNO HEP Proizvodnja d.o.o.


Plomin 2* thermal plant(B) TE Plomin 2

3,526.74

3,451.74

210
37

205

353,5

338

110

coal kameni ugljen

*Owned by TE Plomin 2-TE Plomin d.o.o. (50%:50% HEP and RWE Power)-O&M Contract TE Plomin 2-u vlasnitvu TE Plomin d.o.o. (HEP i RWE Power 50%:50%), HEP Proizvodnja d.o.o. - O&M ugovor

Krko nuclear plant (50%)A NE Krko

32

UO2

*Half of total capacity - at HEP d.d. disposal based on co-ownership in NE Krko d.o.o. (HEP d.d. and ELES Gen 50%:50%) Prikazanom snagom raspolae HEP d.d., temeljem suvlasnitva u NE krko d.o.o. (HEP d.d. i ELES Gen 50%:50%)

Total UKUPNO HEP - Proizvodnja d.o.o. +


Plomin 2 thermal plant + Krko nuclear plant 4,090.24

3,994.74

Electricity Generation Proizvodnja elektrine energije

Electricity generation and procurement 1995-2004


Proizvodnja i nabava elektrine energije 1995.-2004.
GWh

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

Hydro power plants


Hidroelektrane

5,164

7,190

5,260

5,428

6,531

5,841

6,550

5,372

4,897

7,001

Thermal* & diesel power plants


Termoelektrane* i dizel elektrane

2,740

2,520

3,578

4,561

4,768

3,958

4,713

5,899

6,703

5,388

Krko nuclear power plant


NE Krko

2,279

2,182

2,393

1,250

1,623

2,606

Imports** - exports
Uvoz** - Izvoz

1,221

166

1,562

2,115

2,376

4,037

3,192

3,560

2,304

1,100

11,404

12,058

12,793

13,354

13,675

13,836

14,455

14,831

15,527

16,095

Total Ukupno

* Includes generation by Plomin 2 (procurement from TE Plomin d.o.o.) Uraunata proizvodnja TE Plomin 2 (nabava od TE Plomin d.o.o.)
**Includes procurement from Bosnia and Herzegovina power company (since 2003) Uraunata nabava od Elektroprivrede BiH (od 2003.)

20,000
6,8%
15,000

16.2%

10,000

33.5%

5,000
43.5%
GWh 0
1995

1996

1997

1998

Hydro power plants Hidroelektrane


Krko nuclear power plant NE Krko

1999

2000

2001

2002

2003

2004

*Thermal and diesel plants Termoelektrane i dizel agregati


**Imports - exports Uvoz - Izvoz

Electricity Generation Proizvodnja elektrine energije

Electricity generation per source of energy 1995-2004


Proizvodnja elektrine energije prema energentima 1995.-2004.
GWh

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

Hydro
Hidroenergija

5,164

7,190

5,260

5,428

6,531

5,841

6,550

5,372

4,897

7,001

205

102

456

483

448

1,401

1,476

1,910

2,181

1,931

Oil/Gas
Loivo ulje/prirodni plin

2,462

2,417

3,105

4,067

4,319

2,557

3,237

3,960

3,936

3,457

Nuclear
Nuklearna energija

2,279

2,182

2,393

1,250

1,622

2,606

73

17

11

29

10,183

11,892

11,231

11,239

11,299

9,799

11,263

11,271

Hard coal
Kameni ugljen

Diesel
Diesel
Total Ukupno

12,636 14,995

14,000
17.4%
12,000
10,000

23.1%

8,000

12.9%

6,000
4,000

46.7%

2,000
GWh 0
1995

1996

1997

1998

1999

2000

2001

Hydro Hidroenergija
Hard coal Kameni ugljen
Oil/ gas Loivo ulje/prirodni plin
Nuclear Nuklearna energija

2002

2003

Diesel Dizel

2004

Substations and Lines Transformatorske stanice i vodovi

Lines (km) Vodovi (km)

Substations Transformatorske stanice


Voltage level
Naponska razina

Voltage(kV)
Naponska razina

Total
Ukupno

4,400.0

400 kV

1,158.9

1,158.9

0.0

4,100.0

220 kV

1,144.5

1,144.5

0.0

300.0

110 kV

4,658.7

4,540.4

118.3

4,474.4

114.3

3,000.0

2,250.0

70.0

66.0

4.0

750.0

Belong to HEP
Transmission
Pripada HEP- Prijenosu
Belong to HEP
Distribution
Pripada HEP-Distribuciji

4,588.7

11

35, 20, 10 kV

38,359.0

27,354.0

11,005.0

127

6,734.5
0,4 kV

90,141.0

69,009.0

21,132.0

97

4,652.0

523.0
6,962.1

6,843.8

118.3

128,500.0

96,363.0

32,137.0

Number
Broj

MVA

400/x kV

Belong to HEP Transmission


Pripada HEP-Prijenosu
Belong to HEP Generation
Pripada HEP-Proizvodnji
220/110 kV
Belong to HEP Transmission
Pripada HEP-Prijenosu
Belong to HEP Generation
Pripada HEP-Proizvodnji
110/x kV
Belong to HEP Transmission
Pripada HEP-Prijenosu
Belong to Distribution
Pripada HEP-Distribuciji
Belong to Generation
Pripada HEP-Proizvodnji
Total belonging to HEP
Ukupno pripada HEP-u
Belong to H (railroad)
Pripada Hrvatskim eljeznicama
Belong to industrial consumers
Pripada industrijskim kupcima
35(30)/10(20) kV
10(20)/0.4 kV
High voltage (400, 220, 110 kV)
Visoki napon (400, 220, 110 kV)
Medium and low voltage
Srednji i niski napon

476.0
105

5,651.0

16

232.5

851.0

355

4,150.0

23,991

7,073.4

144

14,134.5

24,346

11,223.4

122

13,051.0

24,346

11,223.4

Belong to HEP
Pripada Hrvatskoj elektroprivredi
High voltage (400, 220, 110 kV)
Visoki napon (400, 220, 110 kV)
Medium and low voltage
Srednji i niski napon

High voltage
Visoki napon
Medium and low voltage
Srednji i niski napon

Overhead Undergroud
Kabel
Nadzemno

Electricity Data 2004 Elektroenergetski podaci 2004.

Electricity Data 2004 Elektroenergetski podaci 2004.


HRVATSKA ELEKTROPRIVREDA
Data supplied by: HEP-Transmission System Operator d.o.o.
Podaci: Hrvatski nezavisni operator sustava i trita d.o.o.
Planning and System Services Sector Sluba za planiranje i usluge sustava
HEP d.d. Public Relation Section Odjel za odnose s javnou
Zagreb, Ulica grada Vukovara 37, Croatia
Tel. +385/1/63-22-111 Fax +385/1/61-70-430
http://www.hep.hr

ISSN 1334-8299